2013, 01-14 Permit: SW-13000013 Sewer ♦ 1
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-13000013 01/14/2013
Expiration Date: 01/15/2013
Project Description: SEWER CONNECTION Primary Contact: H&S CONSTRUCTION
Project Name: WOODLAWN Applicant: H&S CONSTRUCTION
Permit Type: SEWER Address: 11817 E VALLEYWAY
SPOKANE VALLEY,WA 99206
Phone: 509-926-8964
Email:
SITE INFORMATION:
Site Address: 6719 E 10TH AVE Owner: MOONEY, ROBERT A
Parcel Number: 35244.0511 Address: 6719 E 10TH AVE
SPOKANE,WA 99212-0113
Subdivision: WOODLAWN PARK Phone:
Assessor's Description: WOODLAWN PK PT OF L15-16 B5 E45FT L15 EXC Email:
S5FT;W20 FT L16 EXC S5FT
Inspection Area:
Water District: East Fire District: Spokane Valley Fire
Spokane Water District
#1
Zoning: Land Area: 8775 Square Feet
CONTRACTOR INFORMATION:
General Contractor
HSCON**123KF
H&S CONSTRUCTION
11817 E VALLEYWAY
SPOKANE VALLEY,WA 99206
509-926-8964
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $26.32
Utilities Permit $125.00
Total Fee: $151.32
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed:01/14/2013 15:39:32 Printed by:IIS APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-13000013 01/14/2013
Expiration Date: 01/15/2013
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:01/14/2013 15:39:32 Printed by:IIS APPPOOL\SmartGovProdApp