Loading...
2011, 10-25 Permit App: 11003392 RemodelProject Number: 11003392 Inv: I Application Date: 10/25/2011 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Proiect Information: Permit Use: DINING ROOM REMODEL W/EXT WALL Contact: MORSE, TIMOTHY I REPLACEMENT Address: 7102 E 10TH AVE C - S - Z: SPOKANE VALLEY, WA 99212-0115 Setbacks: Front Left: Right: Rear: Phone: (509) 000-0000 Group Name: Site Information:Project Name a �6,; 5IMMIX Plat Key: Name: WOODLAWN PARK District: Sout Parcel Number: 35244.1038 Block: Lot: SiteAddress: 7102 E 10TH AVE Owner: Name: MORSE, TIMOTHY I Location:: CSV Zoning: R-3 SF Res District Water District: 020 EAST SPOKANE Area: 8,260 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: b, Review Building Plan Review Address: 7102 E 10TH AVE SPOKANE VALLEY, WA 99212-011 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Released By: Originally Released: 10/25/2011 By: tmelbourn Permits: e a ,.....���o_ v� w�� - - — --- Building Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation So Ft Valuation 1&2 FAMILY R-3 VB DINING 0 $5,000.00 0 $5,000.00 Item Description RESIDENTIAL PERMIT FE WSBCCSURCHARGE SF PLNS RV W < 7999 SQ F ROOM REMODEL Totals: 0 $5,000.00 Units Unit Desc E 1 SELECT 1 SELECT T 1 SELECT Permit Total Fees: 0 $5,000.00 Fee Amount $111.25 $4.50 $44.50 $160.25 Operator: JD Printed By: JD Print Date: 10/25/2011 T Project Number: 11003392 Inv: I Application Date: 10/25/2011 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Notes: Payment Summary: _ Permit Tvue Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $160.25 $160.25 $44.50 $115.75 $160.25 $160.25 $44.50 $115.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 10/25/2011 Sp6llan000,**,*,' °� jValley° Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 Perm itcenter@sDoka neva I ley. org (Staff Use Only) G PERMIT NUMBER' �� 3 3 -I PERMIT FEE' RESIDENTIAL CONSTRUCTION PERMIT APPLICATION nI NEW CONSTRUCTION ADDITION/ REMODEL ACCESSORY BUILDING Q DECK / n OTHER SITE ADDRESS: kyC' ASSESSORS PARCEL NO.: 35 z&+i-f , i 0.3& LEGAL DESCRIPTION: BUILDING' OWNER NAME: -7-1 "A NAME: (1oAo+k i .' • 'v,00\Z_. ADDRESS: 7l V C 10'6, + A CITY: �p©kQ;^� vok l� e." STATE: kl A ZIP: (? /G Z( ? PHONE: 5bC1 - Z5 11g5b FAX: CELL: CONTACT NAME: PHONE: FAX: CELL: CONTRACTOR NAME: MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE NO.: EXPIRES: CITY BUSINESS LICENSE NO.: : fi-I ' DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE U & PROPOSED USE: � i �_; � � , , r, � . N � ;,.; � „� c:c ��� - t-tr.�.. re tr��ch_ �f-� ✓i e � t �_ , II v�r�'� r lnv` •� for G�oC' -f �(a:)��n ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: Dimensions: No. of Stories: Total Habitable Wk t Space: A) (/I Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ Finished Basement SQ FT: FT: Garage SQ FT: Deck/Covered Patio SQ Impervious Surface 30% Slopes on FT: Area: Property: No. of Bedrooms: I Construction Type: Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $ 5600 O(/--- DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature ]hti �,)) Date: 10 - Z S - i' ( Updated 1-11-11 Page 1 of 1 http: //www. spoka nevaIley.org/filestorage/ 124/938/210/948/ 1496/Build ing_Permit_-_Res idential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN ❑ Property lines and dimensions ❑ Setbacks to property lines ❑ Direction arrow pointing North and orientation to streets ❑ Distance between buildings ❑ Proposed/existing buildings (footprint and dimensions) ❑ Right of way/easement location & sizes ❑ Utilities, septic tank/drain field locations and distances ❑ Driveway approach size and location BUILDING PLANS(3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): ❑ Footing sizes and locations ❑ Supporting wood cripple walls or beams ❑ Perimeter concrete foundation wall sizes ❑ Thickened concrete pads supporting ❑ Crawlspace ventilation beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: ❑ Floor Joist direction, size and spacing ❑ WindowtM door location and sizes ❑ Header, beam or concrete lintel sizes ❑ Window well locations if applicable ❑ Brace wall panel locations ❑ Room usao labels ❑ Water heater and furnace locations ❑ Smoke detector locations ❑ Exhaust fan locations ❑ Attic and crawl space access locations ❑ Deck or concrete patio sizes and locations ❑ Fire Wall construction ❑ Roof Plan: ❑ Engineered truss direction and spacing ❑ Rafter and over frame direction, size and spacing ❑ Wall Section Detaiincluding: Roof ❑ Slope/ roofing material/ underlayment/ ice dam protection ❑ Sheathing size and type Ceiling ❑ Joist size and spacing Wall ❑ Height/ top plate/ stud size and spacing/ sole plate ❑ Exterior sheathing size and type Floor ❑ Joist size and spacing Foundation Wall ❑ Concrete or Masonry unit width ❑ Earth to wood separation distance Footing ❑ Size Radon ❑ Passive system with Emil vapor barrier Miscellaneous Construction Details ❑ Deck: ❑ Floor plan/ side view/ dimensions ❑ Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing ❑ Ridge, eave and valley lines ❑ Beam and girder size and location ❑ Truss or rafter size, spacing & connection ❑ Attic insulation/ air space baffle/ ventilation ❑ Size of ceiling gypsum wall board ❑ Siding/ exterior house wrap/ anchor bolts ❑ Insulation, vapor barrier, gypsum wall board ❑ Sheathing or concrete floor size/ insulation ❑ Footing bottom to finished ground level depth ❑ Horizontal & vertical reinforcement if any ❑ Reinforcement if any ❑ Active system with 6 mil vapor barrier ❑ Footings/ post/ and beam size and locations 0 Handrail / Guard height & spacing SCrrY OF 0000 p6l[ane ,,;OoValleys Target Date sheet For City Use Only PLUS Project Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. r Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contactdd by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1