Loading...
2015, 04-09 Permit: SW-15000310 Sewer SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-15000310 Permit Issued Date: 04/09/2015 Expiration Date: 04/09/2016 Project Description: SEWER Project Name: WOODLAWN/BEVERLY HILLS Primary Contact: GOBER'S LLC Applicant: GOBER'S LLC Phone: 509-924-5372 Address: 11215 E TRENT AVE SPOKANE,WA 99206 Phone: 509-924-5372 Email: SITE INFORMATION: Site Address: 6323 E 11TH AVE Owner: VIOLETT,CYNTHIA M Parcel Number: 35243.0460 Address: 6323 E 11TH AVE SPOKANE,WA 99212-0123 Phone: Assessor's Description: SPARKS ADD E4OFT OF L12 B6&W1/2 DRYER Email: RD ADJ L12&EXT N TO C/L OF ALLEY Inspection Area: : (509)-477-3675 Water District: East Spokane Water District Fire District: Spokane Valley Fire #1 Zoning: Land Area:9107.05 Square Feet CONTRACTOR INFORMATION: GOBERL*899L7, Exp. 06/27/2015 GOBER'S LLC 11215 E TRENT AVE SPOKANE,WA 99206 509-924-5372 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $27.12 Utilities Permit $125.00 Total Fee: $152.12 CONDITIONS: Possible FEMA Flood Zone Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Public Transit Benefit Area Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:04/09/2015 11:52:10 Project Coordinator:Susan Clark SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-15000310 Permit Issued Date: 04/09/2015 Expiration Date: 04/09/2016 SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:04/09/2015 11:52:10 Project Coordinator:Susan Clark