2002, 08-02 Permit: 02006610 DeckSPOKANE COUNTY DIVISION OF BUILDING
AND CODE ENFORCEMENT
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
Site Information
Site Address:
11905 EIOTIIAVE
Permit Use: 12 X 281NCOVERED ATTACHED
SPOKANE, WA 99206
Parcel Number:
45214.0308
Subdivision:
TENTCKE St TB
Block:
Lot:
Zoning:
UR -3 Urban Residenuut 35
Curer:
SCI-ETTLER,MIKE
Address:
11905 EIOTHAVE
Setbacks -Front: NA Left: Right:
SPOKANE, WA 99206
Building Inspector:
DAN HOWARD
Water Dist
Project Information
Project Numhec 02006610 Inv: 1
Issue Date: 82/02
Permit Use: 12 X 281NCOVERED ATTACHED
DECK
Applicant: SCFE?TTLER, MIKE
11905 EIOTHAVE
C'... radar:
SPOKANE, WA 99206
Phone: (509) 922-6401
Contact: SCIIEITLER, MIKE.
11905 EIOTH AVE
SPOKANE, WA 99206
Phone: (509)922-6401
Setbacks -Front: NA Left: Right:
Rear:
Group Name:
Project Name:
Processed By: FRAZIER. CAROL PERMIT
Printed By: W ENDEL, GLORIA Page I of 1
Permits
Building Permit
C'... radar:
DINNER
Lkn-#:—OWNER
Addition
DECK
R-3 VN
336 RESIDENTTAI. VALUATION
S75.50
STATE SURCHARGE
$4.50
Dim:
] StoriesTotal
Value:
$2,630
8S
RESIDENTIAL SURCHARGE
516.61
Sy F L
_
Grp:
Type
Tolal Permit Fee:
$96.61
FOR BUI LDING INSPEC"PIONS CALL
(509) 477-3695.
Payment Summary
Total Fees
AmountPaid AmountOwine
Tran Date
Receipt Payment Amt
$96,61
$96.61
$0.00
82/02
5914 $'96.61
Processed By: FRAZIER. CAROL PERMIT
Printed By: W ENDEL, GLORIA Page I of 1
NOTICE
It is the responsibility of the applicam/permittes to see to it that the use described on the front of this permit complies with applicable codes and
requirements and that required inspections are Requested. Failure to request inspections as listed below, and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of tannin parts of the construction at the applicent's/pefmittee's
or property owners expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes.
NOTE: This inspection includes review of the stmctunrs setbacks from property linea. Minimum setbacks are established by County zoning
regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from
Me property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of-
way. Curb lines and fence lines are not necessanty, indicative of property lines. In some residential areas, the County can own as much as 20 feet of
right-of-way, between your property and the actual improved streeteurb. The responsibility to comply with applicable setback provisions lies solely
with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
property lines. Please verity their location prior to locating your structure. Failure to property locate the structure may require its relocation at the
owner's/permittee's expense.
2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - ager rough -in, before covering, and final.
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. AU permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this perrnv. Items such as the installation of fire hydrants, fire department access, on-site
drainage ("208 swalers"), road improvements, parking, and landscaping are common requirements of a per ensge plan which must be com-
pleted prior to final approval of a building or issuance of a Cevdicate of Occupancy.
8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skiving, etc. installed, and prior to occupancy; completed
inspection record card must be available on site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, ager completion.
In addition to the above, any plumbing or mechanical systems or marshal which would be concealed by framing, drywall, concrete, etc., must be inspected
prior to cover. Check with the department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and fire inspections, Division Road cuts for utilities or driveways, Division of Engineenng 8
of Building and Code Enforcement Roads - 48-HOUR NOTICE REQUIRED
477-3675 477-3600
or State Department of Transportation
• Construction in a flood plain, Division of Engueenng 8 Roads 456-3000
477-3600
• Sewer connection, Division of Utilities
• Electrical wiring, State Department of Labor and Industries 477-3604
324-2640 or City Public Works Department
625-6300
• Ou-she waste disposal system, Spokane Regional Health District
324-1560
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by Me permit is not commenced or is stopped for
a pend of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a
minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year
of the date of expiration for one -hag the original fee, subject to contain limitations—please call us if you have any questions.
All refund requests must be made in writing by the applicanVpermittee (shown on the reverse) no later then 180 days after the data of fee payment
Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the pevng. No refunds may be authorized
more Man 180 days akar fee payment.
MISTAKE?
If you Mink we've made an error in processing this permit or in conducting inspections pertaining to n, or find erroneous information in the permit, please
bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to
Me Division of Building and Code Enforcement at the below address.
Spokane County Division of Building & Code Enforcement
1116 West Broadway Avenue
Spokane, WA 99260
Phone: (509) 477-3675 Fax.' (509) 477-4703 TDD: (509) 477-7133 FORM 30-0 z02 actio vsanm