2012, 08-10 Permit App: BLD-2012-1295 Pole Bldg Community Development Department (Staff Use Only)
Permit Center
11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER:
CITY of Spokane Valley,WA 99206
kane Tel: (509) 688-0036 PERMIT FEE:
Fax: (509) 688-0037
4, ValValley, permitcenter@spokanevallev.orq [ RECEIVED
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
G 10 2012 A
ElNEW CONSTRUCTION ❑ ADDITION/REMODEL 0 AccEsscht)91619rdyligi Permit Center
❑ DECK ❑ OTHER )�
SITE ADDRESS: e a /lot/LP t //dot / Sff/" v p///
ASSESSORS PARCEL NO.:45213.2502 LEGAL DESCRIPTION: `
BUILDING OWNER NAME: w
Ked ii--- "I" A-eipt- //e/-
NAME:Kevin & Leigh Helt
ADDRESS:11216 E 11th v , lj J
CITY: Deer k 3 pok-�j i'€k,5-/6•7Z
v/ l/� t STATE:WA ZIP: ,Y-20 p
PHONE:5eE= O SO,-3 6 J -/6•7G
FAx CELL.
CONTACT NAME: Magic Creek Construction
PHONE: 509-276-7280 FAx:509-276-1211 CELL: 509-990-6969
CONTRACTOR NAME: Magic Creek Construction
MAILING ADDRESS: 802 N. Cedar Rd
Cm:
Deer Park STATE: WA zip: 99006
PHONE: 509-276-7280 FAX: 509-276-1211 CELL: 509-990-6969
z_on�SG
CONTRACTOR LICENSE NO.: magiccc913mn EXPIRES: CITY BUSINESS LICENSE NO.: 1
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
24 x 30 x 14 pole building •_
24 x 30 x 14 pole building �;•1-t"(2 e' 6102 .1-jt: l ' in (i-
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:1 81 Dimensions:24 x 30 No.of Stories:1 Total Habitable n/a
Space:
Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ Finished Basement SQ
n/a n/a FT: n/a FT:n/a
Garage SQFT: Deck/Covered Patio SQ Impervious Surface 30%Slopes on
720 r: Area: n/a Property: n/a
n/a
No. of Bedrooms:n/a Construction Type:fe/e Heat Source:none Sewer or Septic:sewer
TOTAL COST OF PROJECT: $ 13,680.00
DISCLAIMER
The permitted verifies,acknowledges and agrees by their signature that: 1)if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Effective October 28, 2007 Page 1 of 2
P:\Community Development\02 Administration\03 Forms-Official Versions\Permit Center\Residential Construction Permit
App 10.28.07.doc
Signature 2 t__. Date: Z-
...(- l l l� iG �/
Method of payment: 0 sh 0 Check 0 Visa 0 Mastercard
Bankcard #: EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 2 of 2
P:\Community Development\02 Administration\03 Forms-Official Versions\Permit Center\Residential Construction Permit
App 10.28.07.doc
•
Residential Driveway
SpanoliSlae\111.41 PAVING WAIVER
4.00Valle
Community Development— Planning Division
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720.5026 ♦ Fax: 509.688.0037 •planninR@spokanevallev.org
Spokane Valley Municipal Code(SVMC)Section 19.40.020.B; "All residential driveway and off-street parking areas shall be paved with
asphalt,Portland cement,grasscrete,paver blocks or other equivalent hard surface material". A paving waiver can only be granted if
the structure you are proposing is not going to require a driveway for daily use.
PART I — OWNER INFORMATION
OWNER NAME: ;i 'e//i lajnd La/54 //2G PARCEL#:
ADDRESS: 1/Q?f 6 ( I -4,\ Ave_
CITY: Spa V (ijrj STATE: IAA Zip: q(1,Z06
PHONE: seoq-9°?7 S/ FAX:• Ilk(a- CELL: /& EMAIL: rIAL
PART Il —DETAILS OF PAVING WAIVER
1. Do you have an existing garage for parking daily use vehicles? , YES ❑ NO
2. Is the proposed detached structure used for storage only? VYES ❑ NO
3. Do you plan on using the detached structure to park vehicles? "YES ❑ NO If yes, then
what type of vehicles? R V
4. Do you plan to conduct a business from proposed detached structure? ❑ YES VNO If so, what
is the nature of your business?
PART III —AUTHORIZATION
I,(PRINT NAME) 10 IL Fi ( owner, hereby confirm that the information provided on this
form is true and correct.-11 acknowledge that any change in the foregoing conditions, could require
the City to impose paving requirements. I further agree to report any change in these conditions to
the Spokane Valley Community Development Department, Planning Division, within 30 days.
A- 8- 11— /2
Owner Sig 'ture Date
PART IV — DECISION
STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT
DIRECTOR AND FIND THE REQUEST IS GRANTED AT 1I 2ZI(O C- I (Tt-' Ail
,
SAID ADDRESS FOR PERMIT#: j L b ` ZO 1 Z- (Z9.5
744- 14Av4 f� ZQI1�t — 1
Planning Division Staff Signature Date
Created 6/27/11 Page 1 of 1
Target Date sheet
SjöIine
For CitUse Only' ; +Project Address
Valle ®
Y 11703 E Sprague Ave Suite 8-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037♦ permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application,we are
providing you with a TARGET DA It for the initial technical application review. If for any reason we cannot meet
this date,we will contact you with a revised target date. '
i 5 '" ff f a /
kJ
Your application review TARGET DATE is ao
; '
The TARGET DATE is the date we estimate your project application will have had its initial technical review.It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
D Submit complete,accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
D Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
D Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your
target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3.Technical Compliance.Once an application is administratively complete,it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers.You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center.When all sections of the
application are received,a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at
that time.
CD-003 V-7/06-21-11 Page 1 of 1