Loading...
2008, 06-09 Permit App: 08002083 MHProject Number: 08002083 Inv: I Application Date: 6/5/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 26.8 X 60 2008 MARLETTE Contact: BARNES ENTERPRISE Address: PO BOX 141617 C -S -Z: SPOKANE WA 99214 Setbacks: Front 56 Left: 13 Right: 35 Rear: 34 Phone: (509)921-9068 Group Name: Site Information: Project Name: m Plat Key: 999999 Name: Range District: Sent Parcel Number: 45213.9200 Block: Lot: SiteAddress: 10908E 10TH AVE Owner: Name: GIBBONS, ELMER D & JERENE D Address: 29709 W FANCHERRD LocationCSV MEDICAL LAKE, WA 99022-9410 Zoning: R-3 SF Res District Water District: 007 MODEL Hold: ❑ Area: .20 Acres Width: 75 Depth: 135 Right Of Way (it): 0 Nbrof Bldgs: 1 NbrofDwellings: 1 Review Information: Review Building Plan Review Released By: SET PER MANUFACTURED SPECS Originally Released: 6/5/2008 By: JLMain Landuse/Zoning/HE Conditions Released B Originally Released: 6/5/2008 By: tschmidt Permits: ------- Manufactured Home Contractor: BARNES ENTERPRISES INC Firm: BARNES ENTERPRISES INC Address: PO BOX 141617 Phone: (509) 921-9068 SPOKANE WA 99214 Item Descrintron Units Unit Desc Fee Amount INSPECTION FEE 2 # SECTIONS $100.00 Permit Total Fees: $100.00 Operator: JD Printed By: jmm Print Date: 6/5/2008 Project Nmnber: 08002083 Inv: 1 Application Date: 6/5/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Notes:__—, Payment Summary .__�'' ,T, .'' ._> ­ Perntit Twe Fee Amount Invoice Amount Amount Paid Amount Owing Manufactured Home $100.00 $100.00 $0.00 $100.00 $100.00 $100.00 $0.00 $100.00 Disclaimer: Submittal of this application certifies the owner (or persons) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that ail provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Operator: JD Printed By: jmm Prant Date: 6/5/2008 Site Address: 10908 E 10TH AVE Parcel Number: 45213.9200 ���/ n Zoning: �- Fire District: Applicant: BARNES ENTERPRISE PO BOX 141617 SPOKANE WA 99214 (509)921-9068 e-mail: Contact: BARNES ENTERPRISE PO BOX 141617 SPOKANE WA 99214 (509)921-9068 e-mail: Project Transmittal City of Spokane Vallee Commutvty Development Department 11703 E- Sprague Ave, Suite B3 Spokane l'allev, �%' 1 99206 Phone: 509.6880036 Water District: Contractor: BARNES ENTERPRISES INC PO BOX 141617 SPOKANE WA 99214 (509)921-9068 Project 2R 8 X 60 2008 MARLETTE �, Newproiecr/El Pu,wuuspre-nppmeei,9 ❑ Pian revm .. Transmittal Date: Tuesday, June 03, 2008 Project Number: 08002083 Owner: GIBBONS, ELMER D & JERENE D 29709 W FANCHER RD MEDICAL LAKE, WA 99022-9410 e-mail: Occupant: e-mail: Arch / Engineer: e-mail: Please send all plan review and project comments via e-mail to the highlighted individuals. on Permit Center .'l i7„ane 11703 E Sprague Ave, Suite B-3 �Jj1V11L111 Spokane Valley, WA 99206 jva11e3 (509)688-0036 FAX: (509)688-0037 p k S I I •, a Community Development Manufactured Home Permit Application ❑OTHER SITEADDRESS: I09cJ C• Ick /rvL ASSFSSOR S PARCEL. NO: LEGAL DESCRIPTION: PERMIT NUMBER: PERMIT FEE: Building Owner: Contractor: Name: 3I t'i C i t. Name: BA.((n L5 �M1 i. S'r+ C. Address: DC7 f a ✓ ✓a c. Address: City: S cl'c1nt ✓nil State:lNA Zrp.o Ctty. 5&Ktr V/ State: L..,q. Z'P 11941y Phone: ci3 3 Fax: Phone: 9L/-9048 Fax. Contractpr cNsoSoof Pb Exp Date: Contact Person City Business Lic. No: Name: SO 14 -j I? Al2, S Phone: 9 2/- 90 4 Describe the scope of work in detail: RGPIA-CC EX%}+xg 5:nDje tvv Dt 4,ltti ri,- Do✓Bl� MANUFACTURED HOME Width: 2 , jv Length: (pU Year: NL Pit Set ?<5 Septic/ ewer: Manufacture: fA k0le-1-44, Previous Address: Proposed Use: The permitee verifies, acknowledges and agrees by their signature that: t) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit more to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. Signature Date 6 - 5_ e F Method of Payment ❑ Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard#: Expires: VIN#: Authorized Signature: sr asro aanoos For City Use Only PLUS Project Numbe>��•Qb� > Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permittentera spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. This for a Smoother Protect Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can lookW your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice jar the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical stats for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK -BUILDING FILE N f.m pouDle w �- 13� -1 Fo8E; lot, 3y �0 ¢ a,We Elk„ ci'h3scw.�r�wn,.a !r , a 9 r Cve why 5(9 7S' l0 t �41,Z L PI f1L n; o cS � Z z \� w ~' a a m v