Loading...
2008, 07-30 Permit App: 08001874 Additional Offices Project Number: 08001874 h lApplication Date: 7/30/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: TI-ADD OFFICES TO EXISTING MEZZANINE Contact: ABC GROUP,L.L.C. Address: 16124 E EUCLID AVE C-S-Z: SPOKANE VALLEY,WA 99216 Setbacks:Front Left: Right: Rear: Phone: (509)624-8921 Group Name: Site Information: Project Name: Plat Key: 005608 Name: BSP-0022-88 District: East Parcel Number: 45122.9176 Block: Lot: SiteAddress: 16124 E EUCLID AVE Owner:Name: ABC GROUP,L.L.C. Address: 16124 E EUCLID AVE Location::CSV SPOKANE VALLEY,WA 99216 Zoning: I-2 Light Industrial Water District: Hold: ❑ Area: 109,766 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 60 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review In ormatlon: _ rr m i a m aac_.8� ma x • ,� Review Bldg Plan Review Released By: Originally Released: 7/29/2008 By: NBENTLE Fire District Review Released By: -, Originally Released: 5/28/2008 By: THARVEY Operator: MT Printed By: jmm Print Date: 7/30/2008 Project Number: 08001874 IllApplication Date: 7/30/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: BROWN CONTRACTING&DEV Firm: BROWN CONTRACTING&DEV C Address: 2205 N WOODRUFF STE 1 Phone: (509)444-4400 SPOKANE WA 99206 Building Characteristics Group: B Type: III-B Total Area 1458 Fire Sprinlder -1 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation BUSINESS B III-B TI- 0 $93,000.00 0 $93,000.00 ADDING OFFICES Totals: 0 $93,000.00 0 $93,000.00 Item Description Units Unit Desc Fee Amount COMMERCIAL PERMIT FEE 1 SELECT $944.75 COMMERCIAL PLANS REVIEW 1 SELECT $614.09 WSBC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $1,563.34 Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $1,563.34 $1,563.34 $200.00 $1,363.34 $1,563.34 $1,563.34 $200.00 $1,363.34 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: MT Printed By: jmm Print Date: 7/30/2008 Project Number: 08001874 111 1 Application 5/22/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: TI-ADD OFFICES TO EXISTING MEZZANINE Contact: ABC GROUP,L.L.C. Address: 16124 E EUCLID AVE C-S-Z: SPOKANE VALLEY,WA 99216 Setbacks:Front Left: Right: Rear: Phone: (509)624-8921 Group Name: Site Information Project Name: Plat Key: 005608 Name: BSP-0022-88 District: East Parcel Number: 45122.9176 Block: Lot: SiteAddress: 16124 E EUCLID AVE Owner:Name: ABC GROUP,L.L.C. Address: 16124 E EUCLID AVE Location::CSV SPOKANE VALLEY,WA 99216 Zoning: I-2 Light Industrial Water District: Hold: Area: 109,766 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 60 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: :_ ..., r<, �,. - Review 1 , . 7% Bldg Plan Review Released By: / Fire District Review Released By: 1 Permits: x,,.,. Operator: MT Printed By: jmm Print Date: 5/22/2008 Permit C , SCITY 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER: � � IS N pokane Spokane Valley,WA 99206 ��dlleyPERMIT FEE: (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org Community Development (Non-residential) Commercial Construction New Construction ✓ Tenant Improvement Permit Application ['Other: SITE ADDRESS: 16124 E.Euclid Avenue 44511Z 11 10 ASSESSORS PARCEL NO: 4032 . LEGAL DESCRIPTION: 16124 E.Euclid Avenue Building Owner Contractor Name:F.O.Berg Company Name: Brown Contracting Address: 16124 E.Euclid Avenue Address: 2205 N.Woodruff Rd. Suite#1 City: Spokane Valley State: WA Zip: 99216 City: Spokane Valley State: WA Zip: 99206 Phone: 509.624.8921 Fax: Phone: 509.444.4400 Fax: 509.444.4425 Occupant of Structure Contractor Lic No: Exp Date: Name:F.O.Berg Company BROWNCD000BM 4/25/09 Phone: 509.624.8921 City Business Lic.No: 601999915 Contact Person Architect Name: Andy Barrett Company Name:Nystrom Olson Phone: 509.624.8921 Collins,Inc. Architect