Loading...
sp-1147w.7b" Bor F rame A RIPRAP DETAIL PIPE INLET AND OUTLET -e CONSTRUCPON NOTES 1. All items of construction shall be completed within the "1991 Standard Specifications for Road, Bridge, and Municipal Construction as promulgated by the Washington State 8" FLAT TRANSITION Deportment of Transportation" and the "Spokane County Standards for Road and Sewer Construction 1992". and as amended. 2. Locations of existing utilities shown on these plans are approximate. The Contractor 2% N shall be responsible for locating all underground utilities. Any conflicting utilities shall be relocated prior to construction of road and drainage facilities. 777717151IF7 Provide fresh, clean new crop seed compl ing with tolerance for purity and germination IN 3. The Contractor is required to hove a complete set of the approved road and drainage established by Official Seed Analysts of North America. Provide seed mixture composed 2.0% MIN SLOPE plans on the job site whenever the construction is in progress. of gross species and percentages as follows'. 4. For construction of drywells, install filter fabric (Amoco 4545 or approved equivalent) 20 percent Elko Perennial Rye between the drywell barrel and the washed drainrock, and between the washed drainrock ' and the native soils. 20 percent Darer Hard Fescue 5. If the contractor discovers any discrepancies between the plans and existing conditions 45 percent Cover Sheep/Fescue encountered, the Contractor shall immediately notify the Design Engineer and the Spokane County rigineer's Office. 15 percent reubens Canadian Bluegrass 6. Prior to site construction, the Contractor is responsible for locating underground utilities. Provide mixture composed of gross seed and fertilizer in percentages as follows'. Call the underground utility location service at 456-8000 before you dig. CA Gross seed mixture: 90 lb.s per acre 7. Curb data is to back of curb dimension. Fertilizer: 16-16:16 timed release composition, 300 lbs. per acre 8. All signage must conform to Manual of Uniform Traffic Control Standards (M.U.T.C.D.). All seeding of slopes shall be done in accordance with WSDOT Standard Specifications 9. All existing areas damaged by construction equipment including excavations and ponsible embankments shall be hydroseeded per seeding specifications. Contractor shall be res Contractor shall irrigate seeded areas until seed has germinated and has been accepted by for any damage caused by soil erosion until final acceptance of improvements by Spokane Spokane County. County. CONSTRUCTION SPECIFICATIONS S E ..DING SPECIFICATIONS PORTLAND CEMENT CONCRETE lo A7 o son 8" FLAT TRANSITION i T 2% N 777717151IF7 2.0% MIN SLOPE ' �0 14 CA Nk p PORTLAND CEMENT CONCRETE lo A7 o