Loading...
2010, 08-30 Permit App: 10002671 Residence Project Number: 10002671 Inv: 1 Application Date: 8/30/2010 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: SFR W/ATT GAR Contact: LINDSEY CONSTRUCTION INC Address: PO BOX 30792 C-S-Z: SPOKANE,WA 99223-0792 Setbacks:Front Left: Right: Rear: Phone: (509)568-1013 Group Name: Project Name: Site Information: Plat Key: Name: Range District: East Parcel Number: 45243.3502 Block: Lot: SiteAddress: 16210 E 10TH LN Owner:Name: LINDSEY CONSTRUCTION INC Address: PO BOX 30792 Location::CSV SPOKANE,WA 99223-0792 Zoning: R-4 SF Res Urban District Water District: 010 VERA Hold: ❑ Area: 8,373 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review information: - '406RAMM'A--'.„ Review Building Plan Review Released By: Originally Released: 8/30/2010 By: tmelbourn Landuse/Zoning/HE Conditions Released',By: Originally Released: 8/27/2010 By: mharnois Sewer Review Released By; Permits: % y ° ' ! .Ma Operator: JD Printed By: jmm Print Date: 8/30/2010 • Project Number: 10002671 Inv: 1 Application Date: 8/30/2010 Page 2 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: LINDSEY CONSTRUCTION INC Firm: LINDSEY CONSTRUCTION INC Address: PO BOX 30792 Phone: (509)879-3420 SPOKANE,WA 99223 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB 1,446 $143,081.70 1,446 $143,081.70 2ND FLOOR R-3 VB 270 $20,036.70 270 $20,036.70 DECK OPEN R-3 VB 80 $1,200.00 80 $1,200.00 GAR WOOD U-1 VB 753 $14,307.00 753 $14,307.00 Totals: 2,549 $178,625.40 2,549 $178,625.40 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $1,436.15 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $574.46 Permit Total Fees: $2,015.11 Mechanical Permit Contractor: A J HEATING&AIR Firm: A J HEATING&AIR CONDITIONI Address: 1235 E 36TH AVE Phone: (509)838-6223 SPOKANE,WA 99203 Item Description Units Unit Desc Fee Amount GAS WATER HEATER 1 NUMBER OF $11.00 GAS APPLIANCE<=100,000BTU 1 NUMBER OF $13.00 GAS PIPING 3 #OF UNITS $3.00 HEAT PUMP OR AJC 0-3 TONS 1 NUMBER OF $13.00 VENTILATING FANS 1 DUCT 4 NUMBER OF $44.00 GAS LOG OR GAS INSERT 1 NUMBER OF $11.00 Permit Total Fees: $95.00 Operator: JD Printed By: jmm Print Date: 8/30/2010 • Project Number: 10002671 Inv: 1 Application Date: 8/30/2010 Page 3 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Plumbing Permit Contractor: END PLUMBING INC Firm: END PLUMBING INC Address: 3309 N FOWLER RD Phone: (509)328-0261 SPOKANE WA 99206 Item Description Units Unit Desc Fee Amount TOILETS/BIDETS 2 NUMBER OF $12.00 SINKS 4 NUMBER OF $24.00 SHOWERS 1 NUMBER OF $6.00 TUBS 1 NUMBER OF $6.00 DISH WASHERS 1 NUMBER OF $6.00 GARBAGE DISPOSAL 1 NUMBER OF $6.00 CLOTHES WASHER 1 NUMBER OF $6.00 MISCELLANEOUS FIXTURES 3 NUMBER OF $18.00 Permit Total Fees: $84.00 Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $2,015.11 $2,015.11 $543.10 $1,472.01. Mechanical Permit $95.00 $95.00 $0.00 $95.00 Plumbing Permit $84.00 $84.00 $0.00 $84.00 $2,194.11 $2,194.11 $543.10 $1,651.01 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jam Print Date: 8/30/2010 S �Tv (Staff Use Only) pokane PERMIT NUMBER: Valley PERMIT FEE: CITY OF SPOKANE VALLEY Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 C 0 7Co-j Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenterCtspokanevallev.orq RESIDENTIAL CONSTRUCTION PERMIT APPLICATION 0 NEW CONSTRUCTION ADDITION/REMODEL zfs' ACCESSORY BUILDING El DECK J OTHER SITE ADDRESS:16210 E 10TH PLACE,SPOKANE VALLEY,WASHINGTON ASSESSORS PARCEL NO.:56243.3502 LEGAL DESCRIPTION:L2 B2 SHELLY LAKE 5TH ADDITION ACCOURDING TO THE PLAT THEREOF RECORDED IN VOL 34 OF PLATS, PAGES 48 49&50 BUILDING OWNER NAME: NAME:LINDSEY CONSTRUCTION INC ADDRESS:PO BOX 30792 CITY:SPOKANE STATE:WASH ZIP:99223 PHONE:509-568-1013 FAx:509-443-1013 CELL: CONTACT NAME:GREG PHONE: Fax: CELL: CONTRACTOR NAME:LINDSEYCONSTRUCTION INC MAILING ADDRESS:PO BOX 30792 CITY:SPOKAN E STATE:WASH ZIP:99223 PHONE:509-568-1013 FAX:509-443-1013 CELL: CONTRACTOR LICENSE No.:LINDSCI066OW EXPIRES:8-11 CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: CONSTRUCTION OF SINGLE FAMILY RESIDENCE WITH GARAGE PROPOSED USE: RESIDENCE Effective October 28, 2007 Page 1 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.1.doc /0 - 04. 