Name:K. Sam Nystrom Cost of Project: $ 93,000 Address: 912 W. Sprague Describe the scope of work in detail: City: Spokane State:WA Zip: 99201 Phone: 509.328.6464 Fax: 509.328.6465 This is a small tenant improvement which includes the addition of a few interior non structural walls and the relocation of some plumbing and light fixtures. Four new windows will be added in the existing exterior facade. Type of Construction: III-B No. of Stories: 1 Total Building Sq Ft: 33,957 Heat Source: Existing Fire Sprinklers: Existing Primary Occupancy: Office Sq Ft: 1,515 Secondary Occupancy: Sq Ft: The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Pe it Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws,codes . . dinances. 6) Plans or additional information may be required to be submitted,and subsequently approved before this application ca It processed. Signature I L • Date 5/t O f f)t) Method of Payment: ❑ Cash ✓ Check 0 Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signature: Effective October 28,2007 X:\NOC Projects\2007\07.59 Berg Company\Commercial Building Permit App.doc • Project History PROJECT NUMBER 08001874 PERMIT USE TI -ADD OFFICES TO EXISTING MEZZANINE SITE ADDRESS 16124 E EUCLID AVE Date Review comments 5/19/2008 Event RECD AND ROUTED(2)CONSTRUCTION PLANS TO BLDG N/A AND(1)TO FIRE-MT 1 , /72 Thursday,May 22,2008 Page 1 of l o01QOKp,NE VA<<F jig( E>, ,r FIRE s` DEPARTMENT 10319 EAST SPRAGUE AVE. •SPOKANE VALLEY,WA 99206-3627•(509)928-1700•FAX(509)892-4127 www.spokanevalleyfire.com PREVENTION DIVISION July 31, 2008 Permit#: 08001874 Project Address: 16124 E. Euclid Avenue Project Description: Tenant Improvement—add offices to existing mezzanine Applicant: ABC Group LLC 16124 E. Euclid Avenue Spokane Valley,WA 99216 624-8921 RE: Revised Permit Review Comments The Spokane Valley Fire Department has completed a review of the revised plan submittal for the above referenced project. The revisions do not affect prior Fire Department acceptance of the issuance of the permit. If there are any questions please do not hesitate to call. Sincerely, Traci Harvey Fire Protection Engineer Spokane Valley Fire Department Cc Jodi Main City of Spokane Valley Jenna Davis City of Spokane Valley C:\Documents and Settings\jmain\Local Settings\Temporary Internet Files\OLK1E\Euclid E 16124 Permit Revisions.doc Plan Review Evaluation Information Date: 7/29/08 Permit No# 08001874 Name of Site: Mezzanine Floor for F.O. Berg Address: 16124 E. Euclid Ave. Use of Building: B/F-1 Type of Construction: IIIB Fire Suppression System: Yes Floor Area 1st Floor: N/A 2°d Floor: 1,458 sq. ft. Occupant Load 1st Floor: N/A 2°d Floor: (B) Offices 10.80, (5) Mech. Rm. 1.26, Total: 12.06 Roof Height Eave: Peak: N/A NREC: Yes, T.A.S. HB 1848 All Weather Protection: N/A Other Conditions: Plan Reviewer: Nik Bentley prom Dison collins architecture planning innovation i17 n.s. :prac7uc a s po ka n e.Inds h ingto n3 ii I):50,0 R E4ri4f:SW-)3286if June 17, 2008 City of Spokane Valley Attn: Nik Bentley, CBO Senior Plans Examiner 11705 E. Sprague Ave. Spokane Valley, WA 99206 Re: 16124 E. Euclid Ave. Berg Company Remodel City of Spokane Valley, WA Nik, Thanks again for taking the time to meet with me to review your plan review comments for this project dated June 9, 2008. In response to our discussion: 1. Please find attached revised sheets A2.01 and A2.02 correcting the upper level name from "Mezzanine" to "Second Floor". 2. Occupancy sensors will be added to the light switches in the offices and conference room on the second floor. 