2009, 05-08 Permit App: 09001229 GarageProject Number: 09001229 Inv: I Application Date: 5/8/2009 Pagel of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information: _ ,„.,,.,,,.,1.,,.,5
—
Permit Use: NEW 20 X 24 GARAGE ADDITION Contact LILAC CITY BUILDERS � �
Address: 302 E. 29TH AVE
C - S - Z: SPOKANE, WA 99203
Setbacks: Front Left: Right: Rear: Phone: (509) 9994001
Group Name:
Site Information:Project Name
Plat Key: 000000 Name Range District: Sout m r,auu•:.,..
Parcel Number: 45213.9201 Block: Lot:
SiteAddress: 11314E 10TH AVE Owner: Name: DIAL, JERI E
Location:: CSV
Zoning: R-3 SF Res District
Water District, 007 MODEL
Area: 32 Acres Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
Originally Released:
Landuse/Zoning/HE Conditions
Permits:
Address: 13404 E SALTESE AVE
SPOKANE, WA 99216-0459
Hold: ' '
Depth: 0 Right Of Way (ft): 0
Released By.
5/7/2009 By: tmelhourn
Released By
Approved with condition to hardpave the driveway a minimum area of 1T W X 20' in length
Originally Released: 5/7/2009 By: LBARLOW
Operator: jmm Printed By: jmm Print Date: 5/8/2009
Project Number: 09001229 Inv: I Application Date: 5/8/2009 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
--- Building Permit --
Contractor: LILAC CITY BUILDERS Firm: LILAC CITY BUILDERS
Address: 302 E 29TH Phone: (509)999-4001
SPOKANE, WA 99203
Notes:
A hardpaved driveway, not less than 17' in width,shall be provided from the edge of the property line -
up to the garage enhance.
The information reviewed indicates that the dwelling is located approximately 29' from the back of the
property line. The garage is proposed even with the dwelling, so no changes to the site plan are
necessary as the 20' setback is still met.
The site plan indicates that the dwelling is set back approximately 34' from the front property line.
However, this appears to be based on the assumption that the property line begins at the back of the
curb which is lucmuret.
Payment Summary:11-11-11—""-"".,..
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owine
Building Permit $231.06 $231.06 $45.31 $185.75
$231.06 $231.06 $45.31 $185.75
Disclaimer:
Submittal of this application rectifies the owner (or persons) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: joint Printed By: jmm Print Date: 5/8/2009
This Application:
Total Project:
Description Grp Type
Notes
Sq Ft Valuation
Sit Ft
Valuation
GARAGE U-1 VB
ADDITION
480 $9,120.00
480
$9,120.00
Totals:
480 $9,120.00
480
$9,120.00
Item Description
Units
Unit Desc
Fee Amount
RESIDENTIAL PERMIT FEE
1
SELECT
$181.25
ACCESSORY PLANS REVIEW
t
SELECT
$45.31
WSBCCSURCHARGE
l
SELECT
$4.50
Permit Total Fees:
$231.06
Notes:
A hardpaved driveway, not less than 17' in width,shall be provided from the edge of the property line -
up to the garage enhance.
The information reviewed indicates that the dwelling is located approximately 29' from the back of the
property line. The garage is proposed even with the dwelling, so no changes to the site plan are
necessary as the 20' setback is still met.
The site plan indicates that the dwelling is set back approximately 34' from the front property line.
However, this appears to be based on the assumption that the property line begins at the back of the
curb which is lucmuret.
Payment Summary:11-11-11—""-"".,..
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owine
Building Permit $231.06 $231.06 $45.31 $185.75
$231.06 $231.06 $45.31 $185.75
Disclaimer:
Submittal of this application rectifies the owner (or persons) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: joint Printed By: jmm Print Date: 5/8/2009
Permit Center
Cmc_' � 11703 E Sprague Ave, Suite B-3 .
',VI'll"� Spokane Valley, WA _99206--
N]n,�llM. (509)688-0036 TXX: (5,�
�ssauas6J Wo eedbts
Community Development 01 0 %
Residential Construction .,-„r,,"
Permit Application
Other:
PERMIT NUMBER:
PERMIT FEE:
❑ Accessory Bldg
❑ Deck
slTE ADDREss: 1(-614 e I AVL 2: �/M-LEq W%Q t`Ti2NO
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Contact Person
Name: �A,/Z J�
Phone: j, — co
Describe the scope of work in detail: Cost of Project: $ 4 -) & C/ rA
3UILZ 76,4Zq 6741?-IZC A�(7tT01J
Proposed Use: ('14"c C—
**************The fnllnwino IMT.CT hr rnnnnlet,- (write N/A if not
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
'2_a�2
I
MAIN F(OOR TO SQ.
2 FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
FTG:
_. ,
AREA:
FINISHED BASEMENT
GARAGE SO,
FT f'
DECK/COV. PATIO SO. FTG:
30% SLOPES ON
SQ. FTG:
AW
K� O(h
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Partnit Center. 5) TM1i ity of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. YPI ns r a aH ormation may be required to be submitted, and subsequently approved before
this application can be proc se . `/)\
SIGNATURE: DATE:
Method of Payment
❑ Cash ❑ Check
Bankcard #:
Authorized Signature:
REV1z o V1W7
❑ Mastercard ❑ VISA
Expires: VIN#:
For City Use O{
clTv oe11� PLUS Project Number
Spokane Project Address F
j ValleY 11703 E Sprague Ave Suite B-3 ♦ Spokane Vatley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevatley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Protect Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look a1 your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact as if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Yom application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK -BUILDING FILE REV alar
A as`9(rl
3Ahf,toi
MSN
PLANNING DEPT. APPROVED
DATE:-02L.m4 7 cos
$�LL'A erws
p"a'�'r.�t W d-ae1 hat6tw.rA i
1 -tie haat
O�lit r r2 V�nAGt r
4tr.�s-M2 �S�F-hacc 2°� Y+
Rye. *�
we
Qn/ ---R�M't�SmCli1'�-St.�h[su�c n
OAA. $F,tl W1k S7't10 06