Loading...
2015, 04-24 Permit: SW-15000368 Sewer SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-15000368 Permit Issued Date: 04/24/2015 Expiration Date: 04/24/2016 Project Description: SEWER Project Name: SHELLEY LAKE, LOT 40 BLOCK 2 Primary Contact: HATTENBURG EXCAVATING INC Applicant: HATTENBURG EXCAVATING INC Phone: 509-238-4454 Address: PO BOX 248 MEAD,WA 99021 Phone: 509-238-4454 Email: SITE INFORMATION: Site Address: 16607 E 10TH LN Owner: SHELLEY LK RES DEV/SHELLEY LK HO Parcel Number: 45244.3540 Address: 8225 N DIVISION SPOKANE,WA 99208 Phone: Assessor's Description: SHELLEY LAKE 5TH ADDITION(AFN 5605530)LT Email: 40 BLK 2 Inspection Area: :(509)-477-3675 Water District:Vera Irrigation District#15 Fire District:Spokane Valley Fire Zoning: Land Area: 16186 Square Feet CONTRACTOR INFORMATION: HATTEEI980JT, Exp.08/18/2016 HATTENBURG EXCAVATING INC PO BOX 248 MEAD,WA 99021 509-238-4454 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $27.12 Utilities Permit $125.00 Total Fee: $152.12 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed:04/24/2015 09:37:50 Project Coordinator:Susan Clark SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-15000368 Permit Issued Date: 04/24/2015 Expiration Date: 04/24/2016 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _ SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _ THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:04/24/2015 09:37:50 Project Coordinator:Susan Clark