2010, 06-10 Permit App: 10001620 Residence Project Number: Inv: 1 Application Date: 06/10/2010 Page 1 of 3
SOi " '
CITYPERMITCENTER
THIS IS NOT A PERMIT
400011644t1tl"J ®be assessed for commencing wQlrkoW�ga�lit, Suite B-3
Spokane Valley,WA 99206
Project Information:
Permit Use: SFR W/ATT GAR Contact: LINDSEY CONSTRUCTION
Address: P.O.BOX 30792
C-S-Z: SPOKANE WA 99223
Setbacks:Front Left: Right: Rear: Phone: (509)879-3420
Group Name:
Site Information: Project Name:
Plat Key: Name: Range District: East
Parcel Number: 45243.3501 Block: Lot:
SiteAddress: 16204 E 10TH LN Owner:Name: SHELLEY LK RES DEV/SHELLEY
Address: 8225 N DIVISION
Location::CSV SPOKANE,WA 99208
Zoning: R-4 SF Res Urban District
Water District: 010 VERA Hold: ❑
Area: 8,272 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information: 11, , _ u . "'W0,111M,-r , m ,. a ..: . :: �rr,_.Kv µ: a
Review
Building Plan Review Released By:
Originally Released: 06/09/2010 By: tmelbourn
Landuse/Zoning/HE Conditions Released By:
Originally Released: 06/07/2010 By: cjjanssen
Sewer Review Released By:
Permits: �� m :
Operator: JD Printed By: HM Print Date: 06/10/2010
Project Number: Inv: I Application Date: 06/10/2010 Page 2 of 3
SCITY Of PERMIT CENTER
poMne THIS IS NOT A PERMIT
4000011Watlere assessed for commencing woilvIDtls4 eep► li , Suite B-3
Building Permit Spokane Valley,WA 99206
Contractor: LINDSEY CONSTRUCTION INC Firm: LINDSEY CONSTRUCTION INC
Address: PO BOX 30792 Phone: (509)879-3420
SPOKANE,WA 99223
This Application: Total Project:
Description Grp Type Notes Si Ft Valuation Sq Ft Valuation
1&2 FAMILY R-3 VB 1,131 $111,912.45 1,131 $111,912.45
2ND FLOOR R-3 VB 815 $60,481.15 815 $60,481.15
BASEMENT F R-3 VB 768 $15,360.00 768 $15,360.00
COV DECK R-3 VB 37 $555.00 37 $555.00
GAR WOOD U-1 VB 421 $7,999.00 421 $7,999.00
Totals: 3,172 $196,307.60 3,172 $196,307.60
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $1,536.95
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $614.78
Permit Total Fees: $2,156.23
Mechanical Permit
Contractor: A J HEATING&AIR Firm: A J HEATING&AIR CONDITIONI
Address: 1235 E 36TH AVE Phone: (509)838-6223
SPOKANE,WA 99203
Item Description Units Unit Desc Fee Amount
HEAT PUMP OR A/C 0-3 TONS 1 NUMBER OF $13.00
VENTILATING FANS 1 DUCT 6 NUMBER OF $66.00
GAS LOG OR GAS INSERT 1 NUMBER OF $11.00
AIR HANDLER<=10,000 CFM 1 NUMBER OF $13.00
Permit Total Fees: $103.00
Operator: JD Printed By: HM Print Date: 06/10/2010
Project Number: Inv: I Application Date: 06/10/2010 Page 3 of 3
SCITY of PERMIT CENTER
pokane THIS IS NOT A PERMIT
1l be assessed for commencing work3vitivothttkpenuil,Suite B-3
4000"111
Plumbing Permit Spokane Valley,WA 99206
Contractor: END PLUMBING INC Firm: END PLUMBING INC
Address: 3309 N FOWLER RD Phone: (509)328-0261
SPOKANE WA 99206
Item Description Units Unit Desc Fee Amount
TOILETS/BIDETS 4 NUMBER OF $24.00
SINKS 6 NUMBER OF $36.00
SHOWERS 3 NUMBER OF $18.00
TUBS 1 NUMBER OF $6.00
DISH WASHERS 1 NUMBER OF $6.00
GARBAGE DISPOSAL 1 NUMBER OF $6.00
CLOTHES WASHER 1 NUMBER OF $6.00
WATER HEATER-ELECTRIC 1 NUMBER OF $6.00
Permit Total Fees: $108.00
ALL RESIDENTIAL DRIVEWAYS MUST BE PAVED PRIOR TO FINAL INSPECTION PER
SVMC 19.40.020(B)
Payment Summary
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $2,156.23 $2,156.23 $632.70 $1,523.53
Mechanical Permit $103.00 $103.00 $0.00 $103.00
Plumbing Permit $108.00 $108.00 $0.00 $108.00