7/ ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE, Height to Peak: Dimensions: No. of tories: Total Habitable I 4'2 )1.4fg Space: / 7 / Main Floor SQ Upper Floor SQ Unfinished Basement Finished Basement FT: l 4 FT: Ztf 2,7_0 SQ FT: © SQ FT: 0 Garage SQ FT: Deck/ vered Patio Impervious Surface 30% Slopes on 7s-3 SQ FT: f'9 c,� Area: 3O0 I Property: d No. of f/ Construct' 1 Heat Source: Sewer or Bedrooms: 7 o Type: 14i-� � i'S Septic: � /�ii/ TOTAL COST OF PROJECT: $ /1-97,-- -IJ /6 5-7) 9 DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature 1 Date: Method of payment: ❑ Cash 0 Check 0 Visa 0 Mastercard Bankcard #: EXP: VIN#: Authorized Signature: Effective October 28, 2007 Page 2 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.1.doc Penmt Center aryospokane 11703E Sprague Ave,Suite B-3 PERMIT NUMBER: Spokane Valley,WA 99206 jValley (509)688-0036 FAX:(509)688-0037 PERMIT FEE: Community Development pernutcenter@spokanevalley.org Mechanical Permit Application ❑ Commercial ® Residential SITE ADDRESS: 1b2/29 //' Building Owner Name:LINDSEY CONSTRUCTION INC Phone:509-568-1013 Fax:509-443-1013 Address:PO BOX 30792 City:SPOKANE State:WASH Zip:99223 Contractor Name: Phone: ?33 /�6 .2Z;5ax: Address: / '7f S ) City: `7/� State: /tip- Zip: G)G��i 2_ License No: l pack_L' City Busmess Lic: l Contact/Project Manager: Name: Phone: #UNITS FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU 1 FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON 1 AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER 1 GAS PIPING SYSTEM(each outlet) 3 GAS LOG,FIREPLACE,&GAS INSERT 1 APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT REPAIRS OR ADDITIONS BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp—100,001 to 500,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15—30 hp -500,001 to 1,000,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp—1,000,001 to 1,750,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp—over 1,750,000 BTU AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct 4 VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range,Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM—FREE STANDING EXPIRES: VIN: OCASH ❑CHECK 0 VISA ❑MC CARD#: SIGNATURE http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/MechanicalPermitApplication040309.doc Permit Center S,,;° 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER: jYJl'l�lliC Spokane Valley,WA 99206 jValler (509)688-0036 FAX:(509)688-0037 PERMIT FEE: permitcenteraspokanevalley.org Community Development Plumbing Permit Application ❑ Commercial ® Residential SITE ADDRESS: _Id 2 M 6 /e9 Building Owner Name:LINDSEY CONSTRUCTION INC Phone:509-568-1013 Fax:509-443-1013 Address:PO BOX 30792 City:SPOKANE State:WASH Zip:99223 Contractor Name:L N Y r ONSTr. Tivic INC �i�� vim)i n i_Phone:568�iU1 Cf9 fr t iv/ Fax:449.4019' Address:PO BOX 30792 // City:SPOKANE ,( State:WASH Zip:99223 License No:LINDSCI066OW City Business Lic: Contact/Project Manager: Name:GREG Phone:568-1013 #OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS 2 URINALS TUBS 1 SHOWERS(per trap) t Lav/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food, SINKS Prep/Culinary Meat 4 DISHWASHER t CLOTHES WASHER t GARBAGE DISPOSAL t WATER SOFTNER FLOOR DRAIN Area,Case,Coil,Trench,Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN,DRINKING WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler 3 PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas,See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping,drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS OCASH 0 CHECK 0 VISA 0 MC EXPIRES: Card# VIN: SIGNATURE: CURRENT FEES AVAILABLE AT:htto://www.saokanevallev.orq/under the quick links for Forms,Master Fee Schedule. http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/PlumbingPermitApplication040309.doc Proposed Plot Plan 16210 East Tenth Lane Spokane Valley, Spokane County, Washington Lot 2, Block 2 Shelly Lake 5th Addition PARCEL#56243.35021 PUBLIC SEWER&WATER 1 SCALE 1:20 '15 fi d50 24 X X 111 v r rola 01 S.D 1 111/413r II ?‘,11/4104°°) ZLL • For City Use Only CITY poicane PLUS Project Number Project Address 410000 valley® 11703E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. I Your application review TARGET DATE is `t' ' The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. F ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after(he target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07