Loading...
1999, 09-21 Permit: 99008818 SewerSPOKANE COUNTY DIVISION OF BUILDING AND PLANNING 1026W. BROADWAY • SPOKANE, WA 99260-0050 ` (509) 477-3675 INFORMATION PermitUse: SEWER CONNECT- OLDORCHARDSrFOIL''F, SHOWER Applicant: VISTA CONSTRUCTION i DRV Phone: (509)926-2243 Address: 2510 N PINES RD #207 SPOKANE. WA 99206 Contact VISTA CONSTRUC HON Phone: (509) 926-2243 2510 N PINES RD # SPOKANE, WA 992 Setbacks -Front: Left: Right: Rear: _ PERMIT(S) plumbinP PBrmll ContraUor: VISTA NW DEVELOPMENT Liras¢#: VTSTAND022M3 '1'OILETS/BIDETS 1 $600 SINKS 1 $6.00 SHOWERS 1 56.00 WATER PIPING -DWV 1 $600 PROCESSING FEE $25.00 Total Permit Fee: $49.00 Sener Permit Contractor: VISTA NW DEVELOPMENT' License 4: VISTAND022M3 SEWER CONNECEION 1 $55.00 PROCESSING FEE 515no Total Permit Fee: $1 G0.00 _PAYMENTSUMMARY age at 1VOTF5 , CAXUL Tran Date Receipt # Payment Amt I` 9/21/99 8110 $149.00 Total Fees AmountPaid AmoantOwine $14900 $149.00 $0.00 SPOKANE„ WA 99206 Parcel Number: 45213.9185 Subdivision: RANGE Zoning: AGRI Owner: STGMAN, ALAN Address: 11224 ESIHAVE SPOKANE, WA 99206 Inspector: DAN HOWARD Water Dint: PermitUse: SEWER CONNECT- OLDORCHARDSrFOIL''F, SHOWER Applicant: VISTA CONSTRUCTION i DRV Phone: (509)926-2243 Address: 2510 N PINES RD #207 SPOKANE. WA 99206 Contact VISTA CONSTRUC HON Phone: (509) 926-2243 2510 N PINES RD # SPOKANE, WA 992 Setbacks -Front: Left: Right: Rear: _ PERMIT(S) plumbinP PBrmll ContraUor: VISTA NW DEVELOPMENT Liras¢#: VTSTAND022M3 '1'OILETS/BIDETS 1 $600 SINKS 1 $6.00 SHOWERS 1 56.00 WATER PIPING -DWV 1 $600 PROCESSING FEE $25.00 Total Permit Fee: $49.00 Sener Permit Contractor: VISTA NW DEVELOPMENT' License 4: VISTAND022M3 SEWER CONNECEION 1 $55.00 PROCESSING FEE 515no Total Permit Fee: $1 G0.00 _PAYMENTSUMMARY age at 1VOTF5 , CAXUL Tran Date Receipt # Payment Amt I` 9/21/99 8110 $149.00 Total Fees AmountPaid AmoantOwine $14900 $149.00 $0.00 NOTICE It Is the responsibility of the permittee, not Spokane County, to see to It that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the owner'slpermittee's expense. At a minimum, the following inspections ARE REQUIRED by County Code' 1. FOOTING when forms and reinforcement are in place and prior to placement of concrete. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property Imes, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-obway, whichever provides the greater setback from the center line of the roadway right of way. Curb lines and fence lines are not necessarily indicative of properly lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved sheet/curm The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verity their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner s/permittee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. (Blocking for a manufactured home is required to be Inspected prior to the Installation of skirting.) 3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing. 4. INSOLATION - prior to the Installation of drywall. 5. PLUMBING - after rough in, before covering, and final. 6. MECHANICAL - rough in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. NOTE'. In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) requites by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Comficate of Occupancy. In addition to the above any plumbing or mechanical systems or materials which would be concealed by framing, drywall, concrete, etc., most be inspected prior to cover. Check with the department for "special inspections" In conjunction with commercial projects. CALL 477-3675 FOR INSPECTIONS. TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE. YOUR INSPECTOR IS UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES: • Road cuts for utilities or drives, Division of Endearing is Roads 477-3600 or State Department of Transportation 456-3000 • On-site waste disposal system, Spokane Regional Health District 324-1560 • Construction in a rood plain, Division of Engineering & Roads 4T/-3600 • Sewer connection, County Division of Ufilmes 4T -3604 or City Public Works Department 625-6300 • Electrical wiring, Stats Department of Labor and Industries 324-2640 EXPIRATION Unless otherwise noted, this permit will be considered null and void by limitation of the work authorized by the permit it not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions. MISTAKES? If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring It to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requnds should be directed to the Division of Building and Planning at the address found on the lace of this permit. I codify that I am Rte owner or am authorized by the owner to make this application and Nat I have examined this pennit/appl cation, state that the information contained in it and submitted by me or my agent to compile said permit/application is true and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand Ne INSPECTION REOU IREMENTS/NOTICE provisions included herein and agree to comply win same. All provisions of laws and ordinances governing Nis type of work will be complied with whether specified herein or not. I understand Nat Ne issuance of this permit/ application and any subsequent inspection approvals or Centfcates of Occupancy shall not be ronstruetl to give authority to violate or cancel the provisions of any state or local law regulating construction or agreement concerning this property, or as a warranty of conformance win the provisions of any state or local laws regulating canstructon. SIGNATURE OF APPLICATION OWNER OR AGENT DATE