Loading...
2010, 11-12 Permit Set: 10-3688 Tenant ImprovementsPermit Ce• 11703E agu Ave, Suite =3 j"'mss Spokane Valley, WA ®d�PERMiT C LATER �Valley� (509)688-0036 Ax: (509)6:: �Q0i7 j ,O'i www.spokaneva ley.org v cct Community Development I�fej (Non-residential) ,�F Commercial Constructionzi�R��a�_1- sem" ruction „Tenant Improvement Permit Application [Other: SITE ADDRESS: I (PIM 4 J% . y it I2) As\ g �1 jL � V�'�( ()U PJ CE VED e PERMIT NUMBER: PERMIT FEE: ASSESSORS PARCEL NO: LEGAL DESCRIPTION; Building Owner . . Contractor ._ Name: .jam w(..a co Name: Address: (Lpkz.4,.(z.,.(z.1‘.0,.�0 Address: City: Xz v State: w46... Zip: City: State: Zip: Phone: Fax: Phone: Fax: mt 2...‘ Contractor Lic No: Exp Date: Occupant ofStructure C Business Lic. No: �, f 0A42 -17 --err Name: `� Phone: �Q24, j�j� Architect Contact Person Company Name: 10\15_.\..v6114 v k,..„, a Name: 5-041/\ Architect Name: \' s` 1--OVV\ Phone: Address: qi Z 0j , s{: e, - Cost of Project: $ /j') of1-1o.,%- City: State: Zipz:Io-219 ( `-' Pon: _J_2�.�_ Fax 1 =t4C - ,. +10 ..—...,, ,.e., --1, c., a,,....;,. -- 10,Agctik l_ 17r t-'t-t-11oL5S Fen_ Type of Construction: • , No. of Stories: 1 Total Building Sq Ft: Heat Source: #` C'Si) Fire Sprinklers: yC 5 t Primary Occupancy: Sq Ft: Secondary Occupancy: Sq Ft: The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) AH construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. Signature COt1,its. ClS TZ� Date �t k 1 1 d Method of Payment: ❑ Cash Bankcard #: 0 Check ❑ Mastercard Expires: ❑ VISA VIN#: Authorized Signature: REVISED 8/25/2005 For City Use .Only) PLUS Project Number/O Th Project Address /(Q/,2 (/ 'ic lcc 11703 E Sprague Ave Suite B-3 0 Spokane Valley WA 99206 509.688.0036 0 Fax: 509.688.0037 0 permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. =If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be, changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE —APPLICANT PINK — BUILDING FILE REV 9/07 TENANT IMPROVEMENT FOR: BERG COMPANY 16124 E. EUCLID AVENUE VERADALE, WASHINGTON ABBREVIATIONS SEE ALSO INDNIDUAL I -OR OTHER ABBREVIAVIONS NOT LISTED HERE KIT KITC-1EN AT LAMINATE CENTERLINE LAVAIORY POUND OR NUMBER MAXIMUM MECHANICAL ACOUST ACOUSTICAL MANUFACTURER A. ADJUSTABLE MINIMUM AAPROX APPROX., MISC MISCELLANEOUS ANCH ARCM IC I URAI MO MOUNTED A I ABOVE FINISH OLOOR MULL ION RI OG. BUILDING NOT IN CONTRACT BLK. BLOCK NO. NUMBER BLKG. BLOCKING NOM. NOMIN, BM BEAM N I S NOT TO SCALE BOT BOTTOM OWNER RURNISHED. CAB CABIN, COM- INSTALLED CER 0E10..11C OFFICE CLG CEILING CLR CLEAR ROD. PARTICI, ROARD COL COJUMN LAM AIAST1O LAMINATE CONN. CONNECTION PR. PAIR CONST CONSTRUCTION PT. POINT CONT. CONTINUOUS PTN. PARTITION C I. CERAMIC TILE PRESERV. PRESERVATIVE CTSK COUNTERSUNK P. PANT CA/. CENTE0 CR!. CARPET O.T. QUARRY TL DBL DOUBLE L DETAIL DIA DIAMETER DIM