3. This letter is also to confirm that spaces serving equal function to those listed on the second floor are provided and are ADA accessible within the existing main floor office space. Please call if you have any questions or need any additional information. - t•ti K. Sam Nystrom, AIA Principal, NOC inc. 0000"sem, Spokane galley 11705 E Sprague Ave Suite B3 •Spokane Valley WA 99206 509.688.0035 ♦ Fax: 509.688.0037♦ cityhall®spokanevalley.org Nystrom/Olson/Collins Architectural 912 W. Sprague Ave. Spokane, WA 99201 Re: 16124 E. Euclid Ave. Mezzanine Floor Remodel Date: June 9, 2008 Dear Nystrom/Olson/Collins Architectural, In conducting a preliminary review of your submitted plans, I respectfully request a clarification on the items listed below. 1) Please provide details of the required second egress component from the mezzanine floor area. With ten(10)percent of the mezzanine floor enclosed and the occupant load for the mezzanine floor over ten(10), a second exit leading directly to a rated exit or to the exterior will be required as per IBC, section 505.4 (1), (2), (3),and(5). 2) For verification of accessibility,please provide information describing the same use on the mezzanine floor to the use on the main floor. An example would be if you have a conference room on the mezzanine floor and a conference room on the main floor,the accessibility requirements have been met.No ADA access would be required to be provided to the mezzanine floor as per IBC, section 505.3 and 1007. I have finished the plan review of the submitted plans accept for the items listed above. Details on these points would expedite the plan review process to gain issuance of the expected permit. If there are any questions or information that I could help you with,please do not hesitate to call me at(509)688-0051. I look foreword to assisting you through this process. Sincerely, Nik Bentley, CBO Senior Plans Examiner A or City Use Only =: "" PLUS Project Number r CITY OF pok .ne Address Project 441•00 alleVy- 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is t I la The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07 PERMIT CENTER CTTY of Spokane y Project Transmittal .Valley® 11703 E Sprague Ave. Suite B-3 Spokane Valley WA 99206 Phone: 509.688.0036 Fax: 509.688.0037 New Application/Pre-Application ❑ Provide one of the following (REQUIRED FOR ACCEPTANCE): Response to Review Comments PLUS Project#:• �� r/ c�" # L! Revisions to Application ❑ Parcel Number: Other (Describe Below): ❑ Site Address: 1 (C, 12 q t_ L , t d vQ,'(1,Ut Route to (Please check all that apply): Division #of Sheets/Type of Document/#of Copies Received by: Building VERIFIED/INITIALS 3 , ) t . „\ 1 C' k,. ek )410,-' / ► w .0-z, / '' QC Check by: j ❑ Development Engineering / / VERIFIED/INITIALS / / ° / / o IQC Check by: VERIFIED/INITIALS ❑ Planning / / o / / / / o / / ° QC Check by: ❑ SV Fire Department / / VERIFIED/INITIALS o / I / / / / o QC Check by: Project Contact Information: I Name: l,IL,1 0n C li,t � Phone: �l�,J9 -32t/`(0 014 04 Email: jGYI u,,1k-2 hGCctr=1'd-t - CGV.\-\ Fax: C)O9 - 3L -b W 5 Relationship to Project: ,. Architect ❑ Engineer ❑ Other Design Professional 0 Contractor 0 Owner/Applicant DATE STAMP: z 1,- t` -.,, nystrorti. collins architecture planning innovation 12 ,,,rest sprague a/0T spokarie H:ligion 99201 r, :=00.9 328 322, Transmittal Sheet To: City of Spokane Valley, Permit Date: 06.17.08 Attn: Nik Bentley, CBO Project No: 07.59 F.O. Berg CC: We For Transmit: Z drawings Evia E-mail Your: El approval El specifications El use Z letter Z review&comment El 111 information Quantity Drawing No. Description Revision Date 3 Design Clarification Letter 1 2 Wet Stamped Drawings A2.01 + A2.02 2 2 Drawings A2.01 + A2.02 Remarks: Submitted By: Carson Schultz • . PERMIT CENTER SCITY OF pokane . Project Transmittal 4• VA.11ey* 11703 E Sprague Ave. Suite B-3 Spokane Valley WA 99206 Phone: 509.688.0036 Fax: 509.688.0037 New Application/Pre-Application ❑ Provide one of the following (REQUIRED FOR ACCEPTANCE): Response to Review Comments ❑ PLUS Project#: da0oJg77' Revisions to Application ❑ Parcel Number: t v6L,o Other (Describe Below): ❑ Site Address: Route to (Please check all that apply): Division #of Sheets/Type of Document/#of Copies Received by: VERIFIED/IN I C9� Building / PCc� Jr S s7 / / / / / / / ° QC Check by: ❑ Development Engineering VERIFIED/INITIALS ° QC Check by: VERIFIED/INITIALS O Planning / / o / / o QC Check by: O SV Fire Department / / VERIFIED/INITIALS / / 0 a _.. QC Check by: Project Contact Information: Name: mss- Phone: Email: Fax: Relationship to Project: O Architect 0 Engineer 0 Other Design Professional 0 Contractor 0 Owner/Applicant DATE STAMP: nystrovil ((t-((gi coffins architecture planning innovation 9, v,,E,,,,3tri si-,oka ;e 992C,I Transmittal Sheet To: City of Spokane Valley Date: 07.23.08 Attn: Nick Bentley Project No: 07.59 FO BERG CC: We For Transmit: drawings Evia E-mail Your: approval LI specifications use fl letter review&comment 0 LI information Quantity Drawing No. Description Revision Date 3 Permit Set 07.17.08 Remarks: Submitted By: Sam Nystrom Fad°r QOMNE vAt sf• 9 u FIRE ofor DEPARTMENT 10319 EAST SPRAGUE AVE. •SPOKANE VALLEY,WA 99206-3627•(509)928-1700•FAX(509)892-4127 www.spokanevalleyfire.com PREVENTION DIVISION May 28, 2008 Permit#: 08001874 Project Address: 16124 E. Euclid Avenue Project Description: Tenant Improvement—add offices to existing mezzanine Applicant: ABC Group LLC 16124 E. Euclid Avenue Spokane Valley,WA 99216 624-8921 RE: Permit Acceptance The Spokane Valley Fire Department approves the issuance of the permit for the tenant improvement for 16124 E. Euclid Avenue (F.O. Berg Co.)with the following conditions: 1. Revisions to the fire suppression system require a separate permit. 2. Revisions to the fire alarm system require a separate permit. 3. Provide fire extinguishers per IFC section 906. If there are any questions please do not hesitate to call. Sincerely, Traci Harvey Fire Protection Engineer Spokane Valley Fire Department Cc Jodi Main City of Spokane Valley Jenna Davis City of Spokane Valley C:\Documents and Settings\jmain\Local Settings\Temporary Internet Files\OLK11\Euclid E 16124 Permit Acceptance.doc rject• � Project Prezious pre-app meetingEl Spokane . Transmittal Plan rethions .0•OValleyCity of Spokane Valley Transmittal Date: Community Development Friday,July 25,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 16124 E EUCLID AVE Project Number: 08001874 Parcel Number: 45122.9176 Zoning: 1-2 Water District: Fire District: Applicant: ABC GROUP, L.L.C. Owner: ABC GROUP, L.L.C. 16124 E EUCLID AVE 16124 E EUCLID AVE SPOKANE VALLEY, WA 99216 SPOKANE VALLEY, WA 99216 (509) 624-8921 e-mail: e-mail: Contact: ABC GROUP, L.L.C. Occupant: 16124 E EUCLID AVE e-mail: SPOKANE VALLEY, WA 99216 (509) 624-8921 e-mail: Contractor: BROWN CONTRACTING & DEV CO Arch/Engineer: 2205 N WOODRUFF STE 1 SPOKANE WA 99206 (509) 444-4400 e-mail: NYSTROM OLSON COLLINS Project TI -ADD OFFICES TO EXISTING MEZZANINE Description: Building Landuse Engineer Utilities Health Fire Dist Assessor REVISED PERMIT SET Please send all plan review and project comments via e-mail to the highlighted individuals. t- � � PERMIT CENTER Spokane Project Transmittal jValley* 11703 E Sprague Ave. Suite B-3 Spokane Valley WA 99206 Phone: 509.688.0036 Fax: 509.688.0037 New Application/Pre-Application ❑ Provide one of the following (REQUIRED FOR ACCEPTANCE): Response to Review Comments ❑ PLUS Project#: 000/g 7Y Revisions to Application ❑ Parcel Number: /6 /2 Y b U6 Li p Other (Describe Below): ❑ Site Address: Route to (Please check all that apply): Division #of Sheets/Type of Document/#of Copies Received by �; VERIFIED/IN g Building - / f�f m I T .c ET I / I ° / / o" / / QC Check by.!.