Loading...
2010, 06-29 Permit App: 10001891 Covered Patio Project Number: 10001891 Inv: 1 Application Date: 6/29/2010 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: DETACHED COVERED CONCRET PATIO-20 X Contact: BRISTER,DEMPSEY E&TARI L 20 Address: 14108 E 3RD AVE C-S-Z: SPOKANE VALLEY,WA 99216 Setbacks:Front Left: Right: Rear: Phone: (509)939-7203 Group Name: Site Information: Project Name: Plat Key: Name: SHELLEY LAKE 04TH ADD PUD District: East Parcel Number: 45243.3301 Block: 5 Lot: 1 SiteAddress: 16212 E 9TH LN Owner:Name: BRISTER,DEMPSEY E&TAM L Address: 14108 E 3RD AVE Location::CSV SPOKANE VALLEY,WA 99216 Zoning: R-3 SF Res District Water District: 010 VERA Hold: Area: 8,292 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 32 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: . Review Building Plan Review Released By: Originally Released: 6/28/2010 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 6/29/2010 By: tschmidt Permits Operator: JD Printed By: jmm Print Date: 6/29/2010 Project Number: 10001891 Inv: 1 Application Date: 6/29/2010 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation COV DECK R-3 VB COVERED 400 $6,000.00 400 $6,000.00 PATIO Totals: 400 $6,000.00 400 $6,000.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $125.25 ACCESSORY PLANS REVIEW 1 SELECT $31.31 WSBCC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $161.06 Notes: Payment Summary: .. Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $161.06 $161.06 $31.31 $129.75 $161.06 $161.06 $31.31 $129.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 6/29/2010 remit(.,enter Scii 11703 E Sprague Ave,Suite B_3,_ _--\j PERMIT NUMBER: I b j' pokane Spokane Valley, Wim-}9206 PERMIT FEE: Valley. s.• :::_.. . 01§ 0037 s ww.s•o.. , .. .r.�::Bi` �,,, N f G1-', E$ Community Development C ,y' AGR ' t Residential Constfuction Nev Construction Accessory Bldg Permit Application. � J`-==- Addition/Remodel I Deck ;�1r __ Other: SITE ADDRESS: 140 V7 ;6, 4=1'61 L 1,1_ \I 6 rtA rTAL , 614„. szle ,1'1 ASSESSORS PARCEL NO: t4'3 z4,,. 1'/11 LEGAL DESCRIPTION:,N61,j,e-( L,o.tzg 44a /,„/0,. e„,V l 02t,t< Ij Building Owner: Contractor: Name:r/griAGY 4 4Arat .02&1+,4612. Name: Address':1 1 ,lam .054i.1 to Address: City: G r2 A r7�I. State:1,4n Zip s/,7 City: State: Zip: Phone:;;;n')- i'”"7-1? Fax: Phone: Fax: Contractor Lic No: Exp Date: Contact Person City Business Lic.No: Name: a4,.4 ( 1021-4 1,24g re Phone: VI n a) .. -1'2A� Describe the scope of work in detail: Cost f Project: $ '�i»� '' i tI'f n.Gt �/! eiA/0 rZ O 1.1/4j6' t�a'Lt . f' 1,__g '1Iig Zei.i iv'(t2d1-[ P.1.) dcter 4v re.i. l 626.16A.0, -feutvh A .av, Aazik. 6.fNt / , I1i,7►,1 mat.,4t,a._ Proposed Use: I-i-faivr",totAet..1'i _ _ **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: id -921' ,i 1'jZ' ?i2:h' x" 12.01.1 1,1//s, _ A� h. tO'f. MAIN FLOOR TO SQ. 2Nu FLOOR SQ. FTG: UNFIN BASEMENT'SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: N/A. tJti`. .. Lk4W 'g. r%i. FINISHED BASEMENT GARAGE SQ. FTG: DEC OV. f'ATI s. Q. FTG: 30%SLOPES ON SQ. FTG: N ja 14/A 04 'ac, A /1 h/,� , PROPERTY: L,enS #OF BEDROO S: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? 1.1/A t hl4 4'fif (Ui/6'Y2 • 4.1/A N1A The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before this application can be processed. SIGNATURE: 8 L'..ai ti,,,�'� `i DATE: .. Method of Payment: d 0 Cash. . 0 Check 0 Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signature: . . REVISED 2/15/07 I 1 I 7 I f _. ....."J t.- .14 5 i N s(a110 _ / EXIST. PROPERTY LINE 110' JUN �3 ( � / / / / ,S.!nrY1 t. s5 / / / / / / / CI/ 014' r. EXIST. 3—CAR GARAGE EXIST. DRIVEWAY k/ 11'-2 i" 3// 1 L 25' Qw/ // 0/ co/ 29' X20' 12' X14' / D COVERED CONCRETE PATIO E EXIST. CONCRETE / PROPOSED ADDITION ESQ L 1,./ / SQUARE FOOTAGE Q ^ IN v. d-/ r LOT — 8292 sq.ft. Z _/% EXIST. HOUSE v/ c r EXIST STRUCTURE — 2119 sq.ft. ./ EXIST. CONC. PATIO — 168 sq.ft ty 0/ 5' NEW STRUCTURE-400 sq.ft. ct-/ / / / I 30' PLANNING DEPT. AP, 1-i:s`•D.- 1 / i L U. G. UTILITIES (GAS, WATER, PHONE) , _BY*... ? ;=';/--- 1 PROPERTY NE 115.73 (EXIST. 6' CEDAR WOOD FENCE) DATE: D ROFADCE DRAW Pa DA REVISION OM , BY NPC Na DAA PMPM= Pr OR N1D DA:11117.14 NEM. DATE atti 0I G DRIk 0.E BRISTER 114110 DSO[ B.c tws� µ 0 BRISTER RESIDENCE ... 16212 E. 9TH LN SHELLEY LAKE (PARCEL#45243.3301) "" PLOT PLAN Nn sum .OR ORDER DRAMMC NORIFN ROT s1EET +/+'.1.-r 0 001 . - r _ - . NOOIIE: - O Bel For City Use_Qnl PLUS Project Number /�� Spokane Project Address AF . r f �. alle y 40000 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is (C ( ` The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should he contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process I. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07