Loading...
2013, 07-22 Permit: SW-13001275 Sewer SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13001275 Permit Issued Date: 07/22/2013 Expiration Date: 07/22/2014 Project Description: SEWER CONNECTION Primary Contact: C H D INC Applicant: C H D INC Phone: 509-926-5229 Address: PO BOX 13717 SPOKANE,WA 99213 Phone: 509-926-5229 Email: SITE INFORMATION: Site Address: 6208 E 10TH AVE Owner: KOVASH, CALVIN Parcel Number: 35243.0848 Address: 6208 E 10TH AVE SPOKANE VALLEY,WA 99212 Phone: Assessor's Description: BETTMAN'S ADD LT 5& E15'OF LT 6 BLK 1 Email: Inspection Area: : (509)-477-3675 Water District: Spokane County Water Fire District: Spokane Valley Fire District#3 Zoning: Land Area: 8775 Square Feet CONTRACTOR INFORMATION: CHDIN**126LC, Exp.08/23/2014 C H D INC PO BOX 13717 SPOKANE,WA 99213 509-926-5229 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $26.32 Utilities Permit $125.00 Total Fee: $151.32 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR& INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. _ SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. _ INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Printed:07/22/2013 12:34:41 Project Coordinator:Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13001275 Permit Issued Date: 07/22/2013 Expiration Date: 07/22/2014 SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:07/22/2013 12:34:41 Project Coordinator:Kathy Cummings