2008, 07-30 Permit App: 08001874 Additional Offices Project Number: 08001874 h lApplication Date: 7/30/2008 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: TI-ADD OFFICES TO EXISTING MEZZANINE Contact: ABC GROUP,L.L.C.
Address: 16124 E EUCLID AVE
C-S-Z: SPOKANE VALLEY,WA 99216
Setbacks:Front Left: Right: Rear: Phone: (509)624-8921
Group Name:
Site Information: Project Name:
Plat Key: 005608 Name: BSP-0022-88 District: East
Parcel Number: 45122.9176 Block: Lot:
SiteAddress: 16124 E EUCLID AVE Owner:Name: ABC GROUP,L.L.C.
Address: 16124 E EUCLID AVE
Location::CSV SPOKANE VALLEY,WA 99216
Zoning: I-2 Light Industrial
Water District: Hold: ❑
Area: 109,766 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 60
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review In ormatlon: _ rr m i a m aac_.8� ma x • ,�
Review
Bldg Plan Review Released By:
Originally Released: 7/29/2008 By: NBENTLE
Fire District Review Released By: -,
Originally Released: 5/28/2008 By: THARVEY
Operator: MT Printed By: jmm Print Date: 7/30/2008
Project Number: 08001874 IllApplication Date: 7/30/2008 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: BROWN CONTRACTING&DEV Firm: BROWN CONTRACTING&DEV C
Address: 2205 N WOODRUFF STE 1 Phone: (509)444-4400
SPOKANE WA 99206
Building Characteristics
Group: B Type: III-B
Total Area 1458
Fire Sprinlder -1
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
BUSINESS B III-B TI- 0 $93,000.00 0 $93,000.00
ADDING
OFFICES
Totals: 0 $93,000.00 0 $93,000.00
Item Description Units Unit Desc Fee Amount
COMMERCIAL PERMIT FEE 1 SELECT $944.75
COMMERCIAL PLANS REVIEW 1 SELECT $614.09
WSBC SURCHARGE 1 SELECT $4.50
Permit Total Fees: $1,563.34
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $1,563.34 $1,563.34 $200.00 $1,363.34
$1,563.34 $1,563.34 $200.00 $1,363.34
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: MT Printed By: jmm Print Date: 7/30/2008
Project Number: 08001874 111 1 Application 5/22/2008 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: TI-ADD OFFICES TO EXISTING MEZZANINE Contact: ABC GROUP,L.L.C.
Address: 16124 E EUCLID AVE
C-S-Z: SPOKANE VALLEY,WA 99216
Setbacks:Front Left: Right: Rear: Phone: (509)624-8921
Group Name:
Site Information Project Name:
Plat Key: 005608 Name: BSP-0022-88 District: East
Parcel Number: 45122.9176 Block: Lot:
SiteAddress: 16124 E EUCLID AVE Owner:Name: ABC GROUP,L.L.C.
Address: 16124 E EUCLID AVE
Location::CSV SPOKANE VALLEY,WA 99216
Zoning: I-2 Light Industrial
Water District: Hold:
Area: 109,766 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 60
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information: :_ ..., r<, �,. -
Review 1
, . 7%
Bldg Plan Review Released By:
/
Fire District Review Released By: 1
Permits: x,,.,.
Operator: MT Printed By: jmm Print Date: 5/22/2008
Permit C ,
SCITY 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER: � � IS N
pokane Spokane Valley,WA 99206
��dlleyPERMIT FEE:
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
Community Development
(Non-residential)
Commercial Construction New Construction ✓ Tenant Improvement
Permit Application ['Other:
SITE ADDRESS: 16124 E.Euclid Avenue
44511Z 11 10
ASSESSORS PARCEL NO: 4032 . LEGAL DESCRIPTION: 16124 E.Euclid Avenue
Building Owner Contractor
Name:F.O.Berg Company Name: Brown Contracting
Address: 16124 E.Euclid Avenue Address: 2205 N.Woodruff Rd. Suite#1
City: Spokane Valley State: WA Zip: 99216 City: Spokane Valley State: WA Zip:
99206
Phone: 509.624.8921 Fax: Phone: 509.444.4400 Fax:
509.444.4425
Occupant of Structure Contractor Lic No: Exp Date:
Name:F.O.Berg Company BROWNCD000BM 4/25/09
Phone: 509.624.8921 City Business Lic.No: 601999915
Contact Person Architect
Name: Andy Barrett Company Name:Nystrom Olson
Phone: 509.624.8921 Collins,Inc.