$2,367.23 $2,367.23 $632.70 $1,734.53
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: HM Print Date: 06/10/2010
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner.The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense.At a minimum,the following inspections ARE
REQUIRED by City Code:
FOOTING—when forms and reinforcement are in place and prior to placement of concrete-all structures,including manufactured homes.
NOTE:This inspection includes review of the structure's setback from property lines.Minimum setbacks are established by City of Spokane
Valley Ordinance.Curb lines and fence lines are not necessarily indicative of property lines.The responsibility to comply with applicable
setback provisions lies solely with the permittee-neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines.Please verify their location prior to locating your structure.Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION—when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING—after rough-in,before covering,and final.
MECHANICAL—rough-in of piping,before covering,metal chimneys before concealment,and final.
FRAMING—after all framing,bracing and blocking is in place, rough electrical,plumbing and mechanical systems are complete,and prior to
concealing.
FINAL—when complete and prior to occupancy and/or use.All permits require final inspection.
NOTE:In addition to inspection of the structure,this inspection includes review of site improvements(typically depicted on the approved site
plan)required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants,fire department access,
on-site drainage('208'swales),road improvements,parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES—Final inspection required when complete,stairs,handrails,skirting,etc.installed,and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS—prior to cover.
RIGHT-OF-WAY/APPROACH—prior to placement of concrete/asphalt or,if gravel approach,after completion.
In addition to the above,any plumbing or mechanical systems or material which would be concealed by framing,drywall,concrete,etc.must
be inspected prior to cover.Check with the Building department for"special inspections"in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building,plumbing(includes interior reversals for sewer)and Road cuts for utilities or driveways,City of Spokane Valley
mechanical,City of Spokane Valley Building Division 688-0054 Public Works 688-0195 or State Dept of Transportation
324-6000
Permits and inspections for electrical wiring,State Department of Labor Permits and inspections for Sewer Connection,Spokane County Utilities Division
And Industries 324-2640 477-3604
Permits and inspections for on-site septic systems, Spokane Regional Fire sprinkler and alarm systems and private access road inspections,Spokane Valley
Health District 324-1560 Fire Department 892-4122
State law RCW 19.122 requires that prior to any excavation the"CALL BEFORE YOU DIG"center must be notified.Call before you dig at least 2 working days in advance,456-8000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a)work is not started within 180 days of obtaining a permit,or b)work is
abandoned for 180 days or more after beginning work,or c)after two years from the date of permit issuance,regardless of whether the work is
finished. If a permit is expired for time,a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100%refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80%of a permit fee may be
