2012, 04-09 Permit: SW-12001092 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
yok
Application Number: SW -12001092
Permit Issued Date:
04/09/2012
Expiration Date:
Project Description:
Permit Type:
SEWER CONNECTION
SEWER
Primary Contact: NW EXCAVATORS INC
Applicant: NW EXCAVATORS INC
Address:
Phone:
Email:
7923 N WILDING DR
SPOAKNE, WA 99208
509-466-7574
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
16421 E 10TH LN
45244.3411
Shelley Lake 5th Add
SHELLEY LAKE 5TH ADDITION (AFN 5605530) LT
11 BLK 1
Water District: Vera
Irrigation District #15
Owner:
SHELLEY LK RES DEV/SHELLEY LK HO
Address: 8225 N DIVISION
SPOKANE, WA 99208
Phone:
Email:
Fire District: Fire District 1
Land Area: 0.2289 acres / 9973 sqft
CONTRACTOR INFORMATION:
General Contractor
NORTHEL935BK
NORTHWEST EXCAVATING
1169 BUTTE AVE
ATHOL, ID 83801
208-691-1578
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 04/09/2012 12:14:38
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
N. Permit Issued Date:
Application Number: SW-12001092 04/09/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:04/09/2012 12:14:38 Printed by:IIS APPPOOL\ASP.NET v4.0