Architect Name:K. Sam Nystrom
Cost of Project: $ 93,000 Address: 912 W. Sprague
Describe the scope of work in detail: City: Spokane State:WA Zip:
99201
Phone: 509.328.6464 Fax:
509.328.6465
This is a small tenant improvement which includes the addition of a few interior non structural walls and the relocation of some
plumbing and light fixtures. Four new windows will be added in the existing exterior facade.
Type of Construction: III-B No. of Stories: 1 Total Building Sq Ft: 33,957
Heat Source: Existing Fire Sprinklers: Existing
Primary Occupancy: Office Sq Ft: 1,515 Secondary Occupancy: Sq Ft:
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Pe it Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws,codes . . dinances. 6) Plans or additional information may be required to be submitted,and subsequently approved before
this application ca It processed.
Signature I L • Date 5/t O f f)t)
Method of Payment:
❑ Cash ✓ Check 0 Mastercard 0 VISA
Bankcard#: Expires: VIN#:
Authorized Signature:
Effective October 28,2007
X:\NOC Projects\2007\07.59 Berg Company\Commercial Building Permit App.doc
•
Project History
PROJECT NUMBER 08001874
PERMIT USE TI -ADD OFFICES TO EXISTING MEZZANINE
SITE ADDRESS 16124 E EUCLID AVE
Date Review comments
5/19/2008 Event RECD AND ROUTED(2)CONSTRUCTION PLANS TO BLDG N/A
AND(1)TO FIRE-MT
1
,
/72
Thursday,May 22,2008 Page 1 of l
o01QOKp,NE VA<<F jig(
E>,
,r FIRE s`
DEPARTMENT
10319 EAST SPRAGUE AVE. •SPOKANE VALLEY,WA 99206-3627•(509)928-1700•FAX(509)892-4127
www.spokanevalleyfire.com
PREVENTION DIVISION
July 31, 2008
Permit#: 08001874
Project Address: 16124 E. Euclid Avenue
Project Description: Tenant Improvement—add offices to existing mezzanine
Applicant: ABC Group LLC
16124 E. Euclid Avenue
Spokane Valley,WA 99216
624-8921
RE: Revised Permit Review Comments
The Spokane Valley Fire Department has completed a review of the revised plan submittal for the above
referenced project. The revisions do not affect prior Fire Department acceptance of the issuance of the
permit.
If there are any questions please do not hesitate to call.
Sincerely,
Traci Harvey
Fire Protection Engineer
Spokane Valley Fire Department
Cc
Jodi Main City of Spokane Valley
Jenna Davis City of Spokane Valley
C:\Documents and Settings\jmain\Local Settings\Temporary Internet Files\OLK1E\Euclid E 16124 Permit Revisions.doc
Plan Review Evaluation Information
Date: 7/29/08
Permit No# 08001874
Name of Site: Mezzanine Floor for F.O. Berg
Address: 16124 E. Euclid Ave.
Use of Building: B/F-1
Type of Construction: IIIB
Fire Suppression System: Yes
Floor Area
1st Floor: N/A
2°d Floor: 1,458 sq. ft.
Occupant Load
1st Floor: N/A
2°d Floor: (B) Offices 10.80, (5) Mech. Rm. 1.26, Total: 12.06
Roof Height Eave: Peak: N/A
NREC: Yes, T.A.S.
HB 1848 All Weather Protection: N/A
Other Conditions:
Plan Reviewer: Nik Bentley
prom Dison collins
architecture planning innovation
i17 n.s. :prac7uc a
s po ka n e.Inds h ingto n3 ii
I):50,0 R E4ri4f:SW-)3286if
June 17, 2008
City of Spokane Valley
Attn: Nik Bentley, CBO
Senior Plans Examiner
11705 E. Sprague Ave.
Spokane Valley, WA 99206
Re: 16124 E. Euclid Ave.
