Loading...
HomeMy WebLinkAbout2001, 01-18 Permit: 01000324 Plumbing FixturesSPOKANE COUNTY DIVISION OF BUILDING AND CODE ENFORCEMENT 1076 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 (509) 477-3675 Site Address: 11219E 81'HAVE PermitUse FLOOR DRAIN, REVERSAL AND ELIMINATE SEWAGE SPOKANE, WA 00000 Parcel Number: 452121527 Subdivision: OPP. FR. 1-354 Black: Wt: Zoning: UR -3 Urban Residential 3.5 Owner: TUCKER, ERIC Address: 11219 E. 8TH AVE Phone: (509)226-2055 SPOKANE, WA 99208 Inspector: DAN HOWARD Water Dist. Project Number: 01000324 far: I Issue Date: 1/18/01 PermitUse FLOOR DRAIN, REVERSAL AND ELIMINATE SEWAGE EJECTOR Applicant: WALDORF CONSTRUCTION PO BOX 840 NEWMAN LAKE, WA 99025 Phone: (509)226-2055 Contact: WALDORF CONSTRUC I PON PO BOX 840 NEWMAN LAKE, WA 99025 Phone: (509)226-2055 Setbacks -Front: Left. Right: Rear: Group Noma Project Nome: Plumbing, Perm $ Cunhvctor: WALDORF CONSTRUCTION Licensers: WALDOC-023QZ FLOOR DRAINS 1 $600 SEWAGE EJECTOR 1 SGRO WATER PIPING -DWV 1 $600 PROCESSING FEE $2500 Total Permit Fee: $43. W PAYMENT SUMMARY page 1 of 1 NOTES PERMIT Processed By: CUMIOINGS, KATHY Printed By: SCHNEIDER, PENNY Tran Date Receipt # Payment Amt 1/18/01 308 $43,00 t_.. SL Total Fees AmountPaid AmountOwine t"I $43.00 $4300 $0.00 NOTICE It is the responsibility of the applicam/permidee, not Spokane County, to see to it that the use deserted on the front of this permit complies with applicable codes and requirements and that required inspections are requested, Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of Me construction at the applicant'a/permitlee's or property owners expense. At a minimum, the following inspections ARE REOUIREO by County Code: 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard satbacks are measured from properly lines, while setbacks for yams reaching streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-oi- way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb, The responsibility to comply with applicable setback provisions lies solely with the permineeMeither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your properry lines. Please verity their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner'slperminee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blacking is in place, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough -in, before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. 1Uj permits require final Inspection. NOTE: In addition to inspection of the structure, this inspection includes review of she improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road Improvements, parking, and landscaping are common requirements of a plummets plan which must be com- pleted prior to final approval of a building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES - Final inspection required when complete, stairs, numerate, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for -special inspections" in conduction with commercial projects. CALL 477-3675 FOR INSPECTIONS. TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE. YOUR INSPECTOR IS UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES: • Road cuts for utilities or driveways, Division of Engineering 8 Roads • Sewer connection, Division of Utilities 477-3600 4T/-3604 or State Department of Transportation or City Public Works Department 456-3000 625-6300 • On-site waste disposal system, Spokane Regional Health District • Electrical wiring, State Department of Labor and Industries 324-1560 324-2640 • Construction in a flood plain, Division of Engineering & Roads 477-3600 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an Inspection should be requested at least once every 180 days to assure the validity, of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitation Meese call us if you have any questions. All refund requests must be made in writing by the applicanUperminee (shown on the reverse) no later than 180 days after the date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after fee payment. MISTAKE? If you think we've made an error in processing this permit or in conducting inspirations pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Division of Building and Code Enforcement at the address found on the face of this permit. I certify that I am the owner or am authorized by the owner to make this application and that I have examined this permit/application, state that the information contained in it and submitted by me or my agent to compile said permit/application is true and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and agree to comply with same. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. I understand that the issuance of this permit/application and any subsequent inspection approvals or Certificates of Occupancy shall not be construed to give authority to violate or cancel the provisions of any state or local law regulating construction or agreement concerning this property, or as a warranty of conformance with the provisions of any state or local laws regulating construction. SIGNATURE OF APPLICANT/PERMITTEE !7 / APPLICATION OR AUTHORIZED AGENT _ DATE