Loading...
1995, 12-08 Permit: 95010207 AdditionSPOKANE COUNTY DEPARTMENT OF BUILDINGS WEST 1026 BROADWAY R SPOKANE, WA 99260-0050 (509)456-3675 SITE ==ESS: 11218 E 10TH AVE SPOKANE MA 99206 PARCEL WHINER: 45213.9011 SUBDIVISION: APPLE VALLEY ADO. LOT: BLOCK: ZONE: MIR 3.5 INSPECTOR: FRANK PALADICHUK MATER DIST: O.YNER: THOPSON, KATHERINE PHONE: 509 924 6892 ADDRESS: 11218 E 10TH AVE SPOKAME MA 99206 EN 01UC IION PROJECT NUMBER: 95010207 ISSUE DATE: 12/08/95 PERMIT USE: FAMILY ROOM ADOITOI B READJUST DRAIN LINE TO DRYW APPLICANT: CAPSTONE CONSTRUCTIO PHONE: 509 01 9485 ADDRESS: FOR 338 NINE MILE FALLS MA 99026 CONTACT: JAKE - CAPSTONE CONS PHONE: 509 982 9485 SETBACKS -> FRONT: NA LEFT: 10 RIGHT: 10 REAR: 70 LENDER NAME: PHWE: ADDRESS: YL'RM II J) UttMN,rPRRMT7- CONTRACTOR CONTRACTOR CONTRACTOR CAPSTONE CONSTRUCTION K T U OF SPOANE K T U OF SPOANE LICENSE Y: CAPSTCC106J5 LICENSE B: KTUVI-153M LICENSE B: KTUSPI.153MA BUILDING ADDITION RANGE I DISH MASHERS 1 DIN, 12 N 14 1 STORIES CLOTHES DRYER 1 CLOTHES MASHER 1 S9 FT . 168 WS PIPING 2 NATER PIPING - DW 1 DUCT SYSTEMS I RES ADD R-3 VN 168 VENTILATING FANS I TOTAL PERMIT FEE $18.00 TOTAL VALUE: $9,744.00 TOTAL PERMIT FEE $42.00 RESIDENTIAL VALMATION 117.00 STATE SURCHARGE 4.50 RESIDENTIAL SURCHARGE 24.57 TOTAL PEN IT FEE $146.07 PAYMENT SUMMARY NorEs PAYMENT DATE RECEIPT# PAYMENT AMKNMT .................. 12/08/95 00012009 5206.07 TOTAL FEES AMDINNT PAID AMOINT WING -------------------------------------- $206.07 $206.07 $.00 ISSUED PERMIT BY: JOHN LARSON NOTICE It is the responsibility of the permittee, not Spokane County, to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal at certain parts of the construction at the ownei s/permittee's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete. NOTE: This Inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards patching streets are measured from the property line or the center line of the roadway right -of way, whichever provides the greater setback from the center line of the roadway right -ol-way . Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permit—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require Its relocation at the owner's/permlttee's expense - 2. FOUNDATION when forms and reinforcement are in place and prior to placement of concrete. (Blocking for a manufactured home is required to be inspected prior to the Installation of skirting) 3. FRAMING - after all framing, bracing and blocking Is in place, and prior to concealing 4, INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough in, before covering, and final. 6. MECHANICAL rough in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 ewales'), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. In addition to the above any plumbing or mechanical systems or materials which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections' in conjunction with commercial projects. CALL 456-3675 FOR INSPECTIONS. TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE. YOUR INSPECTOR IS UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES: • Road cuts for utilities or drives, County Engineer's Office 456-3600 or State Department of Transportation 4563000 • Ortsite waste disposal system, Spokane County Health District 3241560 • Construction in a flood plain, County Engineer's Office 456-3600 • Sewer connection, County Utilities Department 4563604 or City Public Works Department 6256300 • Electrical wiring, State Department of tabor and Industries 3242640 EXPIRATION Unless otherwise noted, this permit will be considered null and void by limitation of the work authorized by the permit if not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit, A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions. MISTAKES? If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Buildings at the address found on the face of this permit. I certify that I have examined this permit/application, state that the Information contained in it and submitted by me or my agent to compile said permit/application is true and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and agree to comply with same. All provisions of laws and ordinances governing this type of work will be compliedwith whether specified herein or not. I understand that the issuance of this permit/ application and any subsequent inspection approvals or Certificates of Occupancy shall not be construed to give authority to violate or cancel the provisions of any state or local law regulating construction, or as a warranty of conformance with the provisions of any state or local laws regulating construction. pIWNERUOR AOGENT G - E� RE DA?EICATION��