Loading...
2002, 08-22 Permit: 02007251 Adult Family HomeSPOKANE COUNTY DIVISION OF BUILDING _ AND CODE ENFORCEMENT 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Group Name; Project Name: Permits Building Pum¢ Contractor. OWNLR Lieense a: OWNER Change of Use CHANGE OF USE/SAFCfY INS 550.00 STATE SURCHARGE $450 Dim: S Stades Total Permit Fee: 554.50 Sy Ft: Grp: Type: FOR FIT JI DING INSPECTIONS CALL (509) 477-3675. Payment Summary Total Fees AmountPaid Amounddsving Tran Date Recce Pavment Amt $54.50 $54.50 $000 822/02 6503 $5450 Notes / Conditions of Approval THERE ARE 2 NS I SLEEPING ROOMS Processed By: BURRIS, ROBIN PERMIT Printed By: WENDEL, GLORIA Page 1 of 1 Site Information Project Information Site Add rcas: 10403 E8111AVE Project Number: 02007251 1nv: 1 hsueDate: 8/22/02 SPOKANE, WA 99206 Permit Use: ADULT FAMILY HOME Parcel Number: 45201.1342 Subdivision: OPPORTUNITY(TR_I-142INC. 143-354) Applicant: ROBIN WORTIIY Block: Lot 10403E 8"111 AVE, timing: UR -3 Urban Residential 3.5 SPOKANE, WA 99206 Phone. (509)892-6420 Contact: ROBIN WORTHY Ow¢ec LANG, ROBERT 10403 E 8TH AVE Address: 10403 E8TH AVE SPOKANE, WA 99206 Phone: (509)892-6420 SPOKANE, WA 99206 Setbacks - Front LeD: Right. Rear: Building Inspector. DAN IlOWARll Water Dist: Group Name; Project Name: Permits Building Pum¢ Contractor. OWNLR Lieense a: OWNER Change of Use CHANGE OF USE/SAFCfY INS 550.00 STATE SURCHARGE $450 Dim: S Stades Total Permit Fee: 554.50 Sy Ft: Grp: Type: FOR FIT JI DING INSPECTIONS CALL (509) 477-3675. Payment Summary Total Fees AmountPaid Amounddsving Tran Date Recce Pavment Amt $54.50 $54.50 $000 822/02 6503 $5450 Notes / Conditions of Approval THERE ARE 2 NS I SLEEPING ROOMS Processed By: BURRIS, ROBIN PERMIT Printed By: WENDEL, GLORIA Page 1 of 1 I�OTICE It is the responsibility of the applicant/cournitter, not Spokane County to see to it that the us. described On the input Of this permit complies with applicable codes and requirements and that required inspections are requested Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain Parts of the construction at the applicant a/permittee s or properly owner S expense At a minimum the fOlowing inspections ARE REQUIRED by County Cede 1 FOOTING - when forms and reinforcement are in place and prior to placement of concrete—ail structures including manufactured homes NOTE: This inspection includes review of the Structures settacks from property lines Minimum Setbacks are established by County s.n,Og regulations, Typically side and rear yard setbacks are measured from property lines while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-opway whichever provides the greater setback from the center line of the roadway right of way Curb lines and fence [ines are not necessarily indicative of property lines In some residential areas the County can own as much as 20 feet of right of -way between your property and the actual improved streelJoure The responsibility to comply with applicable setback provisions lies solely with the perreffee—heither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines Please verity their location prior to locating your structure Failure to properly locate the structure may require its relecittion at the ownereftsermiftes, S expense 2 FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete 3 FRAMING - after all framing, bracing and blocking is in place and prior to concealing. 4 INSULATION - prior to the installation of dr,wall. 5, PLUMBING after rough -in before covering, and final 6 MECHANICAL - rough -in of piping, before covering metal chimneys before concealment, and line 7 FINAL - when complete and prior to occupancy and/or us. PI.... provide 24 hour. notice AU permit. require final Inspection. NOTE: In addEtion to inspection of the structure, this inspection Includes review of site Improvements (typically depicted So the approved Site plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access, mealt. drainage ("208 swales"), road Improvement., parking, and landscaping are common requirements of a permeate plan which must be com- plated prior to final approval of a building or issuance of a Certificate of Occupancy, 8, MANUFACTURED HOMES Final inspection required when complete, Stairs handrails, adding, etc installed and prior to occupancy completed inspection record card must be available on site, 9 SEWERS - prior to cover 10 RIG H T -O F-WAY/APPROACH - prior to placement of concrete or if gravel approach after completion. In addition to the above, any plumbing or machasidel systems or material which would be concealed by framing dryastrecirce.i murifte.mep.,thm! prior to cover. Check with the department for 'Special mmrypftons� in conjunction with commercial projects FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire Inspections, Division Road cuts for utilities or driveways Division of Engineenng & of Building and Code Enforcement Read. - 48-HOUR NOTICE REQUIRED 477-3675 477-3600 or State Department of Transportation • ConstrucNion in a flood plain Division of Engineering & Roads 456-3000 477-3600 . Sewer connection, Division of Utilities • Electrical wiring, State Department of Labor and Industries 477-3604 324-2640 or City Public Works Department 625-6300 • On-site waste disposal system Spokane Regional Health District 324-1560 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted this peornit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration At a minimum an inspection should be requested at least once fai 180 days to assure the validity of the permit A permit may be renewed within one year of the date of expiration for one-half the original fee subject to certain limitations—pleass call us if you have any questions All refund requests must be made in writing by the applicarmbereftee, (shown an the reverse) no later than 130 days after the dot. .11. Payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit No adfunds may be authomaer! more than 180 days after fee payment. MISTAKE? If you think we so made an error in processing this permit or in conducting inspections pertaining to it or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery All such requests should be directed to the Division of Building and Code Enforcement at the below address Spokane County Division of Building & Coure Enforcement 1026 best Broade ay Avenue Spokane,114A 992rO Phone: (509) 477-3675 Fftx: (509) 477 4703 7DD: (509) 477-7133