DIMENSION ON DOWN DOOP DWG DRAWING EA EACH EQ EQUAL EXIST EXST1NG EXT DI I ERFOR FIRE EXTINGUISHER .C. FIRE EXTINGUISHER CARNET FACTORY F1NSH FIN FINISH FURNISH. AND INSTALLED BY OWNER R FLOOR FLUOR. FLUORESCENT F 0 C. FACE CONCRETE INSTALLED BY CONIRACTOR 0111iR. FURRING RAD REFRIGERATOR RE1N0 REINFORCED RFOJIRED RES1L RESILIENT ROOM RT RUBBER,. R B RUBBER BASE REDWOOD SIDING SOLLD CORE SECT SECTION SPEC :,,PE&TATION STAINLESS STEEL SID STAMJARD STOR STORAGE STRUCT SUSP SHEET VINV GA GAUGE TELEVISION H.C. HOLLOW CORE UNLESS NOTED OTHERWISE HDR HEADER HMO NA/NOV/00D VINzL COMMOS1 1 ION TLE HOR1Z. HORIZONTAL VESTIBULE HP POUR V T. VINVI HT I -EIGHT H.R HANDIZAIL W., WITH INC.. INCANDESCENT RING ID INSIDE R (DEA ) WOOD INT. NTFRIOR WATERPROOF ON WEIGH .11- JOINT WAIF/RESISTANT PROJECT TEAM ARCHITECT NYSTROM OLSON ARCHITECTURE 912 W. SPRAGUE AVENUE SPOKANE, WASHINGTON 99201 (509) 328 6464 DRAWING SYMBOLS ROOM SYMBOL 6042008018. WIN,OWSaMROL OETaL a INTERIOR ELEVATION WW_L 01,0 JSION CLOUD 0 0— — 61,0LINES NCRTH ARROW GENERAL NOTES: 1 TNE CON -MAC -OR SHALL REPORT TO THIS OFF ICL ANY ERROR, BLE FO CORRECTING AN, MIS 1A.J.I.S Al THE JOBS1 I E TO T -1E 2. BEFORE ORDERING ANY MATERIALS OR DONS ANY WOW T -1E CONTRACTOR THE SRE AND THOSE INDICATED ON THE DRAWINGS SHA1 I DE SUBMITrED TO THO ARCHITECT FOR INSTRUCTIONS AND CONSIDERA IONS DEMO. PROCEEDING WI 1 H THE WORK 3 USER -I WI -.ERE OTHERWISE SPECIFIED THZ CONTR0CTOR SHALL AT ALL pROVIDO PROTECT/ON AGAINST WEATHER TO MAINTAIN AI I WORK 0WTEIZALS. APPAILOUS. AND FlIOURES PROM INJURY OR DAMAGES AT T IE END OF DAYS WORK ALL NEIN WORK LIKELY TO BE DAMAGED SHALL BE COVI0RLD 01,0. I 1ERWSE PROTECTED AS REQUIRED 9. THE CONZPAC,OR S11.0.1 MAIN AT ALL TMES ADEQUATE SAFETY BARRICADES AND CLEAR ACCESS IN AND OLT OF THE VVORK SITE SO AS 5. C./COUNTY APPROVED ANS SHALL BE NEP I IN A SECURE PLACE AND SMALL NOT BE USOD EV WORKERS. FME CONTRACTOR SHAn BE SAME INZORMATION..: CON FRACTOR SHALL ALSO MAINTAIN. IN MOE AMEND.. AND CHANGE ORDERS ON 1HE PREMISES AT ALL TIMES. THESE ARE TO BE LIND, O ,1E CARE OF THE JOB SUPERINTENDENT AND ARE TO BE GIVEN TO THE OMER UPON COMPIFTION CF zHE ..0011 RSO "A o` O�,�RSTARsas,EM 24 ''''''',0085. oNE�ME NING INFORMATION 00.022 REQUIEM FLOOR AM, KII91109rnLa Rs.: nO sF. s. PR 2I 0 1)a. SESAc2s. `E. 2 sT.) 8006= . = 061220:: �6IUEuR1. rbsrm.. VICINITY MAP EXISTING BUILDING INFORMATION 1 N40.AE OF PROJECT: 3 OWNER RRLVETaQUIRED -2 EXISTS REDUIRED. 172RTATLIPZ0 INC SAM NYSTROM DRAWING INDEX A.2 01 FLOOR MANS ENLARGED REF_ECIEU LEUNG PLAN DJ. SCHEDULES AS 01 DETAILS MLCHANICAL APPROVED UNDER PREVIOUS PERMI F000001070 ELF. RICAL APPROVED UNDER PRENOUS PERMIT 7,0000-8, EUCLID AVENUE �a 08064= REVISIONS DESGPIPION I OATE 0044018 OA 7,toE' >—j0 Zz� Q>z 2 g. 00� Lu— o U W rc g W C Q ¢ W m > :: SITE PLAN Pro PERMIT SET G0.1 COVE6 SHEET 10.80 .0310