2000, 09-12 Permit: 00008136 DeckJNTY DIVISION OF BUILDING AND CODE El
1026 WEST BROADWAY AVENUE a SPOKANE[ WA 99260-0050
(509) 477-3675
.NTLI Processed By: FRAZIER, CAROL
Printed By: CLTNOMGS, KATHY
Tran Date RePayment Amt
9/12/00 7657 $9661
Total Fees AmountPaid Amnunt0wine
$96.61 $96.61 $000
SITE INFORMATION
PROJECT INFORMATION J
Site Address:
11020 E10THAVE
Project Number: 00008136 Inv: 1
Issue Datc 9/12/00
SPOKANE,WA 99206
PermitUse: COVERED DECK
Parcel Number:
45213 9234
Building Permit
Subdivision:
PIERCE ADD
Applicant GOODNER, THOMAS L
COV DECK
Block:
4d:
$75.50
11020 E 10THAVE
STATE SURCHARGE
54.50
SPOKANE, WA 99206
Phone: (509)924-9094
Zoning:
UR -5
$16.61
Sq It:
270
THOMAS L
Contact GO20
Type: VN
Owner:
GOODNER, THOMAS L
$96.61
11020E 10TH A VE
E 10
Address:
11020E 10TH AVE
SPOKANE, WA 99206
Phone (509) 924-9094
SPOKANE, WA 99206
Setbacks - Fran[ 49 Left: 53 Right
NA Rear. 30+
Inspector:
DAN HOWARD
Watcr Dist.
.NTLI Processed By: FRAZIER, CAROL
Printed By: CLTNOMGS, KATHY
Tran Date RePayment Amt
9/12/00 7657 $9661
Total Fees AmountPaid Amnunt0wine
$96.61 $96.61 $000
Group Name:
Project Name-
PERMIT(S)
Building Permit
Cont -Mr: OWNER
_ Lirenwh: OWNER
New Building
COV DECK
R-3 VN 270
RESIDENTIALVALIIATION
$75.50
STATE SURCHARGE
54.50
Dim:
X 1 StoryTofal Value:
$2,55430
RESIDENTIAL SURCHARGE
$16.61
Sq It:
270
Grp: R-3
Type: VN
Total Permit F—
$96.61
.NTLI Processed By: FRAZIER, CAROL
Printed By: CLTNOMGS, KATHY
Tran Date RePayment Amt
9/12/00 7657 $9661
Total Fees AmountPaid Amnunt0wine
$96.61 $96.61 $000
r
NOTICE
It is the responsibility of the applica bpermittee, not Spokane County, to see to it that the use describetl on the front of Nis permit complies with
applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary
approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain pans of the construction at the
applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Cotle:
1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations. Typically side and rear yard setbacks are measured from property lines, while setbacks for yards abutting Streets are measured from
the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway righbof-
way, Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of
right-of-way between your property and the actual improved street/curs The responsibility to comply with applicable Setback provisions lies Solely
with the permittee—heither Spokane County nor its authorizetl representatives assume any responsibility for the verification or location of your
property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the
owners/perminee's expense.
2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after rough -in, before covering, and final.
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final.
T FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final Inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-sfte
drainage ("208 swales"), road Improvements, parking, and landscaping are common requirements of a permit/site plan which must be com-
pleted prior to final approval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc, installed, and prior to occupancy; complemol
inspection record card must be available on site.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be
inspected prior to cover. Check with the department far 'special inspections" in conjunction with commercial projects.
CALL 477-3675 FOR INSPECTIONS.
TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE.
YOURINSPECTORIS
UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES;
• Road cuts for utilities or driveways, Division of Engineering & Roads
• Sewer connection, Division of Utilities
477-3600
477-3604
or State Department of Transportation
or City Public Works Department
456-3000
625-6300
• On-site waste disposal system, Spokane Regional Health District
• Electrical wiring, State Department of Labor and Industries
324-1560
324-2640
• Construction in a most plain. Division of Engineering & Roads
4T1-3600
PERMIT EXPIRATION ANO REFUND%
Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped
for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At
a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one
year of the data of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions.
All refund requests must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days after the data of fee payment.
Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized
more than 180 days after fee payment.
M15TAKE7
If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit,
please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be
directed to the Division of Building and Code Enforcement at the address found on the face of this permit.
I certify that I am the owner or am authorized by the owner to make this application and that I have examined this permiVapplication, state that the
information contained in it and submitted by me or my agent to compile said permit/application is true and correct, and authorize Spokane County
to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and
agree to comply with same. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not.
I understand that the issuance of this permitiapplication and any subsequent inspection approvals or Certificates of Occupancy shall not be
construed to give authority to violate or cancel the provisions of any state or local law regulating construction or agreement concerning this
Property, or as a warranty of conformance with the provisions of any state or local laws regulating construction.
SIGNATURE OF
APPLICANT/PERMITTEE APPLICATION
08 AUTHORIZED AGENT. _0 DATE