2008, 05-05 Permit App: 08003293 Garage Permit Center
11703 E Sprague Ave,Suite B-3 PERMIT NUMBER:
►�pOl11e Spokane Valley,WA 99206PERMIT FEE:
400.VdlleY (509)688-0036 FAX:(509)688-0037
www.spokanevalley.org
Community Development
Residential Construction )4' New Construction Accessory Bldg
Permit Application Addition/Remodel Deck
Other:
SITE ADDRESS: pp
ASSESSORS PARCEL NO: 3, at 9 3 ON LEGAL DESCRIPTION:
Building Owner: h ,5 " j,/ # Contractor: 19wee/ D
Name: Name: ( Op/� /"l�f1`YY)CLYI 0,41()e
Address: 5 fe f /1/s Address: �� /1 �'G7/7 v� /f
City: _ fie CPO: Zip:99213 City: /�� State: j� , Zip:J 7 /�
J c��ax dd�� Phone: Jf-Jpu2 47 i] Fax:
Phone: jr, v f 37 2— / r
/ Contractor Lic No: ' Exp Date:
Contact Person City Business Lic.No:
Name: ()Q/'l J -7W.g/le te
Phone: (Si'9/ 5-3'2 -- 97 '/
Describe the scope of work in detail: Cost of Project: $ Q pry &1 °
Proposed Use:
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: DIMENSIONS: #OF STORIES TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ. 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTC: /0/2 /0 p( AREA:
FINISHED BASEMENT GARAGE Q. FTG: DECWCOV. PATIO0SQ. FTG: 30% SLOPES ON
SQ. FTG: 0 PROPERTY:
#OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: ��,77 SEWER OR SEPTIC?
je.✓c'e,'
The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws,codes or ordinances.6) Plans or additional information ////)
may be required to be submitted, and subsequently approved before
this application can be processed. cS/t�0
, P716#1alifi
/SIGNATURE: �� 9' DATE:
Method of Payment:
❑ Cash ❑ Check ❑ Mastercard ❑ VISA
Bankcard#: Expires: VIN#:
Authorized Signature:
REVISED 2/15/07
New projec
Previous pre-app meeting ID
sipThaTb' Project ne Transmittal Plan revisions
City of Spokane Valley Transmittal Date:
.0,0017alley
Community*Development Friday,August 22,2008
Department
11703 E. Sprague Ave,Suite B3
Spokane Valley,WA 99206
Phone:509.688.0036
Site Address: 0 E 11th AVE Project Number: 08003293
Parcel Number: 35243.0881
Zoning: R-3 Water District: SPO CO WATER DIST#3A
Fire District: FD 01
Applicant: ROMANCHUK, BORIS & ANNA Owner: ROMANCHUK, BORIS &ANNA
5918 E 11TH AVE 5918 E 11TH AVE
SPOKANE, WA 99212-0224 SPOKANE, WA 992 -0224
(509) 532-9294
e-mail: e-mail:
Contact: ROMANCHUK, BORIS &ANNA Occupant:
5918 E 11TH AVE
e-mail:
SPOKANE, WA 99212-0224
(509) 532-9294
e-mail:
Contractor: OWNER Arch/Engineer:
( ) - 0
e-mail:
Project SFR W/ATT GAR
Description:
Building Landuse Engineer Utilities Health Fire Dist Assessor
APPLICATION
SITE PLAN
PLANS
Please send all plan review and project comments via e-mail to the
highlighted individuals.
/60 '
PLANNING DEPT. APPROVED
(Cia,41 L�
DATE: 80-?-)10g
req'
CZJ
fikSe 083:/
. ti r
-
s.m.nnn,4•141/1.0 LESS THAN 2 RISERS DO NOT REQUIRE A HAND RAIL
--- .
r 34"MIN.HEIGHT GUARDRAILS SHALL EE PROMDEDFOR AT PORCHES,DECKS.BALCONIES STAIRWAYS AND LANDINGS WHERE SAFETY GLAZING SHALL BE PI
THE ADJACENT SURFACE IS GREATER THAN 24'8ELOW.