Berg Company Remodel
City of Spokane Valley, WA
Nik,
Thanks again for taking the time to meet with me to review your plan review comments for
this project dated June 9, 2008. In response to our discussion:
1. Please find attached revised sheets A2.01 and A2.02 correcting the upper level
name from "Mezzanine" to "Second Floor".
2. Occupancy sensors will be added to the light switches in the offices and
conference room on the second floor.
3. This letter is also to confirm that spaces serving equal function to those listed on
the second floor are provided and are ADA accessible within the existing main floor
office space.
Please call if you have any questions or need any additional information.
- t•ti
K. Sam Nystrom, AIA
Principal, NOC inc.
0000"sem,
Spokane
galley
11705 E Sprague Ave Suite B3 •Spokane Valley WA 99206
509.688.0035 ♦ Fax: 509.688.0037♦ cityhall®spokanevalley.org
Nystrom/Olson/Collins Architectural
912 W. Sprague Ave.
Spokane, WA 99201
Re: 16124 E. Euclid Ave. Mezzanine Floor Remodel
Date: June 9, 2008
Dear Nystrom/Olson/Collins Architectural,
In conducting a preliminary review of your submitted plans, I respectfully request a clarification
on the items listed below.
1) Please provide details of the required second egress component from the mezzanine
floor area. With ten(10)percent of the mezzanine floor enclosed and the occupant load
for the mezzanine floor over ten(10), a second exit leading directly to a rated exit or to
the exterior will be required as per IBC, section 505.4 (1), (2), (3),and(5).
2) For verification of accessibility,please provide information describing the same use on
the mezzanine floor to the use on the main floor. An example would be if you have a
conference room on the mezzanine floor and a conference room on the main floor,the
accessibility requirements have been met.No ADA access would be required to be
provided to the mezzanine floor as per IBC, section 505.3 and 1007.
I have finished the plan review of the submitted plans accept for the items listed above. Details
on these points would expedite the plan review process to gain issuance of the expected permit.
If there are any questions or information that I could help you with,please do not hesitate to call
me at(509)688-0051. I look foreword to assisting you through this process.
Sincerely,
Nik Bentley, CBO
Senior Plans Examiner
A or City Use Only
=: "" PLUS Project Number r
CITY OF
pok .ne Address
Project
441•00
alleVy-
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is t I la
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07
PERMIT CENTER
CTTY of
Spokane y Project Transmittal
.Valley® 11703 E Sprague Ave. Suite B-3 Spokane Valley WA 99206
Phone: 509.688.0036 Fax: 509.688.0037
New Application/Pre-Application ❑ Provide one of the following (REQUIRED FOR ACCEPTANCE):
Response to Review Comments PLUS Project#:• �� r/ c�" # L!
Revisions to Application ❑ Parcel Number:
Other (Describe Below): ❑ Site Address: 1 (C, 12 q t_ L , t d vQ,'(1,Ut
Route to (Please check all that apply):
Division #of Sheets/Type of Document/#of Copies Received by:
Building VERIFIED/INITIALS
3 , ) t . „\ 1 C' k,. ek )410,-'
/ ► w .0-z, / ''
QC Check by: j
❑ Development Engineering / / VERIFIED/INITIALS
/ / °
/ / o
IQC Check by:
VERIFIED/INITIALS
❑ Planning / / o
/ /
/ / o
/ / °
QC Check by:
❑ SV Fire Department
/ / VERIFIED/INITIALS
o
/ I
/ /
/ / o
QC Check by:
Project Contact Information: I
Name: l,IL,1 0n C li,t � Phone: �l�,J9 -32t/`(0 014
04
Email: jGYI u,,1k-2 hGCctr=1'd-t - CGV.\-\ Fax: C)O9 - 3L -b W 5
Relationship to Project: ,.
