Loading...
2015, 02-06 Permit App: APR-2015-0008 Approach kaCommunity Development Department (Staff Use Only) CITY Permit Center ne 11703 East Sprague Avenue,Suite B-3 PERMIT NUMBER: SpoOF Spokane Valley,WA 99206 el: PERMIT FEE: �,,,� Valley FT ea (509)(509)720-5240 688-0037 permitcenter aspokanevallev.org APPROACH PERMIT APPLICATION PROJECT ADDRESS: �7 5 17-1-1 /1%•1 START DATE: ANTICIPATED COMPLETION DATE: BUILDING OWNER NAME: /J' q MAILING ADDRESS: /0 2y F %T1 116 A 9 CITY: Sp®1CQ/7 e //'�� ,/ STATE: W A- ZIP: 9do? 3 CONTACT PERSON NAME: 1Q(2-)I d9 / Q Q G� PHONE: /,svgl IIq -- 7�CJpt/ FAX: CELL/94 6ed'L CONTRACTOR NAME: MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE#: EXPIRES: CITY BUSINESS LICENSE#: PROJECT DESCRIPTION(Please Provide Site Sketch) El Residential Driveway 0 Commercial/Industrial Driveway l Existing Curb&Gutter DRural Road Section El Culvert Installation ,�; El Sidewalk Repair/Construction Other Conditions: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center.5) The City of Spokane Valley permit is not a permit or approval for any violation of federal,state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature prniA�{ w ,Q Lc— �n —c.o^$ RECEIVED Q � FEB 06 2015 CSV PERMIT CENTER Pagelof2 DE-001:V-1 SUB #, I [ RV == APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION Provide required measurements(in sketch boxes),and include street name. Check all existing conditions that apply: ]Sidewalk Dbrainage Ditch ft wide lDrywell(show location on sketch) ft from back of curb I%4(,Other(please describe below) QStreetside Swale = DI STANCE FROM z'- t NEAREST PROPERTY LINE ! I MAY BE LEFT OR RIGHT SI DE) i � Li FT(SEE TABLE) wl o_ rt i a' CONCRETE APPROACH CRETUURB RN ' NG' THROB EETABLE)T WIDTH=FT WING I CURB W -sNIF CORNER LOT, DISTANCE FROM STREET NAME CURB TURN (SEE TABLE) STREET WITH CURB DISTANCE FROM Lu NEAREST PROPERTY LINE it LiMAY BE LEFT OR RIGHT SIDE) . FT SEE TABLE) 0 1 I 15'RADIUS MI ASPHALT RETURN APPROACH /__—.--------------' EDGE OF ---THROAEE TWBLE) SIF CORNER LOT, ASPHALT DISTANCE FROM STREET NAME RADIUS RETURN 0 FT(SEE TABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage;one on arterials. • Total width of approaches not to exceed 50%of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15'minimum 75'minimum Separation between Approaches(measured from centerline to centerline of See Page 7-27 each approach) None specified in City Street Standards Throat Width(flat portion) 16'min.,30'max. 30'min.,40'max. Wing Width(at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line(@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' DE-001:V-1 Page 2 of 2