WHIRLPOOLS,SAUNAS,STEAL
RAILING AND GUARDRAIL BALUSTER SPACING SHALL BE NOGREATER TWIN 4'.
THE TRIANGULAR OPENINGS FORMED BY HE RISER./READ AND BOTTOM OF GUARDRAIL SHALL NOT ALLOW A6 MSA ALL EXTERIOR DOORS AND W
SPHERE TO PASS THROUGH
COATINGS AND WEATHERSTR
32'-5 1/2"
52'-0"
22'-0" 4 1/16"� > 11'-11" 5'-4 1/2"
,2,'-4 1/21I
>1` 9'-7 15/16" 20'-0' 1'-5 11/16"
-c--5'-1 5/16" >,..c4'-0" >}< 4'-11" 5'-10"
2'-1 11/1 4 4 8 5/16' _3,-0" >2' 11 5/8'
- —5'-5 5/16" >< 5'-0" >{ >
17\ 5060
T f 1!
T �, \ d
io wAd 1 \ D
cii M co
\ OFFICE Left J De
4040CE
51040 in
\ 134 sq ft
30'IIII r w \ 11C,°\
4 p q I I��,i _ o \ BATH
o
sii 0 'i' I1 r 48 sq ft
C
I IN R ,-- \ e , re,
— /rsiNty 01 --0,5 ii
, / \ =amass -- ��
MUM
1 .—aTa; 1111
1 T ( _6.,�= "== T DININGHALL
•
9'-8"x 11'-2,. I I it I , n rn \ El
119 sq ft O
KITCHENS1 PO ,. I I o �� `\ �f /
11'i"x 12'2" _ ( \%2s-\/ , 2668 / g N N� i I \ \ %/
A
Cdr a m / , _N o a OPEN BELOW nim \\ /�
\ \ N 2668 co
aMill R/ J T F— 51 sIq ft \ %/
/
\ 3 in
$
�;�'— —��� — ' r w CEILING H 8'
1 ' 1 11011 /
:- fisPr T-- I 0.,v - -
4 BATH I i co 411
SD /
o s s xs I ' d °' BEDROOM %/ b •
o —Lo —
' ;0 �.�n 1 I l 158 sq ft /%� —ss \J\[ \ fl' 1 I �\
•
7 ' I
LIVING I —— — —1
172"x18'6" I _ _ - - - -- -- - - --- - Y T
— 330 UI.
ENTRY ' 16070 /A N `� 6d
---- I T-8"x 154-5-;----, En
e K',._ fl
\ i \
in
ED- ' ` l i "P I / —:' 1
- 1_7to G
I. I I l / \/d I
CEILING H 9' �`' ' J / 5060
cv
I
' 93 1
E4' 1 3/16"3I< 5'-01I .'-9 13/1;"
,� _.14)
��� ,� °° .;� `gip >vc; 6•Ix61I post � �3' 11
8066 I j Iii ,,��� �1, \\
1 1 1 I K 11'-11" LIVING AREA >Ir
1 I II I ' I / 987 sq ft
5'-1 3/4" >�< I `bDECK/ I I i<
32'S 1/2"
8'-0" = 6'-5 1/4" >� \K-3" 1' 5 1/ " 31 e ' ,)4" 2'-0 3/4"
I 15'-o°x >�<3 /1 SECOND FLOOR
16 0
19'-7" 6'-6 7/16" >1< ,-6 /2" >-<
,F---- 20'-4 1/16"
52' ' ' .r SCALE 3/16"=1'
OWNER & BUILDE
THESE PLANS SHAL1 Nn-r-RP I Icon ono rr-NAlorol 1,..,-
For City Use Only
PLUS Project Number ,
CITYSôip
Pe (
4000
a
V11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
i
Your application review TARGET DATE is
r t
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07