Architect ❑ Engineer ❑ Other Design Professional 0 Contractor 0 Owner/Applicant
DATE STAMP: z 1,- t`
-.,,
nystrorti. collins
architecture planning innovation
12 ,,,rest sprague a/0T
spokarie H:ligion 99201
r, :=00.9 328 322,
Transmittal Sheet
To: City of Spokane Valley, Permit Date: 06.17.08
Attn: Nik Bentley, CBO Project No: 07.59 F.O. Berg
CC:
We For
Transmit: Z drawings Evia E-mail Your: El approval
El specifications El use
Z letter Z review&comment
El 111 information
Quantity Drawing No. Description Revision Date
3 Design Clarification Letter
1 2 Wet Stamped Drawings A2.01 + A2.02
2 2 Drawings A2.01 + A2.02
Remarks:
Submitted By: Carson Schultz
• . PERMIT CENTER
SCITY OF
pokane . Project Transmittal
4• VA.11ey* 11703 E Sprague Ave. Suite B-3 Spokane Valley WA 99206
Phone: 509.688.0036 Fax: 509.688.0037
New Application/Pre-Application ❑ Provide one of the following (REQUIRED FOR ACCEPTANCE):
Response to Review Comments ❑ PLUS Project#: da0oJg77'
Revisions to Application ❑ Parcel Number: t v6L,o
Other (Describe Below): ❑ Site Address:
Route to (Please check all that apply):
Division #of Sheets/Type of Document/#of Copies Received by:
VERIFIED/IN I
C9� Building
/ PCc� Jr S s7 /
/ /
/ /
/ / °
QC Check by:
❑ Development Engineering VERIFIED/INITIALS
°
QC Check by:
VERIFIED/INITIALS
O Planning
/ / o
/ / o
QC Check by:
O SV Fire Department / / VERIFIED/INITIALS
/ / 0
a
_..
QC Check by:
Project Contact Information:
Name: mss- Phone:
Email: Fax:
Relationship to Project:
O Architect 0 Engineer 0 Other Design Professional 0 Contractor 0 Owner/Applicant
DATE STAMP:
nystrovil ((t-((gi coffins
architecture planning innovation
9, v,,E,,,,3tri
si-,oka ;e 992C,I
Transmittal Sheet
To: City of Spokane Valley Date: 07.23.08
Attn: Nick Bentley Project No: 07.59 FO BERG
CC:
We For
Transmit: drawings Evia E-mail Your: approval
LI specifications use
fl letter review&comment
0 LI information
Quantity Drawing No. Description Revision Date
3 Permit Set 07.17.08
Remarks:
Submitted By: Sam Nystrom
Fad°r QOMNE vAt sf•
9 u FIRE
ofor
DEPARTMENT
10319 EAST SPRAGUE AVE. •SPOKANE VALLEY,WA 99206-3627•(509)928-1700•FAX(509)892-4127
www.spokanevalleyfire.com
PREVENTION DIVISION
May 28, 2008
Permit#: 08001874
Project Address: 16124 E. Euclid Avenue
Project Description: Tenant Improvement—add offices to existing mezzanine
Applicant: ABC Group LLC
16124 E. Euclid Avenue
Spokane Valley,WA 99216
624-8921
RE: Permit Acceptance
The Spokane Valley Fire Department approves the issuance of the permit for the tenant improvement for
16124 E. Euclid Avenue (F.O. Berg Co.)with the following conditions:
1. Revisions to the fire suppression system require a separate permit.
2. Revisions to the fire alarm system require a separate permit.
3. Provide fire extinguishers per IFC section 906.
If there are any questions please do not hesitate to call.
Sincerely,
Traci Harvey
Fire Protection Engineer
Spokane Valley Fire Department
Cc
Jodi Main City of Spokane Valley
Jenna Davis City of Spokane Valley
C:\Documents and Settings\jmain\Local Settings\Temporary Internet Files\OLK11\Euclid E 16124 Permit Acceptance.doc
rject• � Project Prezious pre-app meetingEl
Spokane .
Transmittal Plan rethions
.0•OValleyCity of Spokane Valley Transmittal Date:
Community Development Friday,July 25,2008
Department
11703 E.Sprague Ave,Suite B3
Spokane Valley,WA 99206
Phone:509.688.0036
Site Address: 16124 E EUCLID AVE Project Number: 08001874
Parcel Number: 45122.9176
Zoning: 1-2 Water District:
Fire District:
Applicant: ABC GROUP, L.L.C. Owner: ABC GROUP, L.L.C.
