2009, 01-23 Permit App: 09000134 Remodel, DeckProjectNpmber: 09000134 Inv: I Application Date: 1232009 Page 1 oft
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Proiect Information:
Permit Use: NEW DRYWALL & ATT DECK Contact: CAPSTONE CONSTRUCTION
Address: PO BOX 388
C - S - Z: NINE MILE FALLS, WA 99026
Setbacks: Front Left: Right: Rear: Phone: (509)4684981
Group Name:
Site Information: Project Name:
r
Plat Key: 000639 Name: DOBRAVEC 03RD ADD District: Sout
Parcel Number: 45213.2011 Block: Lot:
SiteAddress: 11325 E 10TH AVE Owner: Name: CORBETT, BYRON & CONSTANC
Address: 11325 E 10TH AVE
Location:: CSV SPOKANE VALLEY, WA 99206
Zoning: R-3 SF Res District
Water District
Area: 12,384 Sq Ft Width: 90
NbrofBldgs: 0 Nbr of Dwellings: 1
Revim Information:
Review
Building Plan Review
Originally Released:
Landuse/Zoning/HE Conditions
Originally Released:
Permits: �:..,.,.:.. �,.._....
Hold:
Depth: 137 Right Of Way DU: 0
1/22/2009 By: mpalaniuk
Operator: JD Printed By: JD Print Date: 1/23/2009
Project Number: 09000134 Inv: I Application Date: 123/2009 Page 2 of
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
-- Building Permit
Contractor: CAPSTONE CONSTRUCTION Firm: CAPSTONE CONSTRUCTION
Address: 2917 E FRANCIS Phone: (509) 4684981
SPOKANE WA99208
Payment Summary:
Permit Tvpe Fee Amount Invoice Amount Amount Paid Amount Gusto
Building Permit $219.05 $219.05 $61.30 $157.75
$219.05 $219.05 $61.30 $157.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance ofa permit shall not be construed to be a permit for, or an approval of, any violation ofany of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 1/23/2009
This Application:
Total Project:
Description Crg Type
Notes,
So Ft Valuation
So Ft
Valuation
DECK OPEN R-3 VB
DECK &
0 $8,000.00
0
$8,000.00
DRYWALL
Totals:
0 $8,000.00
0
$8,000.00
Item Description
Units
Unit Desc
Fee Amount
RESIDENTIAL PERMIT FEE
I
SELECT
$153.25
WSBCC SURCHARGE
I
SELECT
$4.50
SF PLNS RV W < 7999 SQ FT
I
SELECT
561.30
Permit Total Fees:
$219.05
Notes: ..,,..�...,.,,....
,__.. .:..,..
.;.
..w..::-, . ,:.. -:.
Payment Summary:
Permit Tvpe Fee Amount Invoice Amount Amount Paid Amount Gusto
Building Permit $219.05 $219.05 $61.30 $157.75
$219.05 $219.05 $61.30 $157.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance ofa permit shall not be construed to be a permit for, or an approval of, any violation ofany of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 1/23/2009
Permit Centerjgllo� -
mxrc 11703 ESprae Ave, Suite B-3 PERMITNUMBER'
Sj10I10 �rSpokane Valley, WA 99206 PERMIT FEE:
�AM1e'• v' (509)688FAX (509)688-0037
ecu J n kane kanevallev ore
Community Development
Residential Construction ❑ New Construction ❑ Accessory Bldg
Permit Application ❑�AdditiodZjemodel ❑C Deck
❑ Other:
SITE ADDRESS: 11326- `L 10 '
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
Contractor: �� d*L47—
Name:
Name: fe-
6"7-1
Address: O
Address:.
r
City:
(4 Zip:Zipelp
City:
d
State:
wA—I)
Phone: _ ��/ Fax:
Phoue:fl _ .1b8� I
Fax:
Contact frerL _
Name: S
Phone: — 4s —
Contractor Lic77No:
City Business Lic. No:
Exp Date:
OK
Describe the scope of work in detail: Cost of Project: $ o!— g000.0-49
IJcuJ � ey waLt.. Qt,S s I tf�-sm af+� Mee. D r%�
Proposed Use: /
**************The full I, MUST b coinpi write N/A if notapplicable)
**********************
HEIGHT TO PEA4(:
DIMENSIQFlN3:
# OF STODtRJIE�;
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2 FLOOR SQ. FTV
A
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. FIG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permilee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE: DATE:
Method of Payment:
❑ Cash Check ❑ Mastercard ❑ VISA
Bankcard #: Expires: VIN#:
Authorized Signature:
arvisro vivor
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
❑ SITE PLAN
o Window and door location and sizes
❑ Property lines and dimensions
❑ Setbacks to property lines
❑ Direction arrow pointing North and orientation to streets
❑ Distance between buildings
❑ Proposed/existing buildings (footprint and dimensions)
❑ Right of way/easement location & sizes
D Utilities, septic tank/drain field locations and distances
❑ Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
❑ Footing sizes and locations ❑ Supporting wood cripple walls or beams
❑ Perimeter concrete foundation wall sizes ❑ Thickened concrete pads supporting
❑ Crawlspace ventilation beams or girder trusses
Floor Plan of each level (finished or unfinished) with dimensions
❑ Floor Joist direction, size and spacing
o Window and door location and sizes
❑ Header, beam or concrete lintel sizes
❑ Window well locations if applicable
❑ Brace wall panel locations
❑ Room usage labels
❑ Water heater and furnace locations
❑ Smoke detector locations
❑ Exhaust fan locations
❑ Deck or concrete patio sizes and locations
❑ Roof Plan:
❑ Engineered truss direction and spacing
❑ Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
❑ Slope/ roofing material/ underlayment/ ice dam protection
❑ Sheathing size and type
Ceiling
❑ Joist size and spacing
Wall
❑ Attic and crawl space access locations
❑ Fire Wall construction
❑ Ridge, eave and valley lines
❑ Beam and girder size and location
❑ Truss or rafter size, spacing & connection
❑ Attic insulation/ air space baffle/ ventilation
❑ Size of ceiling gypsum wall board
D Height/ top plate/ stud size and spacing/ sole plate ❑ Siding/ exterior house wrap/ anchor bolts
❑ Exterior sheathing size and type n Insulation, vapor barrier, gypsum wall board
Floor
❑ Joist size and spacing
Foundation Wall
❑ Concrete or Masonry unit width
❑ Earth to wood separation distance
Footing
❑ Size
Radon
❑ Passive system with Emil vapor barrier
Miscellaneous Construction Details
O Deck:
❑ Floor plan/ side view/ dimensions
❑ Floor Joist/ decking direction, size and spacing
❑ Stairway tread rise & run and nosing
❑ Sheathing or concrete floor size/ insulation
❑ Footing bottom to finished ground level depth
❑ Horizontal & vertical reinforcement if any
❑ Reinforcement if any
❑ Active system with 6 mil vapor barrier
❑ Footings/ post/ and beam size and locations
❑ Handrail / Guard height & spacing
—W—
.514-e P) Pp
w
It 315 r tum (cor6r- -)
r '�
0
j3'7
{6.
DATE: 11Z24669
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Vatley WA 99206
509.688.0036 1 Fax: 509.688.0037 ♦ permitcenter@spokanevatley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Proiect Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive [laws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE—APPLICANT PINK—BUILDING FILE REV 8107