2010, 06-10 Permit App: 10001638 GarageProject Number: 10001638 Inv: 1 Application Date: 6/10/2010 Page l of
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information: -
Permit Use: NEW 777 SF ATTACIRsD GARAGE Contact: MILLER, ERIC J & EMILY A
Address: 12019 E 10TH AVE
C - S - Z: SPOKANE VALLEY, WA 99206
Setbacks: Front Left: Right: Rear: Phone: (585) 880-9981
Group Name:
Project Name:
Site Information:
Plat Key: 001418 Name: LAMOTTE SUB
Parcel Number: 45214.0313 Block:
SiteAddress: 12019E 10TH AVE
Location:: CSV
Zoning: R-3 SF Res District
Watcr District 011 MODERN
Area: 13,202 Sq Ft Width: 0
NbrofBldgs: 0 NbrofDwellings: 1
Review Information:
Review
Building Plan Review
Originally Released:
Landuse/Zoning/HE Conditions
Originally Released:
Permits:
District: Sout
Lot:
Owner: Name:
MILLER, ERIC J & EMILY A
Address:
12019 E 10TH AVE
SPOKANE VALLEY, WA 99206
Hold:
Depth: 0 Right Of Way (tt): 0
Released By:
6/10/2010 By: tmelbourn
Released By: _
6/7/2010 By: cjjanssen
Operator: jmm Printed By: jmm Print Date: 6/10/2010
Project Number: 10001638 Inv: / Application Date: 6/10/2010 Page 2 oft
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
- -
Building Permit
Contractor: OWNER
Firm: OWNER
Phone: (000)000-0000
This Application:
Total
Project
Description Gro Tvoe
Notes
So Ft Valuation
So Ft
Valuation
POLE BDLG U-1 VB
POLEBLDG
777 $14,763.00
777
$14,763.00
Totals:
777 $14,763.00
777
$14,763.00
Item Description
Units
Unit Desc
Fee Amount
RESIDENTIAL PERMIT FEE
1
SELECT
$251.25
ACCESSORY PLANS REVIEW
1
SELECT
$62.81
WSBCCSURCHARGE
1
SELECT
$4.50
Permit Total Fees:
$318.56
Notes:
ALL RESIDENTIAL DRIVEWAYS MUST BE PAVED PRIOR TO FINAL INSPECTION PER
SVMC 19.40.020(B)
Payment Summary:
Permit Tvoe Fee Amount Invoice Amount Amount Paid Amount Owina
Building Permit $318.56 $318.56 $62.81 $255.75
$318.56 $318.56 $62.81 $255.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 6/10/2010
t - ; Permit Center PERMIT NUMBER:��-�fp.3
®� 11703 E S ra e
TIY 11� 7,,,�- Spokane ley, WA� G 1
" • (509)688- 36 FAJE�E �$5 -N PERMIT FEE:
�caa WWW.s o eval AtiIT �tt7ER
Community DevelopmentPraP,,,,, #1--
U�y Q J1� El Constructio � Sa38 NLw Con truction Accessory Bldg
Permit Application Name 'tio ' emodel ❑ Deck
,Submittal
SITEADDRESS MOkI If)r-y� AYF
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
DIMENSIONS:
Contractor:
eA_
Name: Fatc,
Name:
I
2 FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
Address:
Address:
AREA: Z
City:
State: Zip:
City:
State: Zip:
Phone: _
Fax:
Phone:
Fax:
# OF BEDROOMS:O
CONSTRUCTION TYPE:
Contractor Lic No:
Exp Date:
Contact PersonCiTy
Tr-
Business Lic. No:
Name:
Phone:
Describe the scope of work in detail: Cost of Project: $
Proposed Use: ST"G-,r xr 7Le C9a2icvt 8125
**************The following MUST be complete: fwrite N/A if not
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABI BLE SPACE:
IZ
MAIN FLOOR TO SQ.
2 FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
FTG:r"rte
tj ''
AREA: Z
FINISHED BASEMENT
GARAGE SQ. FTG:ECK/COV
PATIO SQ. FTG:
't'
30% SLOPES ON /�
SQ. FTG: N
AP
PROPERTY: 0
# OF BEDROOMS:O
CONSTRUCTION TYPE:
HEATSOURCE: ' 1A
SEWER OR SEPTIC?
