Loading...
1978, 07-19 Permit App: M7216 ResidenceLl 9 County of Spokane, Washington BUILDING CODES DEPARTMENT, N. 811 JEFFERSON. SPOKANE, WASHINGTON 99201 APPLICATION FOR LAND USE OR STRUCTURE PERMIT GENERAL REQUIREMENTS PERMIT FEE­�R-- ------- PERMIT REQUIRED. A land use or structure permit is reguired by County Resolution to erect a building or structure of my kind or alter soy building or structure already erected, or to change a land use. Construction out cdeform with the Spokane Comfy Building Code and Zoning Dedicatee. Construction is subject to Inspection. WATER. WaterSupp ll must be approved by the County aid State Health Departments. Where work onwater connections disturbs the surface, ahouldera or ditches of County Roads, permission most be obtained :rum the Count] Engineer's Office. SEWAGE SYSTEM. Permits are required in all Cases by County Resolutions Nos. 45-133.d472,35. SET -BACK FROM PROPERTY LINES. In most zones Bud under most circumstances, a set -back free the front property line, of at least 25' is required, a 5' side yard, 15' side yard from a flanking street, and a 25' rear yard etc required. STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set -back and ingress .ad serum. COIMTY ROADS. Work on street right -of -wan may not be performed until staked by Comfy Road Department and work must be performed in accordance with stakes. Points of ingress and egress meet be approved by the County Engineer, ROVING OF BUILDINGS. A permit Is required to move an existing building. When a building is moved OR a Comfy or State Highway, clearance meat be obtained from the County Engineer and/or State Highway Department. ACCESSORY BUILDINGS. Accessory buildings (garages. sheds. etc.) require a aOperate permit. RESTRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and casements running with the land which are mforemble through civil action. Comfy Officials can not bring action to enforce does ... is or dedications. APPLICANT FILL IN BELOW THIS LINE Name of Owner V Addl YV9J 19 4k Phone I -ENS "1?S Architect Address Phone Engineer Address Phan. Contractor Address Phone Legal Dearg4lon of P1.0,7 y ICxi ve 71l 0 desaiptim from deed, tan receipt, etc.) Parcel Number t5 �4 c K 7 V RWA✓E< j.Rb A.y� / ,v ROADWAY iW WIDTHL S5 DESCRIPTION OFF WORK: New Additlom Remodel Moving BI g� Zona Fire f�K uns Size of Lot li _I i J Seveaga System I4L✓ E� Sonst Fr., ;We., Bn, steal SrorimaDimenaions 6 5 g Total Sq. Fc �c0 Valuation `�'y-T cJ"o Rooms Balls 2 Basement A Foundation Const. Cc>A(C/u T -F Chimney Fireplace —jFull, pert, normo (Kill) (Number Heat. System F A, E Typf of Roofing P Esc. Fi 'sh MPKoNITE Int. Wall Finish LJR�'4.iAd k Use of Bldg. SJN C, F Eli j_ ES ('£ iCE % ✓SIJ` No. of Unit a J. Bedroorns 3 PLOT PLA Draw sketch with dimensions showing: (1) property lines; (2) street r read proposed buildings; (4) distance to property lines and streets; (5) dimensions o tem end ester supply lines. j I hereby y as abuse. NORTH SOUTH correct and there are no other Owner or AWeet A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES THIS IS NOT A PERMIT. DO NOT WRITE BELOW TYoutrSmageeat address will her I�u-/�J `r- /Dirt Remarks lam d Pe - �C c�, /i^ it Form 523 Bldg. Code I0¢tlnns; (3) location of existing and u lldings; (6) location of sewage Sys- 5[vte License No. ter- v-EP3 GC- Ied. Ina. Acct. Ne. RESIDENTIAL - COMMERCIAL REQUIRED Plumbing Permit 4 L '�G Heating Permit / G 41"1/ 4&4 Title Sewage Permit PO4 A4 E.Q Plans Iteceived Plans Checked. Plans Returned Plans Picked UI Plans Mailed ctures located OR this property except I D.C. ' BEFORE CONSTRUCTION COMMENCES. LINE n4 1 a'I i The zone Receipt Zo-r 8 64ock 7 DoCOA✓cc 3pD A t+Dt 7, oq