Argonne N 1225 Denny Christenson
~
,
"I't Pff 10, ` .'3,;r a 1 D
~
COUNTY ENGEh1FER
Ar
Ra E3ERT S T'URIV ER
- ` ~ ~ ~e" ~
x C4Ut++1TY ENGMNEER
• . ' 'T~ ~.7s'M~i►7~ ~1'lOXK1-4~ViiIa1 9926D
~P~brah~ C94eAFY eL,°IiW" N9tF.rs[
-D ~VAI r lq~e l Sl- EAI(5 oA
E S75-
-S to e° ~ ~ ~g W'j, qqa! s,
/1I 127.s
Gentiemen:
A review af Che road, drairtage, and parking plans for the above-refer-
enced plat, shorx plat, binding site plaa, and/as building perinit has been
accomplished. Areas of concera to us are indi.cated in red on the attached
prin.ts. Please make the corrections and tesubmit them ta this afffce in qrder
that the review process map proceed. When the plaus are resubmitted, maric a2l
changes on the revised print in calor.
If you have aay questions abaut this revfew, piease cantact us at
I 4Sb-3b00.
Thank you.
SiACL'I'@1.yi
Robert S. 1urner, F. E.
Spokane County Engtneer
y S. elsnn, P. E.
Planning Eagineer
GSN/set
Attachmenf
5/30/4
Public UVorks Buitding North 811 Jefferson Street Spokane, Washing#on 99260 (509) 456-3600
~
W 14ame peu~~ &r2.t~Zel~jd~ Busliiess Name L-~jA% .T~►~~
.C~ ~ ~ Acl d res s
_ qw - Zk-W Plione
.,ous*y Otintact Person Phnne No. 456-3600 Date
:~;aa pRw;aug RCI~~B>U~ DI~G~tE~~ kEVIEW
~a
~ This butlding pecrnit review is intec►ded to appraise you of t1ie improvemente (roadways side-
walk, curb. stormWater, etc.) ahieti must be constructed in associatton witil your buiiding
permit. Thie checklist will be ftlled out by ttte EnbineNr's staff and a copy aill be re-
turned to you at the time tliat tlte permit is inittaled by the Eubineertng Department. All ,
requlcemen[s ehall be completed pctor to issuatice of the butldlttg pecmtt. All unc}lecked
boxes requite additional ceeeacch or information to make a determination.
1. Stotmwater i)cnin,l e Considerations
A. Per gulceor 'Stormaater Management 1981" both on and of E eite.
10 208 Consldecatlons* ~Ye a Li No
2. Flood hazard zone coneiderations** I Yes ~No
36 Storm Dra[nage Plan W,-~Yes Li No
II. Planning Action ll
1. Piat, short plat, rezone, Conditional Use or Variance ~ Yes a No
on property. Planaing Number
2. Are requiremente of planning action incorporaCed Li Yes ~ No
into eite plan
III. Right of Way
l. Does permit neceasitate R.O.W. dedication Li Yes a No
2. Did zone change require R.O.W. dedicetion Li Yes a No
3. Radiue at corner Li Yes a N°
IV. County Road Impcovements
1. Roads need to be improved. Now wide a Yes ~ No
2. Curb Li Yes Li ho
3. CRP/RID agreement (Cory of deed, contract. or Li Yes Li No
[itle report requiced.)
4. Plac►e f or improvecnente provided Li Yes Li No
5. - Sidewalk ~ Yes Li No
Y. Packing Plen b Approach Location 1. Review and sign off by Traffic ti Yes Li No
2. Approach Permit from Engineer's Office Li Yea Li No
3. State ot Ci ty slgn of f Li Yes Li No ~
4. Is this road on b Year Plan Li Yeg Li NO '
VI. Ui.ID Afreement:
Li Ye a L No VII. Field Review: Preliaiinary Comroente .
~ A11 18nd vithin tbe Aquifer Secisitive Area, where deemed fPasible by the Couiity Eligi-
neer, shell incocporate storwwater treatroent to mitigate ttle po[ential for groundwater
degredation. (See Guidelines for Stormwater Management 1981, Spokane Board vE Couaty
Commieeioner'e Resolution No. 80-1592, a8 amended.)
The purpoee of flood hazard zone review is to minimtae losses due to flouding in spe-
cific ereas destgneted by Flood tlazard 8ounclary maps vn f tle a[ the County Engineer'8
Of f ice. (See Spokane Board of County Cornmiasione r's Resotution No. 81-0726, as
amended.)
8/12/85