16124 E EUCLID AVE 16124 E EUCLID AVE
SPOKANE VALLEY, WA 99216 SPOKANE VALLEY, WA 99216
(509) 624-8921
e-mail: e-mail:
Contact: ABC GROUP, L.L.C. Occupant:
16124 E EUCLID AVE
e-mail:
SPOKANE VALLEY, WA 99216
(509) 624-8921
e-mail:
Contractor: BROWN CONTRACTING & DEV CO Arch/Engineer:
2205 N WOODRUFF STE 1
SPOKANE WA 99206
(509) 444-4400
e-mail: NYSTROM OLSON COLLINS
Project TI -ADD OFFICES TO EXISTING MEZZANINE
Description:
Building Landuse Engineer Utilities Health Fire Dist Assessor
REVISED PERMIT SET
Please send all plan review and project comments via e-mail to the
highlighted individuals.
t- � � PERMIT CENTER
Spokane Project Transmittal
jValley* 11703 E Sprague Ave. Suite B-3 Spokane Valley WA 99206
Phone: 509.688.0036 Fax: 509.688.0037
New Application/Pre-Application ❑ Provide one of the following (REQUIRED FOR ACCEPTANCE):
Response to Review Comments ❑ PLUS Project#: 000/g 7Y
Revisions to Application ❑ Parcel Number: /6 /2 Y b U6 Li p
Other (Describe Below): ❑ Site Address:
Route to (Please check all that apply):
Division #of Sheets/Type of Document/#of Copies Received by �;
VERIFIED/IN g
Building - / f�f m I T .c ET I
/ I °
/ / o"
/ /
QC Check by.!.--1,'i'-'24.,'
/ VERIFIED/INITIALS
❑ Development Engineering / /
/
/ / °
/ / El
QC Check by
❑ Planning / /
VERIFIED/INITIALS'"
/ / Q4
/ / 0
/ / 0
QC Check by::,,,A,,\-- , M
VERIFIED/twTiAL
❑ SV Fire Departments
°__ . .,
/ /
0
/ /
/ /
QC Check by:,_ L , ...,
Project Contact Information:
Name: �--� Phone:
Email: Fax:
Relationship to Project:
❑ Architect 0 Engineer 0 Other Design Professional 0 Contractor 0 Owner/Applicant
DATE STAMP:
CITY CI;= jr („EA. ,F l'ALL(^'t
1
$Y: •l -
Newproject
4 Project
Previous pre-app meeting
CITY OF
+�SpolkanePlan revisions
Transmittal
4000 ValleY
City of Spokane Valley Transmittal Date:
Commuiuty Development Thursday,June 19,2008
Department
11703 E.Sprague Ave,Suite B3
Spokane Valley,WA 99206
Phone: 509.688.0036
Site Address: 16124 E EUCLID AVE Project Number: 08001874
Parcel Number: 45122.9176
Zoning: 1-2 Water District:
Fire District:
Applicant: ABC GROUP, L.L.C. Owner: ABC GROUP, L.L.C.
16124 E EUCLID AVE 16124 E EUCLID AVE
SPOKANE VALLEY, WA 99216 SPOKANE VALLEY, WA 99216
(509) 624-8921
e-mail: e-mail:
Contact: ABC GROUP, L.L.C. Occupant:
16124 E EUCLID AVE e-mail:
SPOKANE VALLEY, WA 99216
(509) 624-8921
e-mail:
Contractor: BROWN CONTRACTING & DEV CO Arch/Engineer:
2205 N WOODRUFF STE 1
SPOKANE WA 99206
(509) 444-4400
e-mail: NYSTROM OLSON COLLINS
Project TI -ADD OFFICES TO EXISTING MEZZANINE
Description:
Building Landuse Engineer Utilities Health Fire Dist Assessor
A2.01 i
A2.02
Please send all plan review and project comments via e-mail to the
highlighted individuals.
