Loading...
2013, 10-07 Permit App: BLD-2013-2059 Garagew ommunity Development Department (Staff Use Orl It Center 00111111"11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER: !O':T'nt Spokane Valley, WA 99206 ilEmTel: (509) 720-2540 PERMIT FEE: ';00c 7 '7 m Fax: (509)688-0037 \•K`li■L1v�Y -tC to fsil DOk _�rlevdlley.orn RESIDENTIAL CONSTRUCTION PERMIT APPLICATION ja NEW CONSTRUCTION ❑ ADDITION/ REMODEL IQ ACCESSORY BUILDING E3 DECK ❑ OTHER SITE ADDRESS: 12720 E. 10TH - -- ASSESSORS PARCEL NO.:45223.0611 LEGAL DESCRIPTION: BUILDING OWNER NAME: DUANE SCHEELE NAME:DUANE SCHEELE ADDRESS: 12720 E. 10TH CM:SPOKANE VALLEY STATE:WA ZIP:99206 PHOMe 509 315 8888 FAX• CELL: CONTACT NAME:LARRY ANDERSON I DAVE BEAUDOIN. PHDNE:509-922-4384 FAE:509-9244096 CELL: CONTRACTOR NAME:BULLDOG CONTRACTORS, INC. MAILING ADDMW:16024 E. SPRAGUE AVE CTTY:SPOKANE VALLEY STATE:WA ZIP:99037 PHONE:509-922-4384 FAx:509-9244096 CELL: CONTRACTOR LICENsE NO.:BULLDC1933M5 Exnftu:7/25/2014 Cm Guinness LICENSE au, -emn If .1033MF DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: INSTALL NEW POLE BUILDING STORAGE BUILDING IN BACK YARD ****YOU MUST COMPLETE THE FOLLOWING**** MADV rule TF Nr1T APPLICABLE Height to Peak: i6 DimensiOns:24%36x12 No. of StorieAl Total Habitable Spam:O Main Floor SQ FT:884 Upper Floor SQ FT: WA UW nished Basement SQ FT:WA Fin shed Basement SQ FT:WA Garage SQ Fr: WA Deck/Covered Patio SQ FT:WA Impervious Surfam Area:WA 30% Slopes on Property:NONE No. of BedroomeA Construction Tyil Heat Soures:N/A Sever Or Se IC:SEWER TOTAL COST OF PROJECT: DISCLAIMER The permitted verifies, acknowledges and agrees by Meir signature MM: I) If MIs permit Is for construction or on a dwelling, the dwelling istwill M served by potable water. 2) Ownership of MIs City of Spokane Valley permit Inure to the property owner. 3) The signatory Is the property owner or has mmolsslon to represent the property owner In tints transaction. 4) All construction Is to be done In full compliance wIM the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permtt Center. 5) The Ctty of Spokane Valley permit Is not a permit or approval for any violation of federal, stffie or Itcal laws, codes or ordinances. 6) Plans or additional information may be required gybe subplltted and sub,*quently approved before this application can be processed. I http://www.spokanevalley.org/8lestom(jeII241938/210/948/1496/2743IRes_Permit.doc �s-zz����i -,oma- - - - t'- I �/ g." PLANNING DEPT. APPROVE4 U 'Y: Spwan�� i jvalley • Target Date sheet For City Use Only PLUS Project Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 • Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As pari of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is /0/16) The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact ifyou haven't heard from us by your target date. Stajfmay contact you before the target date ifthe initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Cheek. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in thein review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 lZ 770 c<— • zz, z 0 O W- 2013- 9-051 41 LqU m PLANNING DEPT. P , I'�.• MAN i