Loading...
2013, 01-14 Permit: SW-13000013 Sewer ♦ 1 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-13000013 01/14/2013 Expiration Date: 01/15/2013 Project Description: SEWER CONNECTION Primary Contact: H&S CONSTRUCTION Project Name: WOODLAWN Applicant: H&S CONSTRUCTION Permit Type: SEWER Address: 11817 E VALLEYWAY SPOKANE VALLEY,WA 99206 Phone: 509-926-8964 Email: SITE INFORMATION: Site Address: 6719 E 10TH AVE Owner: MOONEY, ROBERT A Parcel Number: 35244.0511 Address: 6719 E 10TH AVE SPOKANE,WA 99212-0113 Subdivision: WOODLAWN PARK Phone: Assessor's Description: WOODLAWN PK PT OF L15-16 B5 E45FT L15 EXC Email: S5FT;W20 FT L16 EXC S5FT Inspection Area: Water District: East Fire District: Spokane Valley Fire Spokane Water District #1 Zoning: Land Area: 8775 Square Feet CONTRACTOR INFORMATION: General Contractor HSCON**123KF H&S CONSTRUCTION 11817 E VALLEYWAY SPOKANE VALLEY,WA 99206 509-926-8964 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $26.32 Utilities Permit $125.00 Total Fee: $151.32 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed:01/14/2013 15:39:32 Printed by:IIS APPPOOL\SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-13000013 01/14/2013 Expiration Date: 01/15/2013 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _ SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:01/14/2013 15:39:32 Printed by:IIS APPPOOL\SmartGovProdApp