Loading...
sp-640gRvEYORa NOTE • ONE. 5E cON 0 AN E,D3' -1 wE 5E0 FOR Y s A FIELD WA 5 U S FC r fL-1 SuRvEy. uJ \t" z 0 My co issIcn expires 13A 5 ea * THE BEAR [N4 OF N 0° z_ 14- E ALorsJc - T - NE e' A ID AS PE.R 5Hocal Pi- AT 88-55s le\7 S e:D / .„AQ,or\icT s 7) — 7 t\ — 1 — .d 1 \ 1 I 30 ACKNOWLEDGEMENT STATE OF WASHINGTON)SS COUNTY O ) On this day of 1990, before me appeared Ferrell H. Nihart and Audre Lee N hart, husband and wife as the individuals who executed the within and foregoing instrument and acknowledged the same to be their free and voluntary act and deed for the °,1af-,s and purposes herein mentioned. Atfrilt IN WITNESS WHEREOF, I have here official se2k1 the day and year firs en. 4;4 rri N ...7! L a — Notary Public in and for the State of ashington Residing at , Washington 1 C_D 33' WA L.r4 1..J 7 L_ECETENID • Fout-m Yz."R estm ( UNLESS OM- \ ER '4.11S T 72.. RE CP\ P / 3 7 ZO KNOW ALL MEN BY THESE PRESENTS, that Ferrell H. Nihart, Audre Lee Nihart and Pacific First Bank have caused to be platted into tracts the land shown hereon as "SHORT PLAT 640-90" and described as follows: The South half of Lot 4 in Block 6 of OPPORTUNITY PLAT 3, as per plat thereof recorded in Volume "S" of plats, page 15; Situate in the County of Spokane, State of Washington. No more than one dwelling structure shall be placed on any tract nor shall any tract be further subdivided for the purpose of creating additional tracts, ownerships or building sites without first filing and receiving approval of a replat. Side yard and rear yard setbacks shall be determined at the time building pei its are requested. The setbacks indicated on this subdivision may be varied from if proper zoning approvals are obtained. The owner(s) or successor(s) in interest agree to authorize the County to place their name(s)on a petition for the formation of a Road Improvement District (RID) by the petition method pursuant to Chapter 36.88 RCW, which petition includes the owner(s) property, and further not to object, by the signing of a ballot, to the fo ation of a RID by the resolution method pursuant to Chapter 36.88 RCW which resolution includes the owner(s) property. If a RID is formed by either the petition or resolution method, as provided for in Chapter 36.88 RCW, the owner(s) or successor(s) further agree: that the improvements or construction contemplated within the proposed RID is feasible, (2) that the benefits to be derived from the formation of the RID by the property included therein, together with the amount of any County participation, exceeds the cost and expense of formation. of the RID, and (3) that the property within the proposed RID is sufficiently developed. Provided, further, the owner(s) or successor(s) shall retain the right, as authorized under RCW 36.88.090, to object to any assessment(s) on the property as a result of the improvements called forin conjunction with the formation of a RID by either petition or resolution method un&er Chapter 36.88 RCW, and to appeal to the Superior Court the decision of the Board of County Co issioners affirming the fdnal assessment roll. It is further agreed that at such time as an RID is created or any Pohd Improvement Project is sanctioned by Spokane County, the improvements required (curb, sidewalk, drainage control and paving) will be at the sole expense of the undersigned owner, their heirs, grantees and assigns without participation by Spokane County. The RID waiver contained in this agreement shall expire after ten (10) years from the date of execution below. However, the owner(s) or successor(s) agree that if said RID waiver expires without construction of the required improvements, the owner(s) or successor(s) agree to construct the required improvements at their own expense; pay to Spokane County the then estimated cost of the required improvements to enable the County to complete the same; or furnish a bond or other secure method suitable to the County, providing for or securing to the County the actual construction of the improvements. All of the requirements of this agreement shall run with the land and shall be binding upon the owner(s), their successor(s) or assigns(s). A pUL' r system will be made available for the plat and individ;lal service be provided to each lot prior to sale, Use of individual on- site sewa4- ,vt.ius shall not be authorized. Use of preecce wellE: and water systems is prohibited, The public watir system, as approved by County and State health authoritis and the 144:Al fire district and purveyor, will be installed within this plat, and the subdivider will provide for individual domestic water service, 1 well as fire protection, to each lot/tract prior to sale of each lot/tract. The streets as shown hereon are hereby dedicated forever to Spokane County to be used tor road purposes. IN WITNES3 WHEREOF I have hereunto set my hand and affixed my seal this day of ,1990. Ferrel H. Nihart Audre Le .;TATE OF COUNTY OF 7 this day of -,v 1990, before me appeared Oaniel Wulick known to be Assistant Vice President of Pacific First Bank, a Federal Savings Bank; formerly known as Pacific First Federal Savings Bank as the individual who executed the within and foregoing instrument and acknowledged the same to be hi./her free and voluntary act and deed for the uses and purposes herein mentioned. The officer of said corporation on oath stated that he/she is authorized to execute said document and that the corporate seal affixed (if any) is the corporate seal of said corporation. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my 0fficial seal the day and year first above written. My co ission expires fa. SURVEYORS CERTIFICAT This map correctly represents a SU ey made direction in conformance with the requireme Co ty Short Plat Ordinance. ACKNOWLEDGEMENT )SS Charles E. Simpso DEDICATION Pacific First Bank Nihart Notary Public in and for the State of Washington Residin. Po% Washington SEC. SPOKANF C V ICINIT SPOKANE SHORT 640 AirIA2?:I4AA 5 ,., .::::, ,E,.... A . A F • .. • A r„ COUNTY T.. ...7.1 .SURER I HEREBY CERTIFY" THAT THE REQUIRItD TAXES CA THE HEREON PLATT ED L,4,1 FULLY PAID THIS ()AY OF . . I COUNTY 'NI G EXAMINED AND A WED THIS • DAY OF faaa CLARENCE E. ENGINEERS N. 909 AR GONN. ROAD • SPOKANE, WAS NG TON