New project 0
Project
Previous pre-app meeting f
‘ 1 °
Kang Tran s rn�ttal Plan revision
City of Spokane Valley Transmittal Date:
Community Development Wednesday,June 18,2008
.000014/Talley
Department
11703 E.Sprague Ave,Suite B3
Spokane Valley,WA 99206
Phone: 509.688.0036
Site Address: 16124 E EUCLID AVE Project Number: 08001874
Parcel Number: 45122.9176
Zoning: 1-2 Water District:
Fire District:
Applicant: ABC GROUP, L.L.C. Owner: ABC GROUP, L.L.C.
16124 E EUCLID AVE 16124 E EUCLID AVE
SPOKANE VALLEY, WA 99216 SPOKANE VALLEY, WA 99216
(509) 624-8921
e-mail: e-mail:
Contact: ABC GROUP, L.L.C. Occupant:
16124 E EUCLID AVE e-mail:
41 }/I'l,iti
SPOKANE VALLEY, WA 99216
(509) 624-8921
e-mail: V
Contractor: BROWN CONTRACTING & DEV CO Arch/Engineer: It41A
2205 N WOODRUFF STE 1A.,0
SPOKANE WA 99206 \'-(509) 444-4400
e-mail: Ti
Project
T1 -ADD OFFICES TO EXISTING MEZZANINE a
C1
Description:
Building Landuse Engineer Utilities Health Fire Dist Assessor
DESIGN •2.
CLARIFICATION J
WET STAMPED j
DRAWINGS )
DRAWINGS
Please send all plan review and project comments via e-mail to the
highlighted individuals.
PERMIT CENTER
CITY OF
pokane Project Transmittal
4.Valley. 11703 E Sprague Ave. Suite B-3 Spokane Valley WA 99206
Phone: 509.688.0036 Fax: 509.688.0037
New Application/Pre-Application ❑ Provide one of the following (REQUIRED FOR ACCEPTANCE):
Response to Review Comments PLUS Project#: j —/ p'? .
Revisions to Application o Parcel Number: q
Other (Describe Below): ❑ Site Address: I Vi I Z „r_
. f=t,l.�; t c IV ve,rk t l.e
Route to (Please check all that apply):
Division #of Sheets/Type of Document/#of Copies Received by:
Building , ) ,-, , r-_c_i^ c# .1 A die.i___ 14„., ,,,,
3
r
1 / ► _ t Iffain, 11 V d 0 - P02
2, / ) i2-i0 11 .oz I
/ /
QC Check by .
❑ Development Engineering / / VERIFIED/INITIALS
/ /
/ /
/ /
QC Check by: . ':
❑ Planning / / v�>EIEi�fiNlriA7_s
/ / o
/ / c�
/ /
QC Check by:..,. . k:.
❑ SV Fire Department / / vERRIFIED/iNI7iALs
/ /
40
o
QC.Check by:.
Project Contact Information: n �i I�!�
Name: l,Q,rSon SC\,\ J.,,T LZ Phone: 51�1 -320-UJ_I to 4
Email: jG\(1t„1,1k--- r1 OCC-YC- .. COMM Fax: c509 - 32- -lot-i(19 5
Relationship to Project: C/ .
Architect 0 Engineer 0 Other Design Professional 0 Contr ,cf& ;,n:O per//Applicant
DATE STAMP: fu/Lf _ v/1/-4
Nystrom dson coffins
architecture planning innovation
cpok ana.>ash lnq ion 99201
p 509.328.6?6d I 502325 6455
June 17, 2008
City of Spokane Valley
Attn: Nik Bentley, CBO
Senior Plans Examiner
11705 E. Sprague Ave.
Spokane Valley, WA 99206
Re: 16124 E. Euclid Ave.
Berg Company Remodel
City of Spokane Valley, WA
Nik,
Thanks again for taking the time to meet with me to review your plan review comments for
this project dated June 9, 2008. In response to our discussion:
1. Please find attached revised sheets A2.01 and A2.02 correcting the upper level
name from "Mezzanine" to "Second Floor".
2. Occupancy sensors will be added to the light switches in the offices and
conference room on the second floor.