N A
Tr-
l�
The permitea verges, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) PiRs or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE: ,,_ `��2 � DATE: �� T/ !0
Method of Payment:
❑ Cash ❑ Chack ❑ Mastercard ❑ VISA
Bankcard#: Expires: VIN#:
Authorized Signature:
REVISED V1 W7
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
❑ SITE PLAN
m Window and door location and sizes
❑ Property lines and dimensions
m Setbacks to property lines
❑ Direction arrow pointing North and orientation to streets
m Distance between buildings
❑ Proposed/existing buildings (footprint and dimensions)
❑ Right of way/easement location & sizes
❑ Utilities, septic tank/drain field locations and distances
❑ Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely
dimensioned)
❑ Elevations (Front/Rear/Sides) with roof peak and wall height
including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
❑ Footing sizes and locations
❑ Supporting wood cripple walls or beams
❑ Perimeter concrete foundation wall sizes
❑ Thickened concrete pads supporting
❑ Crawlspace ventilation
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions
❑ Floor Joist direction, size and spacing
m Window and door location and sizes
❑ Header, beam or concrete lintel sizes
❑ Window well locations if applicable
❑ Brace wall panel locations
❑ Room usage labels
❑ Water heater and furnace locations
❑ Smoke detector locations
❑ Exhaust fan locations
❑ Attic and crawl space access locations
❑ Deck or concrete patio sizes and locations
❑ Fire Wall construction
❑ Roof Plan:
❑ Engineered truss direction and spacing
D Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
❑ Sheathing size and type
Ceiling
❑ Joist size and spacing
Wall
❑ Height/ top plate/ stud size and spacing/ sole plate
❑ Exterior sheathing size and type
Floor
❑ Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
❑ Earth to wood separation distance
Footing
❑ Size
Radon
❑ Passive system with Emil vapor barrier
Miscellaneous Construction Details
❑ Deck:
❑ Floor plan/ side view/ dimensions
❑ Floor Joist/ decking direction, size and spacing
❑ Ridge, eave and valley lines
❑ Beam and girder size and location
❑ Truss or rafter size, spacing & connection
❑ Attic insulation/ air space baffle/ ventilation
❑ Size of ceiling gypsum wall board
❑ Siding/ exterior house wrap/ anchor bolts
❑ Insulation, vapor barrier, gypsum wall board
❑ Sheathing or concrete floor size/ insulation
D Footing bottom to finished ground level depth
❑ Horizontal & vertical reinforcement if any
❑ Reinforcement if any
❑ Active system with 6 mil vapor barrier
❑ Footings/ post/ and beam size and locations
0 Stairway tread rise & run and nosing ❑ Handrail / Guard height & spacing
y o w Avg 1
� A i
I
K
�eW -
29 Uv P
SS`4:r"-46116/2016
PLANNING D --
_Z,, RECE NCED
B (l CSV PERMIT CENTER
JJUNII
- DATE4:
jSubmittal #
/ZD/ Gl Ea-sd
10 tq-u e—
For City Use Onllyr/
PLUS Project Number / � 7
Project Address /7 /6 07 Z: /U*'�-
77703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is � / 4(
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertisefor dealing with reviewer comments would be the best choicefor the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application willbe routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK -BUILDING FILE REV W07
BY. -C:
/A 61 q e- f0�`
+�
9f E- 10 ' Ave -->H
D
i %i
DATE: 1/1:0;
- -
5ubmiflal
PERMIT CENTER .
Project Transmittal
11703 E Sprague Ave. Suite B-3, Spokane Valley, WA 99206
Phone: 509.720.5240 Fax: 509.688.0037
Deferred Documents ❑ Provide one of the following (REoua+ED FOR ACCEFTWE):
Response to Review Comments s PLUS Project#: /CJ –1638
Revisions to Application ❑ Parcel Number: L20F4 F L'00Ave
Other (Describe Below): ® Site Address: ot"4 VQ((rvr &✓A
I
Route to (Please check all that apply):
Proj
ect '�— —
Na%0a ) Ph e: Soq-2o4-yyoG 1
1�
Em0" % cow. Fax: --
Relationship to Project:
❑ Architect ❑ Engineer ❑ Other Design Professional s Contractor ❑ Owner/Applicant
NOTE:
Bring all documents to the City of Spokane Valley Permit Center at 11703 E Sprague Ave– Suite B-3.
We are sorry for any inconvenience, but documents brought elsewhere cannot be accepted.
Effective June 10, 2009
Division
# of Sheets/ Type of Document/ p of Copies
Received by:
®
Building
nn /�
/ /cG J � CD.tJ9• //6r] / /
VE IE
❑
❑
❑
QC Check by:
❑
Development Engineering
/ /—
VERIFIEDrINUMS
❑
OC Check by:
5a
Planningv
/ 1PCIilt� ,it jlL P4�. / /
F s
QC Check by:
❑
SV Fire Department
/ /—
VERIFIED/INIMLS
❑
❑
_/ /
QC Check by:
Proj
ect '�— —
Na%0a ) Ph e: Soq-2o4-yyoG 1
1�
Em0" % cow. Fax: --
Relationship to Project:
❑ Architect ❑ Engineer ❑ Other Design Professional s Contractor ❑ Owner/Applicant
NOTE:
Bring all documents to the City of Spokane Valley Permit Center at 11703 E Sprague Ave– Suite B-3.
We are sorry for any inconvenience, but documents brought elsewhere cannot be accepted.
Effective June 10, 2009
Contractors or Tradespeople Printer Friendly Page
General/Specialty Contractor
A business registered as a construction contractor with L&I to perform construction work within the scope of
its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of
account and carry general liability insurance.
Business and Licensing Information
Name
KEMPWOQD CONSTRUCTION
UBI No.
603014022
Impaired Date
Amount Received Date
WESTERN
Phone
5092094406
Status
Active
Address `.__.
362YS Bates Rd
License No.
KEMPWC-905NK
Suite/Apt.
$1,000,000.0008/12/2010
License Type
Construction Contractor
City
Spokane Valley
Effective Date
8/12/2010
State
WA
Expiration Date
8/12/2012
Zip
99206
Suspend Date
County
Spokane
Specialty 1
General
Business Type
Individual
Specialty
Unused
Parent Company
Business Owner Information
Name 1 Role Effective Date Expiration Date
KEMP, CHAD EVERETT Owner 08/12/2010 1
KEMP JENNIFER LEE Spouse 08/12/2010
t'age t or 3
Bond Information
!Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Dafe Impaired Date Bond Amount Received Date
1 PLATTE RIVER INS CO ICL52712155 08/09/2010 Until Cancelled 512,000.0008/12/2010
Assignment of Savings Information No records found for the previous 6 year period
Insurance Information
Insurance
Company Name
Policy Number Effective Date Expiration Date
Cancel Date
Impaired Date
Amount Received Date
WESTERN
1
HERITAGE INS
5CP0817440 08/10/2010 08/10/2011
$1,000,000.0008/12/2010
CO
Summons/Complaint Information No unsatisfied complaints on file within prior 6 year period
Warrant Information No unsatisfied warrants on file within prior 6 year period
https://fortress.wa.gov/lni/bbip/Print.aspx 7/12/2011