authorized when no work has been done under the permit issued.Refunds of not more than 80%of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner/Agent Date
Staff Approval Date
anoF (Staff Use Only)
Spokane PERMIT NUMBER: �. , lley PERMIT FEE:
CITY OF SPOKANE VALLEY
Community Development Department FIPCFNCD
Permit Center '• e , I IY (FN i p- Q
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206 4 JUN 0 is 2010 -, ��,
Tel: (509) 688-0036 ��` '�-�'
Fax: (509) 688-0037 ;Project OM
permitcenter spokanevallev.orq i
Nome.---- -______- ----
RESIDENTIAL
— -RESIDENTIAL CONSTRUCTION PERMI
NEW CONSTRUCTION ADDITION/REMODEL ACCESSORY BUILDING
DECK 0 OTHER
SITE ADDRESS:16204 EAST TENTH LANE
ASSESSORS PARCEL NO.:45243.3501 LEGAL DESCRIPTION:LOT 1 BLOCK 5
SHELLY LAKE FIFTH ADDITION
BUILDING OWNER NAME:
NAME:LINDSEY CONSTRUCTION INC
ADDRESS:PO BOX 30792
Cm:SPOKANE STATE:WA Zip:99223
PHONE:568-1013 FAx:443-1013 CELL:
CONTACT NAME:GREG STIRN
PHONE:568-1013 FAx:443-1013 CELL:
CONTRACTOR NAME:LINDSEYCONSTRUCTION INC
MAILING ADDRESS:PO BOX 30792
CITT:SPO KAN E STATE:WA ZIP:99223
PHONE:568-1013 FAx:443-1013 CELL:
CONTRACTOR LICENSE No.:LINDSCI066OW ExpIRES:8/11 CITY BUSINESS LICENSE
NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
WE WILL BE BUILDING ONE SINGLE FAMILY RESIDENCE WITH ATTACHED GARAGE
PROPOSED USE:
RESIDENCE
Effective October 28, 2007 Page 1 of 2
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.1.doc
/ o _ /` Z`'
•
•
****YOU MUST COMPLETE THE FOLLOWING****
MARK N A IF N•T APPLICABLE
Height to Peak:30 Dimensions:36X45 No. of Stories:2 Total Habitable 27/4
Space:2662
Main Floor SQ FT:768. Upper Floor SQ Unfinished Basement ; Finished Basement
#3 f - FT:$94 / — SQ FT: SQ FT:768 0 g
Garage SQ FT: Deck overed Pati. Impervious Surface 30% Slopes on
2i SQ F 3 7 Area:1900 Property:
No. of Bedrooms:3 Construc • Heat Source:HEAT Sewer or
Type:WOOD FRAME PUMP Septic:SEWER
TOTAL COST OF PROJECT: $210000
DISCLAIMER
The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may b required to be submitted and subsequently/•.roved •efore this appl' ation can be processed.
Signature 44411 (AeLp.,,�u4Aj .AAAA. 4/4 Date:6/2/10
"0
Method of payment: 0 Cash 0 Check 0 Visa 0 Mastercard
Bankcard #: EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 2 of 2
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.1.doc
Permit Center
11703E Sprague Ave,Suite B-3
SSTMa' e Spokane Valley,WA 99206 PERMIT NUMBER:
1 y (509)688-0036 FAX:(509)688-0037 PERMIT FEE:
Community Development perrmtcenterna,spokanevalley.org
Mechanical Permit Application ❑ Commercial ® Residential
SITE ADDRESS: /67.11 7 C�
Building Owner
Name:LINDSEY CONSTRUCTION INC Phone:568-1013 Fax:
Address: City: State: Zip:
Contractor
Name:AJ HEATING Phone: Fax:
Address:1322 S PARK City:SPOKANE VALLEY State:WA Zip:99212
License No: City Business Lic:
Contact/Project Manager:
Name:TOM SARGENT Phone:496-5133
#UNITS
FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU
FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU
DUCT WORK SYSTEM
HEAT PUMP/AIR CONDITIONER 0-3 TON 1
AIR CONDITIONER Over 3-15 TON
AIR CONDITIONER Over 15-30 TON
AIR CONDITIONER Over 30-50 TON
AIR CONDITIONER Over 50 TON
GAS WATER HEATER
GAS PIPING SYSTEM(each outlet)
GAS LOG,FIREPLACE,&GAS INSERT 1
APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT
REPAIRS OR ADDITIONS