3. This letter is also to confirm that spaces serving equal function to those listed on
the second floor are provided and are ADA accessible within the existing main floor
office space.
Please call if you have any questions or need any additional information.
K. Sam Nystrom, AIA
Principal, NOC inc.
New project
• Project Previous pre-app meeting °
poilirkane Transmittal Plan revisions °
City of Spokane Valley Transmittal Date:
.0014/alley
Community Development Tuesday,May 20,2008
Department
11703 E.Sprague Ave,Suite B3
Spokane Valley,WA 99206
Phone: 509.688.0036
Site Address: 16124 E EUCLID AVE Project Number: 08001874
Parcel Number: 45122.9176
Zoning: 1-2 Water District:
Fire District:
Applicant: ABC GROUP, L.L.C. Owner: ABC GROUP. L.L.C.
16124 E EUCLID AVE 16124 E EUCLID AVE
SPOKANE VALLEY. WA 99216 SPOKANE VALLEY. WA 99216
(509) 624-8921
e-mail: e-mail:
Contact: ABC GROUP. L.L.C. Occupant:
16124 E EUCLID AVE
e-mail:
SPOKANE VALLEY. WA 99216
(509) 624-8921
e-mail:
Contractor: UNKNOWN Arch/Engineer:
UNKNOWN
UNKNOWN. WA UNKNOWN
( ) - 0
e-mail:
Project TI -ADD OFFICES TO EXISTING MEZZANINE
Description:
Building Landuse Engineer Utilities Health Fire Dist Assessor
APPLICATION t '
PLANS 41
le f
NRECS ----
Please send all plan review and project comments via e-mail to the
highlighted individuals.
PERMIT CENTER
CITY of
o• kane Project Transmittal
.oVal1eyA 11703 E Sprague Ave. Suite B-3 Spokane Valley WA 99206
Phone: 509.688.0036 Fax: 509.688.0037
New Application/Pre-Application Ef Provide one of the following (REQUIRED FOR ACCEPTANCE):
Response to Review Comments ❑ PLUS Project#:
Revisions to Application ❑ Parcel Number: x`03 Z
Other (Describe Below): ❑ Site Address: /b /Z7 E• t✓cL,a 5pok4NE(4tccr,i,/,¢
Route to (Please check all that apply):
Division #of Sheets/Type of Document/#of Copies Received by:
VERIFIED/INITIALS
Building iy / AR N, D'
_,y / glen- /
/ / °
/ / ❑
QC Cheek by:
❑ Development Engineering / / VERriALs
oIFiEo/INr
/ /
/ / 0
/ / C3
cl
QC Check by:
VERIFIED/INITIALS
❑ Planning / / j o
/ /
/ / a
/ /
QC Check by:
ly /
SV Fire Department /¢�N, "dec.t tie,71: leu-cE • •/ ! VERIFIEDtINITIAi
I /
/ / o
/ / o
QC Check by:
Project Contact Information:
Name: egq iz.' 5,4fr/ //rhea/, Phone: 3V7•3Z8.6 y(,l
y1S-REmail: A/yrirdrvi c 1 D G otrci. GDM Fax: 3Z8. 4,/.1S-
Relationship
elationship to Project:
CiArchitect 0 Engineer 0 Other Design Professional ❑ Contractor 0 Owner/Applicant
DATE STAMP:
fl3T2CollinsOffl
architecture planning innovation
12 west sir tar avenue
spokane, wasnington 99'201
1.8 509 328.6464 r. :-9.3)9:3'28 6465
Transmittal Sheet
To: City of Spokane Valley Date: 05.16.08
Attn: Permit Center Project No: 07.59 F.O. Berg
CC:
We For
Transmit: CE drawings Livia E-mail Your: El approval
fl specifications use
El letter LI review&comment
CENRECs information
Quantity Drawing No. Description Revision Date
3 14 Wet Stamped Drawing Set
1 NREC Compliance Report
1 Payment Check
1 Permit Application
Remarks:
All NREC requirements listed by Technical Assistant Services have been addressed and are
being implemented via Brown Contracting.
Submitted By: Carson Schultz