1996, 10-02 Permit: 96008370 SewerSPOKANE COUNTY DIVISION OF BUILDING AND PLANNING
1026 W. BROADWAY • SPOKANE, WA 99260-0050
(509) 456-3675
INFORMATION
SITE ADDRESS: 11905 E 10TH AVE
SPOKANE VA W206
PARCEL NUMBER: 45214.0308
SUBDIVISION: JENICKE SOB
LOT: 8 BLOCK: 1 ZONE: AGSUB
INSPECTOR: FRANK PALADICHUK
NATER DIST:
OWNER: LOCKHART, BOB
PHONE:
ADDRESS: 11905 E 10TH AVE
SPOKANE WA W206
PROJECT NUMBER: 96008370 ISSUE DATE: 10/02/96
PERMIT USE: SEVER CONNECTION - TWINVIEN(96S-1083)
APPLICANT: ARMSTRONG CONSTRUCTI
PHONE: 509 928 0559
ADDRESS: P.O. BOK 14282
SPOKANE NA W214
CONTACT: DICK ARMSTRONG PHONE: 509 928 0559
SETBACKS -> FRONT: N/A LEFT: N/A RIGHT: N/A REAR: N/A
LENDER NAME:
PHONE:
ADDRESS:
PERMIT(9)
SEWER PERMIT I
CONTRACTOR
ARMSTRONG CONSTRUCTION
LICENSE N: ARMSTC"192111
SEWER CONNECTION 1
PROCESSING FEE 10.00
TOTAL PERMIT FEE 550.00
ISSUED PERMIT BY: BURRIS, ROBIN
SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO INSURE
THAT THEY ARE CLEAR AND UNOBSTRUCTED TO THE SEWER MIN
•• • " CALL FOR INSPECTION PRIOR TO COVER •"""'•"
24 HOUR NOTICE REQUIRED •••••
+++arrrrr 456-3604 """••••`
PAYMENT SUMMARY
NOTES
PAYMENT DATE
RECEIPT# PAYMENT
AMOUNT
IN SEWER STUB AS -BUILT INFORMATION AND INSPECTIONS, CALL
------------
-------- --------------
THE COUNTY UTILITIES DEPARTMENT AT 456-3604"`
10/02/96
00010269
S50.00
OR APPLICANT ELD A FIRIM
CONTRACT
TOTAL FEES
AMOUNT PAID AMOUNT
WING
ELLEVATIONRAND POSITION OFSSEWERI STUBLP OTHE -`
-------------
-------------------
- ----
EXCAVATION
S50.00
$50.00
S.00
TO LOCATE BURIED CABLES, WS PIPING, WATER LINES, ECT.
CALL BEFORE YOU DIG (456-8000)
ISSUED PERMIT BY: BURRIS, ROBIN
SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO INSURE
THAT THEY ARE CLEAR AND UNOBSTRUCTED TO THE SEWER MIN
•• • " CALL FOR INSPECTION PRIOR TO COVER •"""'•"
24 HOUR NOTICE REQUIRED •••••
+++arrrrr 456-3604 """••••`
NOTICE
It Is the responsibility of the permittee, not Spokane County, to see to it that the use described on the front of this permit complies with applicable codes
and requirements and that required inspections are requested Failure to request required inspections and obtain the necessary approvals prior to
progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the owner s/permlttee'c
expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete.
NOTE: This Inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway right -ef-way, whichever provides the greater setback from the center line of the roadway
right of way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can awn as much
as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback
provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification
or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require
Its relocation at the owner's/permur ee's expense.
2. FOUNDATION when forms and reinforcement are in place and prior to placement of concrete. (Blocking for a manufactured home Is
required to be inspected prior to the installation of skirting)
3. FRAMING after all framing, bracing and blocking is in place, and prior to concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after rough in, before covering, and final.
6. MECHANICAL - rough in of piping, before covering, metal chimneys before concealment, and final.
FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice.
NOTE: In addition to inspection of the structure, this inspection induces review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must
be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
In addition to the above any plumbing or mechanical systems or materials which would be concealed by framing, drywall, concrete, etc., must be
inspected prior to cover. Check with the department for "special inspections" In conjunction with commercial projects.
CALL 456-3675 FOR INSPECTIONS.
TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE.
YOUR INSPECTOR IS -
UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES:
• Road cuts for utilities or drives, County Engineer's Office
456-3600
or State Department of Transportation
4563000
• On site waste disposal system, Spokane County Health District
324-1560
• Construction in a flood plain, County Engineer's Office
456-3600
• Sewer connection, County Utilities Department
4563604
or City Public Works Department
6256300
• Electrical wiring, State Department of Labor and Industries
3242640
EXPIRATION
Unless otherwise noted, this permit will be considered null and void by limitation of the work authorized by the permit if not commenced or is stopped
for a period of 180 days. unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration.
At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within
one year of the date of expiration for one-half the original fee, subject to certain limitations—please call us If you have any questions.
MISTAKES?
If you think we've made an error in processing this permit or in conducting Inspections pertaining to It, or find erroneous information in the permit, please
bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to
the Division of Building and Planning at the address found on the face of this permit.
I certify that I have examined this permit/ application, state that the information contained In it and submitted by me or my agent to compile said
permit/application is true and correct, and authorize Spokane County to proceed with processing, In addition, I have read and understand the
INSPECTION REQUIREMENTS/NOTICE provisions included herein and agree to comply with same. All provisions of laws and ordinances
governing this type of work will be complied with whether specified herein or not I understand that the issuance of this permit/ application and any
subsequent Inspection approvals or Certificates of Occupancy shall not be construed to give authority to violate or cancel the provisions of any
state or local law regulating construction, or as a warranty of conformance with the provisions of any state or local laws regulating construction.
SIGNATURE OF APPLICATION
OWNER OR AGENT DATE