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp—100,001 to 500,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15—30 hp -500,001 to 1,000,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp—1,000,001 to 1,750,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp—over 1,750,000 BTU
AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts 1
AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm
EVAPORATIVE COOLERS(other than portables)
VENTILATION AND EXHAUST Each fan connected to a singe duct 6
VENTILATION AND EXHAUST Each ventilation system
VENTILATION AND EXHAUST Each hood served by mechanical exhaust
INCINERATORS Installation or relocation of residential
INCINERATORS Installation or relocation of commercial
APPLIANCES Range,Clothes Washer
UNLISTED APPLIANCES Under 400,000 BTU
UNLISTED APPLIANCES Over 400,000 BTU
HOOD Type I
HOOD Type II
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
WOOD STOVE SYSTEM—FREE STANDING
EXPIRES: VIN:
❑CASH ❑CHECK ❑VISA ❑MC
CARD#: SIGNATURE
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/MechanicalPermitApplication040309.doc
Pl.draft,
ermit Center
clan OFka le
11703 E Sprague Ave,Suite B-3 PERMIT NUMBER:
Y`' Spokane Valley,WA 99206
�
(509)688-0036 FAX:(509)688-0037 PERMIT FEE:
�/� ll� l` permitcenter@spokanevalley.org
Community Development
Plumbing Permit Application /� El Commercial ® Residential
SITE ADDRESS: _ e ��T/(
Building Owner
Name:LINDSEY CONSTRUCTION Phone:568-1013 Fax:
Address: City: State: Zip:
Contractor
Name:END PLUMBING Phone:981-4407 Fax:
Address:3309 N FOWLER City:MILLWOOD State:WA Zip:99206
License No: City Business Lic:
Contact/Project Manager:
Name:GREG STIRN Phone:568-1013
#OF UNITS
PLUMBING FIXTURE ON A TRAP
TOILETS 4
URINALS
TUBS 1
SHOWERS(per trap) 3
Lav/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food,
SINKS Prep/Culinary Meat 6
DISHWASHER 1
CLOTHES WASHER 1
GARBAGE DISPOSAL 1
WATER SOFTNER
FLOOR DRAIN Area,Case,Coil,Trench,Condensate
ROOF DRAIN/OVERFLOW DRAINS
FOUNTAIN,DRINKING
WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals
WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler
PRIVATE SEWAGE DISPOSAL SYSTEM
WATER HEATER If Gas,See Mechanical 1
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps
REPAIR OR ALTERATION Water piping,drainage or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers
MEDICAL GAS
INCEPTORS
OCASH 0 CHECK 0 VISA 0 MC EXPIRES:
Card# VIN:
SIGNATURE:
CURRENT FEES AVAILABLE AT:http://www.sookanevallev.ora/under the quick links for Forms,Master Fee Schedule.
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/PlumbingPennitApplication040309.doc
. • . PROPOSED PLOT PLAN FOR LINDSEY CONSTRUCTION
•
/&/ 22 /ZE. 10th Ave., Spokane Valley
LOT 1,BLOCK 2 Shelly Lake 5th Addition
SITUATE IN SPOKANE COUNTY,STATE OF WASHINGTON
SCALE 1:20 I PARCEL NUMBER
WATER PROVIDED BY VERA POWER AND WATER I SEWER PROVIDED BY COUN7Y F SPOKANE
4.---
- A
-,Z
n-,
<
in A)
F .
V
)
CI
....,
NI .
A L
/el*
RECENE0
GSA/PERMIT CENTER
PLANNING DEPT. APPROVED JUN 04 2010
Project# LCX110 k(Q-LO
I Sub mitta;#
DATE:
's-P1-11i °
For City Use Only
PLUS Project Number
S1iotj
OF Project Address
4400000 a e °
y 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
\ft\Your application review TARGET DATE is G
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
.- Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
' Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07