Loading...
sp-640dVe SECYFER - E R:.CYEEE ErREEEEREE. ETE - NC) Li E. ED roe_ eve EE .4 FT" E • \A/ A 3 JEJ • .c:DulzvEy. .4141,4:::41M:44:41:::114V4 STATE OF WRSER COUNTY OF R 2- On this Ferrell H; individuale acknowle dge! e for the use 0 IN WITNECR u official My commise', - IcenSS d) ) g , E. R1 =ED c RE) CE RE:co ER rrr - Li i C 5 F: " F? iTi VALLEY \NA'f 34142: A ••• 1: b \ 3 30," 32- ACKNOWLEDGEMENT • 301.2_7 r scu) day of , 1990, before me appeared art and Audre Lee Nihart, husband and wife as the • executed the within and foregoing instrument and • same to be their free and voluntary act and deed • purposes herein mentioned. REOF, I have hereunt - ltychatitts&MTEaffixed) ne day and year &t a*. loiritten vE. ee05 up res Notary Public n and for the State of Washington Residing at Washington ...CREOr„ --- E59 - - r 'eD 12_6, 3 a 5 rz..1 A CQ ! r-J A /0 STREET DE.Di TION EJ1iJ I.NCT 5 E T 1:3 ACE K Z. • • LeECESEer 3 FOLIIEID 1 f 0 ST RE* e5 4-2. ,.:3(.• 7 i 4 T 2_0 ee KNOW ALL MEN NY THESE PRESENTS, that Ferrell H. Nihart, Audre Lee Nihart s9 and Pacific First Bank have caused to be platted into tracts the land shown hereon att 'tSEETkT PLAT 640-90" and described as follows: S ituate ig the County of Spokane, State of Washington. No more than one dwelling structure shall be placed on any tract nor shall any tract be further subdivided for the purpose of creating additional tracts, ewnerships or building sites without first filing and receiving approval of a replat. Side yard and rear yard setbacks shall be determined at the time building permits are requested. The setbacks indicated on this subdivision may be varied free if proper zoning approvals are obtained. The owner(s) or successor(s) in interest agree to authorize the County to place their eame(s)on a petition for the formation of a Road Improvement District (RIC) by the petition method pursuant to Chapter 36.88 RCW, which petition encisides the owner(s) property, and further not to object, by the signing et: a ballot, to the fo ation of a RID by the resolution method pursuant to Chapter 36.88 RCW which resolution includes the owner(s) property. It a RID is formed by either the petition or resolution method, as provided for in Chapter 36.88 RCW, the owner(s) or successor(s) further agree: (1) that the improvements or construction contemplated within the proposed UID is feasible, (2) that the benefits to be derived from the formation of the RID by the property included therein, together with the amount of any County participation, exceeds the cost and expense of formation of the IUD, and (3) that the property within the proposed RID is sufficieetiy developed. Provided, further, the owner(s) or successor(s) shall retsin the right, as authorized under RCW 36.88.090, to object to any assessmenSte on the property as a result of the improvements called. for in conjunction with the formation of a RID by either petition or resolution rethod uodur Chapter 3(.88 RCW, and to appeal to the Superior Court the decision of the Board of County Co issioners affirming the final assessmees It is further agreed that at such time as an RID is created or any Road ImprovemeeS Project is sanctioned by Spokane County, the improvements required ;ceett sidewalk, drainage control and paving) will be at the sole expense of the undersigned owner, their heirs, grantees and assigns without participation :'v Spokane County. The RID waiver contained in this agreement shall expire after ten (10) years from the date of execution below. However, the owner(s) or successorts) agree that if said RID waiver expires without construction of the required mprovements, the owner(s) or successor(s) agree to construct the required slprovements at their own expense; pay to Spokane County the then estincted cost of the required improvements to enable the County to complete .).e same; or furnish a bond or other secure method suitable to the County, prcviding for or securing to the County the actual construction ef the improvemeets. All of tr.- requirements of this agreement shall run with the land and shall be bindinj upon the owner(s), their successor(s) or assigns(s). A public sewer system will be made available for the plat and individual service eill be provided to each lot prior to sale. Use of individual on- site sewaee systems shall not be authorized. Use of pr wells and water systems is prohibited. The public water system, as approved by County and State health authorities and the local fire district and purveyor, will he installed within this plat, and the subdivider will provide for individual domestic water service, a5 well as fire protection, to each lot/tract prior to sale of each lot/ruct, The street hereon are hereby dedicated forever to Spokane Co nty to be useA , ces road purposes. COUNTY TREASURER 1 HEREBY CERTIFY THAT THE REQUIRED TAXES ON THE HEREON PLATTED LAND HAVE' EWEN FULLY PAID THIS DAY OF 19 The Scut h half of Lot 4 in Block 6 of OPPORTUNITY PLAT 3, as per plat thereof recorded in Volume "S" of plats, page 15; IN WITNE,S SifEREOF, 1 have hereunto set my hand and affixed my seal this as of ,1990. Ferrel H. Nihart Audre Lec Nihart STATE OF 2 R 2 )SS CGIUNTY 0' SURVEYORS CERTIFICAT DEDICATION Mi commission expires Pacific ' rst Bank AC KNOWLEDGEMENT This map correctly repreente a survey made by ma op ;u der' direction in conformance with the requireme County Short Plat Ordinance. eels day of 1990, before me appeared ulick known to be Ass stant Vice President of Pacific Dank, a Federal Savings Bank; formerly known as Pacific ,lcut Federal Savings Bank as the individual who executed the 1)Rthin and foregoing instrument and acknowledged the same to be his;ner free and voluntary act and deed for the uses and purposes c,ereth mentioned. E)le officer of said corporation on oath stated that he/she is ;lufncrized to execute said document and that the corporate seal fIxed (if any) is the corporate seal of said corporation. ;V wITNESS WHEREOF, I have hereunto sof my hand and affixed my official seal the day and year first ab,,ve written. Notary Public in and for the State of Washington Residin. Washington my ne ei t.rz VICINITY MAP COUNTY PLANNING EXAMINED AND APPROVED THIS DAY OF CLARENCE E. SIMPSON ENGINEERS N. 909 ARGONNE ROAD SPOKANE, WASHINGT0A1 SPOKANE COUNTY SHORT PLAT 640 90 5W1/4 5E1/4 SEC. 17 .7:25NR44 E.WM