Loading...
2008, 06-09 Permit: 08002083 MHS# an e jVa11ey° BUILDING DIVISION 11703 E. Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Site Information Project Information Site Address: 10908 F, 10TH AVE Project Number: 08002083 Inv: 1 Issue Date: 06/09/2008 Permit Use: 26.8 X 60 2008 MARLETTE Parcel Number: 45213.9200 Subdivision: Block: Lot: Zoning: R-3 SE Res District Owner: GIBBONS, ELMER D & JERENE D Address: 29709 W FANCHER RD MEDICAL LAKE, WA 99022-9410 Building Inspector: SOUTH Water Dist: MODEL. Applicant: BARNES ENTERPRISE PO BOX 141617 SPOKANE WA 99214 Contact: BARNES ENTERPRISE PO BOX 141617 SPOKANE WA 99214 Setbacks - Front: 56 Left: 13 Group Name: Project Name: Phone: (509)921-9068 Phone: (509)921-9068 Right: 35 Rear: 34 Permits Manufactured Home Contractor: BARNES ENTERPRISES INC License 4: BARNEE1005P6 INSPECTION FEE 2 $100.00 Total Permit Fee: $100.00 FOR MANUFACTURE HOME INSPECTIONS CALL (509) 688-0054. Payment Summary Total Fees AmountPaid AmountOwin¢ Tran Date Rech Payment Amt $100.00 $100.00 $0.00 06/09/2008 14404 $100.00 Processed By: DAVIS, JENNA PERMIT Printed By: PAI RICIA PRINCE Page I of 1 NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING -when forms and reinforcement are In place and prior to placement of concrete all structures, including manufactured homes. NOTE: This inspection Includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence Imes are not necessarily Indicative of property lines. The responsibility to comply with applicable setback provisions Iles solely with the pernittee-neither the City of Spokane Valley nor Its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner'sT erruntee's expense. FOUNDATION - when forms and reinforcement are In place and prior to placement of concrete. PLUMBING - after rough in, before covering, and final. MECHANICAL - rough -in of piping, before Covering, metal chimneys before concealment, and final. FRAMING -after all framing. braang and blocking Is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and/or use. All permits require final inspection. NOTE'. In addition to inspection of the structure, this inspection Includes review of site Improvements (typically depicted on the approved site plan) required by ordinance or as a Condition of approval of this permit. Items such as the Installation of fire hydrants. fire department access, on-site drainage ('208'swales), road improvements, parking and landscaping are common requirements of a pennithate plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - Final inspect on required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy: completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to Cover. RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, eta must be inspected prior to cover. Check with the Building department for `special Inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and Road was for utilities or driveways. City of Spokane Valley mechanical, City of Spokane Valley Building Division 688-0054 Public Works 688-0195 or State Dept of Transportation 324-6000 Ferris and meor.1d,m,ell wnng. Sete Devanmon or talo,and ronew—tw riewer connean- spotane Colub6m¢s C,vrn All Incl z21 Gran 17 - a and lnaldium nor .1 YI. bell, systen¢, s,Arrle ablanar Fire sal dr and alarm sccess ystems and pnral, aroad nadbUrne. Spokane vauey Hoefs tDismct 324-+5W n e dwel ent $92.4122 stats taw acw t3II2 rtpwms Inst p Ydrb any vramuon me CALL BEFORE YOU DIGbroke, nus be nodned Cart bemre you dig .11 ... I z on, days a ad,rnrb. 1111rao PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void If a) work Is not started within 180 days of obtaining a permit, or b) work Is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit Issuance, regardless of whether the were Is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original committee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee maybe authorized when no work has been done under the permit issued- Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner/Agent ��avn�. L Z: - Date t-, -6-C) Staff Approval Date