--1,'i'-'24.,' / VERIFIED/INITIALS ❑ Development Engineering / / / / / ° / / El QC Check by ❑ Planning / / VERIFIED/INITIALS'" / / Q4 / / 0 / / 0 QC Check by::,,,A,,\-- , M VERIFIED/twTiAL ❑ SV Fire Departments °__ . ., / / 0 / / / / QC Check by:,_ L , ..., Project Contact Information: Name: �--� Phone: Email: Fax: Relationship to Project: ❑ Architect 0 Engineer 0 Other Design Professional 0 Contractor 0 Owner/Applicant DATE STAMP: CITY CI;= jr („EA. ,F l'ALL(^'t 1 $Y: •l - Newproject 4 Project Previous pre-app meeting CITY OF +�SpolkanePlan revisions Transmittal 4000 ValleY City of Spokane Valley Transmittal Date: Commuiuty Development Thursday,June 19,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone: 509.688.0036 Site Address: 16124 E EUCLID AVE Project Number: 08001874 Parcel Number: 45122.9176 Zoning: 1-2 Water District: Fire District: Applicant: ABC GROUP, L.L.C. Owner: ABC GROUP, L.L.C. 16124 E EUCLID AVE 16124 E EUCLID AVE SPOKANE VALLEY, WA 99216 SPOKANE VALLEY, WA 99216 (509) 624-8921 e-mail: e-mail: Contact: ABC GROUP, L.L.C. Occupant: 16124 E EUCLID AVE e-mail: SPOKANE VALLEY, WA 99216 (509) 624-8921 e-mail: Contractor: BROWN CONTRACTING & DEV CO Arch/Engineer: 2205 N WOODRUFF STE 1 SPOKANE WA 99206 (509) 444-4400 e-mail: NYSTROM OLSON COLLINS Project TI -ADD OFFICES TO EXISTING MEZZANINE Description: Building Landuse Engineer Utilities Health Fire Dist Assessor A2.01 i A2.02 Please send all plan review and project comments via e-mail to the highlighted individuals. New project 0 Project Previous pre-app meeting f ‘ 1 ° Kang Tran s rn�ttal Plan revision City of Spokane Valley Transmittal Date: Community Development Wednesday,June 18,2008 .000014/Talley Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone: 509.688.0036 Site Address: 16124 E EUCLID AVE Project Number: 08001874 Parcel Number: 45122.9176 Zoning: 1-2 Water District: Fire District: Applicant: ABC GROUP, L.L.C. Owner: ABC GROUP, L.L.C. 16124 E EUCLID AVE 16124 E EUCLID AVE SPOKANE VALLEY, WA 99216 SPOKANE VALLEY, WA 99216 (509) 624-8921 e-mail: e-mail: Contact: ABC GROUP, L.L.C. Occupant: 16124 E EUCLID AVE e-mail: 41 }/I'l,iti SPOKANE VALLEY, WA 99216 (509) 624-8921 e-mail: V Contractor: BROWN CONTRACTING & DEV CO Arch/Engineer: It41A 2205 N WOODRUFF STE 1A.,0 SPOKANE WA 99206 \'-(509) 444-4400 e-mail: Ti Project T1 -ADD OFFICES TO EXISTING MEZZANINE a C1 Description: Building Landuse Engineer Utilities Health Fire Dist Assessor DESIGN •2. CLARIFICATION J WET STAMPED j DRAWINGS ) DRAWINGS Please send all plan review and project comments via e-mail to the highlighted individuals. PERMIT CENTER CITY OF pokane Project Transmittal 4.Valley. 11703 E Sprague Ave. Suite B-3 Spokane Valley WA 99206 Phone: 509.688.0036 Fax: 509.688.0037 New Application/Pre-Application ❑ Provide one of the following (REQUIRED FOR ACCEPTANCE): Response to Review Comments PLUS Project#: j —/ p'? . Revisions to Application o Parcel Number: q Other (Describe Below): ❑ Site Address: I Vi I Z „r_ . f=t,l.�; t c IV ve,rk t l.e Route to (Please check all that apply): Division #of Sheets/Type of Document/#of Copies Received by: Building , ) ,-, , r-_c_i^ c# .1 A die.i___ 14„., ,,,, 3 r 1 / ► _ t Iffain, 11 V d 0 - P02 2, / ) i2-i0 11 .oz I / / QC Check by . ❑ Development Engineering / / VERIFIED/INITIALS / / / / / / QC Check by: . ': ❑ Planning / / v�>EIEi�fiNlriA7_s / / o / / c� / / QC Check by:..,. . k:. ❑ SV Fire Department / / vERRIFIED/iNI7iALs / / 40 o QC.Check by:. Project Contact Information: n �i I�!� Name: l,Q,rSon SC\,\ J.,,T LZ Phone: 51�1 -320-UJ_I to 4 Email: jG\(1t„1,1k--- r1 OCC-YC- .. COMM Fax: c509 - 32- -lot-i(19 5 Relationship to Project: C/ . Architect 0 Engineer 0 Other Design Professional 0 Contr ,cf& ;,n:O per//Applicant DATE STAMP: fu/Lf _ v/1/-4 Nystrom dson coffins architecture planning innovation cpok ana.