2010, 06-16 Permit: 10001638 GarageSpokane
Valley-
PERMIT CENTER
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Site Information Project Information
Site Address: 12019 E IOTH AVE
Parcel Number:
45214.0313
Subdivision:
Black:
Lot:
Zoning:
R-3 SF Res District
Owner:
MILLER, ERIC I & EMILY A
Address:
12019 E 10TH AVE
SPOKANE VALLEY, WA 99206
Building Inspector: SOUTII
Water Dist:
MODERN
Building Permit Contractor: OWNER
POLE BLDG
Total Value:
FOR BUILDING INSPECTIONS CALL (509) 688-0054.
Project Number: 10001638 Inv: I Issue Dale: 06/16/2010
Permit Use: NEW 818 SE ATTACHED GARAGE
Applicant: MILLER, ERIC 1 & EMILY A
12019 E IOTH AVE
SPOKANE VALLEY, WA 99206 Phone: (585) 880-9981
Contact: MILLER, ERIC 1 & EMILY A
12019 E 10TH AVE
SPOKANE VALLEY, WA 99206 Phone: (585)880-9981
Setbacks - Front: Left: Right: Rear:
Group Name:
Project Name:
Permits
U-1 VB SIS
$15.542.00
Lki,cuek: OWNER
RESIDENTIAL PERMIT IEE $265.25
ACCESSORY PLANS REVIEW $6631
WSBCCSURCHARGE 54.50
Total Permit Far: 5336.06
Payment Summary
Total Fees AmounlPaid AmountOwine Tran Date RRA 7avment Mat
$336.06 $336.06 $0.00 06/07/2010 23015 $62.81
06/16/2010 23136 $27325
Notes / Conditions of Approval
ALL RESIDENTIAL DRIVEWAYS MUST BE PAVED PRIOR TO FINAL INSPECTION PER SVMC 19.40.020(B)
Processed By: Main. Judi L PERMIT
Printed By: MORRIS, HEATHER Page 1 of 1
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicanUpermittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee'a or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code -
FOOTING -when forms and reinforcement are In place and prior to placement of concrete -all structures, Including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require Its relocation at the owner's/permlftee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before covering, and final.
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING -after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL - when complete and prior to occupancy and/or use. All permits require final Inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208'swales), mad improvements, parking and landscaping are common requirements of a perm t/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc, installed, and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-0F-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etcmust
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes Interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
veri and—dectona mr dovi hhadata crewhmenl ofwoo.
And mdvame: r212.0
Permb and mspec are la' orall. leaf l ayswrs, Spantane Roa,vrai
Health anon ]24-I sic
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transporafion
324-6000
Fenrvn a ha Inspedons to sewer e.h-dl,on, Sonole eoumy uthere dYdoo
411.2004
Fva irnkle, and alarm arneh5 and roved aces: road mspir000d sRMane valley
Fre gep rthei 6921122
stale law BE. 19 122 reaves mal and, am arl,roth the eALr BEFORE YOU plc' cemo nun re nodeea. cal Flow, pu da all11 —11rR ran in aawntt, ass -0000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or of after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original penmit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit Issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent ` �-CX�i Date
Staff Approval Date