2013, 10-23 Permit: SW-13001874 Sewer SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13001874 Permit Issued Date: 10/23/2013
Expiration Date: 10/23/2014
Project Description: SEWER CONNECTION
Project Name: WOODLAWN/BEVERLY HILLS
Primary Contact: C H D INC
Applicant: C H D INC
Address: 5025 N ARGONNE RD,SUITE 1
Phone: 509-994-3972 SPOKANE,WA 99212
Phone: 509-994-3972
Email: WES.CROSBY@COMCAST.NET
SITE INFORMATION:
Owner: EVERETT,ALYCIA
Site Address: 6114 E 10TH AVE Address: PO BOX 8760
Parcel Number: 35243.0830 SPOKANE,WA 99203
Phone:
Assessor's Description: BETTMANS ADD L9-10 B1 EXC: RD
Email:
Inspection Area: : (509)-477-3675
Water District: Spokane County Water Fire District: Spokane Valley Fire
District#3
Land Area: 13320 Square Feet
Zoning:
CONTRACTOR INFORMATION:
CHDIN**126LC, Exp.08/23/2014
C H D INC
5025 N ARGONNE RD,SUITE 1 SPOKANE,WA
99212
509-994-3972
WES.CROSBY@COMCAST.NET
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $26.32
Utilities Permit $125.00
Total Fee: $151.32
CONDITIONS:
Possible FEMA Flood Zone
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST
UIRES
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDINGTHOSE
THE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT
ALLOWS FORAA 30-MINUTE INSPECTION.ADDITIONAL 477-3604 FROM 8:30-5:00 PRIOR
NSPECTIONOCOVER.ONE FEES APPLY AFTER NOTICE REQUIRED.PERMIT
R 30 MINUTES.
Project Coordinator:Dawn Dompier
Date Printed:10/23/2013 10:09:00
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13001874 Permit Issued Date: 10/23/2013
Expiration Date: 10/23/2014
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:10/23/2013 10:09:00
Project Coordinator:Dawn Dompier