1994, 12-30 Sewer MemorandumM Ev M O R A N D U M
TO: Division of Buildings - Attn: Jeff Forry
FROM: Division of Utilities
DATE: la -30-1+
RE: Incomplete/ Unapproved Side Sewer Connection (New Construction)
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Project #
Site Address: E. ( 1 OO $ T AIA C.. Parcel:
Owner:MCj,IAITkAy MFApOW iAOM%a-5 contractor: �AVC kETGNCiZ
Date Inspected: 1 2--30-c% Or Permit #: " 4' S_ 16(orl
The current side sewer installation status is unapproved. The Contractor
and/or Owner has been notified X17 i!s AWVP" to schedule a call-back
inspection. Please do not approve a final inspection until the following
conditions set forth by the Utilities Division have been met:
The side sewer
installation inspection
has not been completed
Otheer_: bIA,
S&-�,, t- \in,-
\i,., nod been c,onnac�FA
ko
l
y.
The Utilities Division will notify the Division of Buildings via a release
memo when conditions for approval of the side sewer installation have been
met.
Inspector: Sincerely,
\i
James A. Legat, P.E.
Acting Utilities Director
'SEWER CONNECTION INSPECTION REPORT
JSPECT. DATE : \2'30 -A4 PERMIT No. : Q k - S' (3C INSPECTOR ROGi`-P�
D D R E S S :
E.
11008
- g3 AVE
UBDIVISION
/
U.L.I.D.
:
PIPE TYPE k SIZE : 4 PVC D-3034
CONTRACTOR : )AVE KC7cF1ER
PARCEL No.
STN A\,I-
LOT : _ BLK :
START
LEDGEND
DASHED LINE WITH
ARROWS INDICATES
BORED SECTION OF
U COPY TO OWNER