Loading...
2002, 02-06 Permit: 02000719 SewerSPOKANE COUNTY DIVISION OF BUILDING j_ AND CODE ENFORCEMENT 111{ 1026 WEST BROADWAY AVENUE n SPOKANE, WA 99260-0050 \ Sn11GxMlx i Site Information rr oluss n IN V. III— I Site Address: 12705 E IOTHAVE Total Fees AmountPaid AmountOwin¢ Project Number: 02000719 Inv: 1 Issue Dow: 2/62002 Receipt M SPOKANE, WA 99206 $100.00 $100,00 $0.00 Permit Use: SEWER REPAIR Parcel Number: 45223.0330 Subdivision: WOODWARD PARK ADD Applicant: NORM'S EXCAVATING Black: Lot: P.O. BOX 574 VERADALE, WA 99037 Phone: (509) 928-0580 Zoning: AOS Contact: SHEILA OIBBONSMORMS'BOB Owner: ABARIOTES, GEORGE PO BOX 574 Address: 12705 EIOTHAVE VERADALE WA 99037 Phone: (509)928-0580 SPOKANE, WA 99206 Setbacks - Fronk. Leh: Right Rear. Building Inspector. DAN HOWARD Water Dist: Group Name: Project Name: Permits Sewer Connection Perini! Contractor: NORM'S EXCAVATING License#: NORMSE*014C5 SEWER CONNECTION 1 58500 PROCESSING FEE 515.00 Total Permit Fee: $100.00 FOR SEWER INSPECTIONS CALL (509) 477-3604 UTILITIES 8:30-5:00 PM MONDAY TJIRU FRIDAY Call for inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED. Contractor or applicant is m field locate and confirm the elevation and position of sever stub prior to any other excavation. Sewer stubs are to be checked prior in connection to ensure that they have acceptable grade and are clear and unobstructed to the main sewer. Sewer lines should be constructed mallow for gravity flow fmm the lowest level of the structure. This permit must be presented to the job site inspector for verification. To locale buried cables, gas piping, water lines, et:. CALL BEFORE YOU DIG, (509E56-8000. STATE LAW RCW 19.122 REQUIRES THAT PRIOR TO ANY EXCAVATION THE "CALL BEFORE YOU DIG" CENTER BE NO FILLED. CALL BEFORE YOU DIG AT LEAST 2 WORKING DAYS IN ADVANCE, (509N56-8000. Processed By: SHATTO, JULIE PERMIT Printed By: SCHNEIDER, PENNY Page 1 of 1 Payment Summary Total Fees AmountPaid AmountOwin¢ Trgn Date Receipt M Payment Amt $100.00 $100,00 $0.00 2/62002 716 $100.00 Processed By: SHATTO, JULIE PERMIT Printed By: SCHNEIDER, PENNY Page 1 of 1 NOTICE It is the responsibility of the applieansperenttee, not Spokane County, to see to It that the use described on the front of this permit complies with applicable codes and requirements and that required Inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where Inspections are required may necessitate removal of certain parts of the construction at the applicant s/permittee s or property owner's expense. At a minimum. the following inspections ARE REQUIRED by County Code. 1. FOOTING - when forms and reinforcement are In place and prior to placement of concrete—all struoWres, including manufactured homes. NOTE: This inspection includes review of the structure's setbacks from property lines Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lineswhile setbacks for yards abutting streets are measured from the property line or the center line of the roadway right -ol-way , whichever provides the greater setback from the center line of the roadway right of way. Curb lines and fence lines are net necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feel of right-ol-way between your properly and the actual Improved streescurb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor Its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prier to locating your structure. Failure to properly locale the structure may require Is reloeatom at the owner rebounded s expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing. 4. INSULATION - prior to the installation of drywall - 5. PLUMBING - after rough in before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. ALL permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as o condition of approval of this permit Items such as the installation office hydrants, fire department access, on-site drainage ("208 swafes"), road improvements, parking, and landscaping are common requirements of a permission plan which must be core plated prior to final approval of a building or issuance of a Carbonate of Occupancy. 8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etcinstalled and prior to occupancy, completed inspection record card must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections' In conjunction with commercial protects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAYl24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Builtling, plumbing, mechanical and lire inspections, Division • Road cuts for utilities or driveways, Division of Engineering 8 of Building and Code Enforcement Roads - 48-HOUR NOTICE REQUIRED 477-3675 477-3600 or Stets Department of Transportation • Construction in a flood plain, Division of Engineering 8 Roads 456-3000 477-3600 • Sewer connection, Division of Utilities • Electrical wiring, State Department of Labor and Industries 4773604 324-2640 or City Public Works Department 625-6300 • On-site waste disposal system, Spokane Regional Health District 324-1560 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced oris stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prier to expiration. At a minimum an Inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original lee, subject to certain limitations—please call us if you have any questions. All refund requests must be made in writing by the applicanspermence (shown on the reverse) no later than 180 days after the data of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit No refunds may be authorized more than 180 days after lee payment. MISTAKE? If you think we ve made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Division of Building and Code Enforcement at the below address. Spokane County Division of Building & Code Enforcement 1026 West Broadway Avenue Spokane, WA 99260 Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133