Loading...
1994, 12-30 Sewer MemorandumM Ev M O R A N D U M TO: Division of Buildings - Attn: Jeff Forry FROM: Division of Utilities DATE: la -30-1+ RE: Incomplete/ Unapproved Side Sewer Connection (New Construction) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Project # Site Address: E. ( 1 OO $ T AIA C.. Parcel: Owner:MCj,IAITkAy MFApOW iAOM%a-5 contractor: �AVC kETGNCiZ Date Inspected: 1 2--30-c% Or Permit #: " 4' S_ 16(orl The current side sewer installation status is unapproved. The Contractor and/or Owner has been notified X17 i!s AWVP" to schedule a call-back inspection. Please do not approve a final inspection until the following conditions set forth by the Utilities Division have been met: The side sewer installation inspection has not been completed Otheer_: bIA, S&-�,, t- \in,- \i,., nod been c,onnac�FA ko l y. The Utilities Division will notify the Division of Buildings via a release memo when conditions for approval of the side sewer installation have been met. Inspector: Sincerely, \i James A. Legat, P.E. Acting Utilities Director 'SEWER CONNECTION INSPECTION REPORT JSPECT. DATE : \2'30 -A4 PERMIT No. : Q k - S' (3C INSPECTOR ROGi`-P� D D R E S S : E. 11008 - g3 AVE UBDIVISION / U.L.I.D. : PIPE TYPE k SIZE : 4 PVC D-3034 CONTRACTOR : )AVE KC7cF1ER PARCEL No. STN A\,I- LOT : _ BLK : START LEDGEND DASHED LINE WITH ARROWS INDICATES BORED SECTION OF U COPY TO OWNER