2003, 04-17 Permit: 03002586 SewerSPOKANE COUNTY DIVISION OF BUILDING
AND CODE ENFORCEMENT
� 1026 WEST BROADWAY AvENuE • SPOKANE, WA 99260-0050
fNNEUNI\rl
Site Information Project Information
Site Ad&ess:
11116E IOTH AVE
SPOKANE, WA 99206
Parcel Number:
45213 0804
Subdivision:
AmountPaid
Black:
Let:
Zoning:
UNK Unknown
Owner:
WRIGHT, WAYNE
Address:
11116 E I OTH AVE
2433
SPOKANE WA 99206
Building Inspector:
DAN HOWARD
Water Dist
Project Number: 03002586 Inv: 1 Issue Date: 4/172003
Permit Use: SEWER CONNECTION -APPLE VALLEY
Applicant: II & S CONSTRUCIION
17817E VALLEYWAYAVE
SPOKANE WA 99206
Contact: I I & S CONSTRUCTION
11817 E. VALLEYWAY AVE
SPOKANE WA 99206
Setback, -Front: Left: Right:
Croup Name:
Project Name:
Phone: (509) 926-8964
Phone: (509) 926-8964
Be..:
Permits
Server Connection Permit Contractor: 115SCONS'TRUCFION Licensed: HSCON 1[23KP
SEWER CONNECTION I 585.00 PROCESSINGPEE 515.00
GAid Permit Fee $10000
FOR SEWER INSPECTIONS CALL (509) 477-3604 UTILITIES 8:30-5:00 PM MONDAY FEEL FRIDAY
Call for inspection prior to cover_ ONE WORKING DAY NOTICE REQUIRED_
Contractor or applicant is to field locate and canfirm the elevation and position ofsewer stab prior to any other exmvalion_
Sewer stubs ere to be checked prior to connection to ensure that they have acceptable gredc and are altar end unobstructed to the main 1,111.
Sewer Tines should be constructed to allow for gravity flow from the lowest level of the sbrame,
This permit must be presented to the job site inspector for verification, to locate buried cables, gas piping water lints, are
CALL BEFORE YOU DIG, (509)456-8000.
STAT F LAW RCW 19-122 REQUIRES THAI PRIOR TO ANY EXCAVATION THE "CALL BEFORE YOU DIG" CENTER BE
NO'I'IFIEO CALL BEFORE YOU DIG AT LEAST 2 WORKING DAYS IN ADVANCE, (509)456-8000.
Spokane County Code requires the installer comply with all requirements ofthe Washington State Dept of Labor and Industries, including
Processed By: SHATTO, JULIE PERMIT
Printed By: WENDEL, GLORIA Page I of 1
Payment Summary
Total Fees
AmountPaid
Amount0mine
From Date
Receipt
Pavmen[ Amt
$100.00
S100.00
$000
4/17/2003
2433
S100.00
Processed By: SHATTO, JULIE PERMIT
Printed By: WENDEL, GLORIA Page I of 1
NOTICE
It Is the responsibility of the appllcanr/permlttee, not Spokane County, to see to it that the use described on the front of this permit complies with
applicable codes and requirements and that required inspections are requested- Failure to request required Inspections and obtain the necessary
approvals prior to progressing beyond the point where Inspections are required may necessitate removal of certain parts of the construction at the
applicant 's/permiftee's or property owners expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1- FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes.
NOTE: This inspection Includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway right of-way, whichever provides the greater setback from the center line of the roadway bell
way
el lway. Curb lines and feces lines are not necessarily indicative of property Imes. In acme residential areas. the County can own as much as 20 feet of
right-of-way between your property and the actual improved streeVeurb. The responsibility to comply with applicable setback provisions ties solely
with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
property Imes. Please verify their location poor to locating your structure- Failure to properly locate the structure may require Its relocation at the
ownersrpermittee'a expense.
2. FOUNDATION when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking Is In place, and prior to concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING after rough in, before covering, and final.
6. MECHANICAL - rough in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection.
NOTE: In addition to Inspection of the structure, this inspection Includes review of site improvements (ypioally depicted on the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site
drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permo site plan which must be com-
pleted prior to final approval of a building or issuance of a Carbonate of Occupancy.
8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy. completed
Inspection record card must be available on site.
9. SEWERS - prior to cover
10- RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems m material which would be concealed by framing, drywall, concrete, etc., must be inspected
prior to cover. Check with the department for "special inspections' in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and fire inspections, Division • Road cuts for utilities or driveways. Division of Engineering &
of Building and Code Enforcement Roads - 4E -HOUR NOTICE REQUIRED
477-3675 477-3600
or State Department of Transportation
• Construction In a flood plain, Division of Engineering & Roads 466-3000
477-3600
• Sewer connection, Division of Utilities
• Electrical wiring, State Department of Labor and Industries 477-3604
324-2640 or City Public Works Department
625-6300
• On-site waste disposal system, Spokane Regional Health District
3241560
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for
a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a
minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year
of the date of expiration for one half the original fee, subject to certain I l m ltations—pl ease call us If you have any questions.
All refund requests must be made in writing by the applicar-Upermittee (shown on the reverse) no later than 180 days after the data of fee payment.
Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized
more than 180 days after fee payment.
MISTAKE?
If you think we've made an error In processing this permit or In conducting Inspections pertaining to It, or find erroneous Information In the permit, please
bring it to our attention Immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to
the Division of Building and Code Enforcement at the below address.
Spokane County Division of Building & Code Enforcement
1026 West Broadway Avenue
Spokane, WA 99260
Phone. (509) 477-9675 Ear: (509) 4774703 TDD: (509) 477-7133