2012, 06-20 Permit: SW-12001591 Sewer SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001591 06/20/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: H&S CONSTRUCTION
Project Name: WOODLAWN/BEVERLY HILLS Applicant: H&S CONSTRUCTION
Permit Type: SEWER Address: 11817 E VALLEYWAY AVE
SPOKANE,WA 99206
Phone: 509-926-8964
Email:
SITE INFORMATION:
Site Address: 6814 E 11TH AVE Owner: ETZEL LIVING TRUST
Parcel Number: 35244.2001 Address: 1917 W GAIL JEAN LN
SPOKANE,WA 99218
Subdivision: WOODLAWN PARK Phone:
Assessor's Description: WALLACE FIRST ADD L1 Email:
Inspection Area:
Water District: East Fire District: Spokane Valley Fire
Spokane Water District
#1
Zoning: Land Area:0.8373 acres/36472 sqft
CONTRACTOR INFORMATION:
General Contractor
HSCON**123KF
H&S CONSTRUCTION
11817 E VALLEYWAY AVE
SPOKANE,WA 99206
509-926-8964
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed:06/20/2012 10:36:18 Printed by:IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
6
Permit Issued Date:
Application Number: SW-12001591 06/20/2012
Expiration Date:
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:06/20/2012 10:36:18 Printed by:IIS APPPOOL ASP.NET v4.0