Loading...
2002, 09-12 Permit: 02006611 GarageSPOKANE COUNTY DIVISION OF BUILDING AND CODE ENFORCEMENT 1026 WEST BROADWAY AVENLIE a SPOKANE, WA 99260-0050 Site Information Project Information Site Address: 11905 EIOTHAVE Project Number: 02006611 Inv: 1 Issue Date: 9/12/2002 SPOKANE, WA 99206 Permit Use: 30 X 40 DETACHED GARAGE Portal Number: 45214.0306 Subdivision: 7ENICKE SUB Applicant: SCHETTLER, MIKE Block: Lok 11905 E IOTHAVE Zoning: UR -3 Urban Residcw6a13,5 SPOKANE, WA 99206 Phone: (509)922-6401 Contact: Contact SCHETPLER, hBIE Owner. SCHETTLER, NUKE E IOIUAVE Address: 11905 E IOTHAVE SPOKANE, WA 99206 Phone: (509) 922-6401 SPOKANE, WA 99206 Setbacks - Front 50+ Left: 35 Right 25 Rear. 12 Building Inspector. DAN HOWARD Water Dist: Group Name: Project Name: ' Permits Building Fnrmif Contractor. MAGICCREEKCONSTRUCTION Licenaep: MAGICCC07T/DR Nev Building GARAGE U-1 VN 1,200 RESIDENTIAL VALUATION $22550 Dim: X Storm Total Value: 514,400.00 STATE SURCHARGE 54.50 Sq FC RESIDENTIALSURCHARGE 549.61 (;to; Type: 'Total Permit Fee: $279.61 FOR BUILDING INSPECTIONS CALL (509) 477-3675. Payment Summary Total Feet Amound'aid AmountOwing Tran Date Receipt 4 Payment Amt 6279.61 $279.61 $0.00 9/12/2002 7075 $279.61 Processed By: FRAZIER, CAROL PERMIT Printed By: SCHNEIDER, PENNY Page 1 of 1 NOtICE' It is the responsibility of the applicanVperedi tee. not Spokane County, to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested- Failure to request required inspections and obtain the necessary appro s prior to progressing beyond the point where inspections are required may necessitate re val of certain parts of the construction at the applicant a/permiltee s or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Cede. 1. FOOTING - when forms and reinforcement are In place and prior to placement of concrete—all structures, including manufactured homes. NOTE: This inspection includes review of the structures setbacks from property Imes. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property Imes, while setbacks for yards abutting streets are measured from the property line or the tamer line of the roadway right of way, whichever provides the greeter setback from the center line of the roadway right -at - way. Curb lines and fence Imes are not necessarily indicative of property Imes. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual Improved stresVcurb. The responsibility to comply with applicable setback provisions lies solely with the parmittes—neither Spokane County nor Its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require Its relocation at the er's/perminee's expense. 2. FOUNDATION - when farms and reinforcement are in place and prior to placement of concrete. 3. FRAMINGafterall framing, bracing and blocking Is In place, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough in before covering, and final. 6. MECHANICAL - rough in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection. NOTE: In addition to inspection of the structure, this Inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a fermileate plan which most be cam stated prior to final approval of a building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES Final inspection required when complete, stairs, handrails, skirting, etcinstalled, and prior to occupancy, completed inspection record card must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAV/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections' in conjunction with commercial projects. FOR INSPECTIONS TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections, Division Road cuts for utilities or driveways, Division of Engineering & of Building and Code Enforcement Roads 48-HOUR NOTICE REQUIRED 477-3675 477-3600 or State Department of Transportation • Construction in a flood plain, Division of Engineering & Roads 456-3000 477-3600 • Sewer connection, Division of Utilities • Electrical wiring, State Department of Labor and Industries 477-3604 324-2640 or City Public Works Department 625-6300 • On-site waste disposal system, Spokane Regional Health District 324-1560 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced oris stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit maybe renewed within one year of the date of expiration for one -hall the original fee, subject to certain limitations—please callus if you have any questions. All refund requests must be made In writing by the applicanVpermetee (shown on the reverse) no later than 180 days after the data of fee payment. Refunds of not more than 80% of the permit fee paid maybe authorized when no work has been done under the permit No refunds maybe authorized more than 180 days after lee payment. MISTAKE? If you think we ve made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous Information In the permit, please bring it to our attention immediately by tiling a written request forcormagon within 10 working days of discovery. All such requests should be directed to the Division of Bantling and Code Enforcement at the below address. Spokane County Division of Building & Code Enforcement 1026 West Broadway Avenur Spokane, WA 9920 Phone.: (509) 477-3675 F.: (509) 477-4703 IDD: (509) 477-7133