2003, 05-30 Permit: 03003795 Sewer SPOKANE COUNTY DIVISION OF BUILDING
v1_ AND CODE ENFORCEMENT
ilHi,
1026 WEST BROADWAY AVENUE • SPOKANE WA 99260-0050
Spac .COMTY
s. Project Information
Site Information
Site Address: 6521 E 11TH AVE
Project Number: 03003795 Inv: 1 Issue Date: 5/30/2003
SPOKANE,WA 00000 Permit Use: SEWER CONNECTION-WOODLAWN
Parcel Number: 35243.0312
Applicant: VISTA CONSTRUCTION&DEV
Subdivision: WALLACE ADD 3420 N TSCHIRLEY RD
Block: 2 Lot: 12 SPOKANE,WA 99216 Phone: (509)926-2243
Zoning: UR 7 Urban Residential-7 Contact: VISTA CONSTRUCTION&DEV
Owner: FORCIER,R P 3420 N TSCHIRLEY RD
Address: 6521 E 11TH AVE
SPOKANE,WA 99216 Phone: (509)926-2243
SPOKANE,WA 99212-0124Rear:
Setbacks-Front: Left: Right:
Building Inspector: F PALADICHUK
Water Dist:
Group Name:
Project Name:
Contractor: VISTA CONSTRUCTION&DEVELOPME License#: VISTACD999DE
Sewer Connection Permit $15.00
SEWER CONNECTION I $85.00 PROCESSING FEE
Total Permit Fee: $100.00
FOR SEWER INSPECTIONS CALL(509)477-3604 UTILITIES 8:30-5:00 PM MONDAY THRU FRIDAY
Call for inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED.
Sew
Contractor s applicant Tk field locate and
nect on o ensure that they have m the elevation and acn of sewer stub prior cceptable grade and are clear aany nd unobstruct d to the main sewer.
Sewer stubs are to be checked prior to con
Sewer lines should be constructed to allow for gravity flow from the lowest level of the structure.
This permit must be presented to the job site inspector for verification. To locate buried cables,gas piping,water lines,etc.
CALL BEFORE YOU DIG,(509)456-8000.
STATE LAW RCW 19.122 REQUIRES THAT PRIOR TO ANY EXCAVATION THE"CALL BEFORE YOU DIG"CENTER BE
NOTIFIED.CALL BEFORE YOU DIG AT LEAST 2 WORKING DAYS IN ADVANCE,(509)456-8000.
Spokane County Code requires the installer comply with all requirements of the Washington State Dept of Labor and Industries,including
those related to trench safety.
Tran Date -11t_ii Payment Amt
Total Fees Amo,untPaid Amou�tOwing 5/30/2003 3401 $100.00
$100.00 $100.00 $0.00
FILE
PERMIT
Processed By: BURRIS,ROBIN
Printed By: WENDEL,GLORIA
Page 1 of 1
y, to see
It is the responsibility of the applicant/permittee, not Spokane CouvO 1 1C to it that the use described on the front of thisp ermit complies with
applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary
approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the
applicant's/permittee's or property owner's expense.At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations.Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway right-of-way,whichever provides the greater setback from the center line of the roadway right-of-
way.Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas,the County can own as much as 20 feet of
right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely
with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the
owner's/permittee's expense.
2. FOUNDATION-when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING -after all framing, bracing and blocking is in place,and prior to concealing.
4. INSULATION-prior to the installation of drywall.
5. PLUMBING-after rough-in, before covering, and final.
6. MECHANICAL- rough-in of piping, before covering, metal chimneys before concealment,and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection.
NOTE:In addition to inspection of the structure,this inspection includes review of site improvements(typically depicted on the approved
required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants,fire department access,on-site
drainage("208 swales"), road improvements, site plan)
parking, end landscaping are common requirements of a permit/site plan which must be com-
pleted prior to final approval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES-Final inspection required when complete, stairs, handrails,skirting, etc. installed,and prior to occupancy; completed
inspection record card must be available on site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion.
In addition to the above,any plumbing or mechanical systems or material which would be concealed by framing,drywall,concrete,etc.,must be inspected
prior to cover. Check with the department for "special inspections"in conjunction with commercial projects.
FOR
TO INSURE PROMPT SERVICE, PLEASE GIVE INSPECTIONS:
WORKING DAY/24
UR
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS ONOTICE .
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and fire inspections, Division
• Road cuts for utilities or driveways, Division of Engineering &
of Building and Code Enforcement
477-3675 Roads - 48-HOUR NOTICE REQUIRED
477-3600
• Construction in a flood plain, Division of Engineering & Roads or State Department of Transportation
477-3600 456-3000
• Electrical wiring, State Department of Labor and Industries •
Sewer connection, Division of Utilities
324-2640 477-3604
or City Public Works Department
• On-site waste disposal system,Spokane Regional Health District 625-6300
324-1560
Unless otherwise noted,this permit will EXPIRATION
null
f Lhe work AND authorized by the permit is not commenced or is stopped for
REFUNDS
a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to exit
minimum an inspection should be requested at least once every 180 days to assure the validity of the permit.A permit may be renewed within one year
of the date of expiration for one-half the original fee,subject to certain limitations—please call us if you have anyp anon.At a
All refund requests must be made in writing by the applicant/permittee(shown on the reverse)no later than 180 days after the date of fee payment.
Refunds of not more than 80%of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized
more than 180 days after fee payment. ���� �+
If you think we've made an error in processing this permit or in conducSTA KtIE inspections
pertaining to it,or find erroneous information
bring it to our attention immediately by filing a written request for correction within 10 working days of discovery.All such requests should be directed to
the Division of Building and Code Enforcement at the below address. in the permit,please
Spokane County Division of Building& Code Enforcement
1026 West Broadway Avenue
Spokane, WA 99260
Phone: (509)477-3675 Fax: (509) 477-4703 TDD: (509)477-7133