Loading...
2001, 01-03 Permit: 01000069 SewerSPOKANE COUNTY DIVISION OF BUH.DING AND CODE ENFORCEMENT 1026 WEST BROADWAY AVENUE e SPOKANE, WA 99260-0050 (509) 477-3675 J Site Address: 11219 E 8TH AVE Permit Use: SEWER CONNECTION - OLD SPOKANE, WA 00000 Parcel Number: 45212.1527 Subdivision: OPP.TR. 1-354 Block: Lot: Zoning: UR -3 Urban Residential 3.5 Owner: TUCKER, ERIC Address: 11219 E. 8TH AVE Setbacks - Front: Left Right SPOKANE, WA 99208 Inspector: DAN HOWARD Water Dist: Pmject Number: 01000069 Inv: I Issue Date: 1/3/01 Permit Use: SEWER CONNECTION - OLD ORCHARD Applicant: WALDORF CONSTRUCTION PO BOX 840 NEWMAN LAKE, WA 99025 Phone: (509) 226-2055 Contact WALDORF CONSTRUCTION PO BOX 840 NEWMAN LAKE, WA 99025 Phone: (509)226-2055 Setbacks - Front: Left Right Rear: Group Name: Project Name: PERMIT(S) Riehto(Way Contractor: UNKNOWN Llceme a: UNKNOWN CONST IN ROW -SEWER 1 $10.00 Total Permit Fee: $10.00 Sewer Permit Cantracbw: WALDORF CONSTRUCTION Llcenwg: WALDOC•023QZ SEWER CONNECTION 1 $85.00 PROCESSINGFEE $15.W Total Permit Fee: $10000 PAYMENT SUMMARY Pae 1 of 1 NOTES PERMIT Processed By: BURRIS, ROBIN Printed By: SCHNEIDER, PENNY Tran Date Recce Payment Amt 1/3/01 65 $110.00�ic•_ Total Fees AmountPaid AmountOwinu I i $110.00 $110.00 $000 NOTICE It is the responsibility of the applicant bermittee, not Spokane County, to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requestetl. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yams abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of- way. Curb lines and fence lines are not necessarily Indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved streetcurb. The responsibility to comply with applicable setback provisions lies solely with the permittee --neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your properly lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at Ne owner's/perminee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking Is In place, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough in. before covering, and final. 6. MECHANICAL rough in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. AN permits require final Inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site Improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, onsfte drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permiVsite plan which must be rom- pleted prior to final approval of building or issuance of a Certificate of Occupancy. 8, MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails skirting, etc, installed, and prior to occupancy; completed inspection record card must be available on site. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections' in conjunction with commercial projects. CALL 477-3675 FOR INSPECTIONS. TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE. YOURINSPECTORIS UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES: • Road cuts for utilities or driveways, Division of Engineering & Roads a Sewer connection, Division of Utilities 477-3600 477-3604 or State Department of Transportation or City Public Works Department 456-3000 625 63W • On-site waste disposal system Spokane Regional Health District • Electrical wiring, State Department of Labor and Industries 324-1560 324-2640 • Construction In a flood plain. Division of Engineering & Roads 477-3600 PERMIT EXPIRATIDN AND REFUNDS Unless otherwise noted this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one War of the date of expiration for one-half the original fee, subject to certain limilalions�blease call us if you have any questions. All refund requests must be made in writing by the applicautTermaree (shown on the reverse) no later than 180 days after the date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after fee payment. MISTAKE? It you think we've made an error In processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Division of Building and Code Enforcement at the address found on the face of this permit. I certify that I am the owner or am authorized by the owner to make this application and that I have examined this permiVapplication, state that the information contained In It and submitted by me or my agent to compile Said permiVapplication is true and correct, and authorize Spokane County to proceed with processing. In atltlition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and agree to comply with same. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. I understand that the issuance of this permiVapplication and any subsequent inspection approvals or Certificates of Occupancy shall not be construed to give authority to violate or cancel the provisions of any state or local law regulating construction or agreement concerning this property, oras a warranty of conformance with the provisions of any state or local laws regulating construction. SIGNATURE OF APPLICANT/PERMITTEE / APPLICATION '_ OR AUTHORIZED AGENT ��_��i.ti�'-C;, ? �___. DATE / _i -Z/ —__-