>ash lnq ion 99201 p 509.328.6?6d I 502325 6455 June 17, 2008 City of Spokane Valley Attn: Nik Bentley, CBO Senior Plans Examiner 11705 E. Sprague Ave. Spokane Valley, WA 99206 Re: 16124 E. Euclid Ave. Berg Company Remodel City of Spokane Valley, WA Nik, Thanks again for taking the time to meet with me to review your plan review comments for this project dated June 9, 2008. In response to our discussion: 1. Please find attached revised sheets A2.01 and A2.02 correcting the upper level name from "Mezzanine" to "Second Floor". 2. Occupancy sensors will be added to the light switches in the offices and conference room on the second floor. 3. This letter is also to confirm that spaces serving equal function to those listed on the second floor are provided and are ADA accessible within the existing main floor office space. Please call if you have any questions or need any additional information. K. Sam Nystrom, AIA Principal, NOC inc. New project • Project Previous pre-app meeting ° poilirkane Transmittal Plan revisions ° City of Spokane Valley Transmittal Date: .0014/alley Community Development Tuesday,May 20,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone: 509.688.0036 Site Address: 16124 E EUCLID AVE Project Number: 08001874 Parcel Number: 45122.9176 Zoning: 1-2 Water District: Fire District: Applicant: ABC GROUP, L.L.C. Owner: ABC GROUP. L.L.C. 16124 E EUCLID AVE 16124 E EUCLID AVE SPOKANE VALLEY. WA 99216 SPOKANE VALLEY. WA 99216 (509) 624-8921 e-mail: e-mail: Contact: ABC GROUP. L.L.C. Occupant: 16124 E EUCLID AVE e-mail: SPOKANE VALLEY. WA 99216 (509) 624-8921 e-mail: Contractor: UNKNOWN Arch/Engineer: UNKNOWN UNKNOWN. WA UNKNOWN ( ) - 0 e-mail: Project TI -ADD OFFICES TO EXISTING MEZZANINE Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION t ' PLANS 41 le f NRECS ---- Please send all plan review and project comments via e-mail to the highlighted individuals. PERMIT CENTER CITY of o• kane Project Transmittal .oVal1eyA 11703 E Sprague Ave. Suite B-3 Spokane Valley WA 99206 Phone: 509.688.0036 Fax: 509.688.0037 New Application/Pre-Application Ef Provide one of the following (REQUIRED FOR ACCEPTANCE): Response to Review Comments ❑ PLUS Project#: Revisions to Application ❑ Parcel Number: x`03 Z Other (Describe Below): ❑ Site Address: /b /Z7 E• t✓cL,a 5pok4NE(4tccr,i,/,¢ Route to (Please check all that apply): Division #of Sheets/Type of Document/#of Copies Received by: VERIFIED/INITIALS Building iy / AR N, D' _,y / glen- / / / ° / / ❑ QC Cheek by: ❑ Development Engineering / / VERriALs oIFiEo/INr / / / / 0 / / C3 cl QC Check by: VERIFIED/INITIALS ❑ Planning / / j o / / / / a / / QC Check by: ly / SV Fire Department /¢�N, "dec.t tie,71: leu-cE • •/ ! VERIFIEDtINITIAi I / / / o / / o QC Check by: Project Contact Information: Name: egq iz.' 5,4fr/ //rhea/, Phone: 3V7•3Z8.6 y(,l y1S-REmail: A/yrirdrvi c 1 D G otrci. GDM Fax: 3Z8. 4,/.1S- Relationship elationship to Project: CiArchitect 0 Engineer 0 Other Design Professional ❑ Contractor 0 Owner/Applicant DATE STAMP: fl3T2CollinsOffl architecture planning innovation 12 west sir tar avenue spokane, wasnington 99'201 1.8 509 328.6464 r. :-9.3)9:3'28 6465 Transmittal Sheet To: City of Spokane Valley Date: 05.16.08 Attn: Permit Center Project No: 07.59 F.O. Berg CC: We For Transmit: CE drawings Livia E-mail Your: El approval fl specifications use El letter LI review&comment CENRECs information Quantity Drawing No. Description Revision Date 3 14 Wet Stamped Drawing Set 1 NREC Compliance Report 1 Payment Check 1 Permit Application Remarks: All NREC requirements listed by Technical Assistant Services have been addressed and are being implemented via Brown Contracting. Submitted By: Carson Schultz