Loading...
2008, 07-02 Permit App: 08002430 Pole Bldg Project Number: 08002430 Inv: 1 Application Date: 7/2/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 30 X 48 POLE BLDG Contact: STEEL STRUCTURES OF AMERICA Address: PO BOX 895 C-S-Z: POST FALLS ID 83877 Setbacks:Front Left: Right: Rear: Phone: (208)777-8597 Group Name: Site Information: Project Name: Plat Key: 000000 Name: Range District: Sout Parcel Number: 45224.1322 Block: Lot: SiteAddress: 13313 E 11TH AVE Owner:Name: JOHNSON,JACK Address: 13313 E 11TH AVE Location::CSV SPOKANE,WA 99216-0617 Zoning: R-3 SF Res District Water District: 010 VERA Hold: ❑ Area: 16,500 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 50 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: 6/27/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: 1 Approved with 3 Conditions. Originally Released: 7/1/2008 By: LBARLOW Permits: Operator: JD Printed By: jmm Print Date: 7/2/2008 Project Number: 08002430 Inv: 1 Application Date: 7/2/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: STEEL STRUCTURES AMERICA Firm: STEEL STRUCTURES AMERICA I Address: PO BOX 895 Phone: (800)833-9997 POST FALLS,ID 83854 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation So Ft Valuation POLE BDLG U-1 VB 1,440 $27,360.00 1,440 $27,360.00 Totals: 1,440 $27,360.00 1,440 $27,360.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $421.55 ACCESSORY PLANS REVIEW 1 SELECT $105.39 WSBC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $531.44 Notes: a,.. .,, _ .. ,, ..=7_ If an additional driveway approach is created to provide access to the storage structure,the area between the roadway and the structure shall be hardpaved in compliance with SMVC I9.40.020.B. So long as the building will be used for the storage of yard equipment,collector cars, seasonal vehicles, etc.,and not for daily use vehicles access to the garage is not required. If the structure is used for the storage of daily use vehicles,than paved access to the street consistent with SMVC 19.40.020.B shall be provided. The paved access shall be a minimum of 10'wide. ADMINSTRATIVE EXCEPTION(ADE-09-07)APPROVED FOR LOTS 1-4 BLOCK 1 AND LOTS 1-4 BLOCK 2 OF MAMER PLACE.MINIMUM FRONTAGE OF 60 FEET IS ALLOWED-MII Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $531.44 $531.44 $0.00 $531.44 $531.44 $531.44 $0.00 $531.44 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 7/2/2008 ��. Permit Center S okane 11707 E Sprague Ave, Suite 106 PERMIT NUMBER:e-2/3 ,, Valle SpokValley, WA PERMIT FEE: Y (509)688-0036ane FAX: (509)688-003799206 Community Development www.spokanevalley.ore.com Residential Construction AS New Construction %Accessory Bldg Permit Application ❑ Addition/Remodel o Deck ❑ Other: SITE ADDRESS /3 3' 3 t---, - / / ASSESSORS PARCEL NO:9, ( J a/'k7 LEGAL DESCRIPTION: Buildingowner Contractor. _:. _j_ Name:�(&C t( _ 'J`>krtScl Name: ) SJJt veS America..) Address:) )3 ( , �I I Address:�.D. 4j(,,(, r; City:` ne_OW 11161(cJ./�p zip::?qa..'ic" ^�,�-� city: + MIS Zip:Phone: -Ol1't`7' J- / / ! +57 Lt3 Phone � ! /7Fax:c9 CJ-UJ5'7Z7y 70 Lic NoSTER,SAM613Exp.Date: )0/1 00 / Contact Person_:. City Business Lic No: Name:D vA9, S-1-en Phone:Ern-833 _9 9 7 Describe the scope of work in detail: Cost of Project: IQO, an _ llin� �� .. **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT(9.T1 PEAK: DIMENSIIO�NS: #OF STORIES:i TO., LAL HABITABLE SPACE: N in- MAIN FLOOR TO SQ. 2'" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: /L/ O AREA: FINISHED BASEMENT ARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: K PROPERTY: #OF BEDROOMS: CONST tUCCT QN TYPE: HEAT SOURCE: SEWER OR SEPTIC? DISCLAIMER ReJi "" a I M The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before this application can by•rocessed. Signature • 1 Date (p/ OS Method of Payment: (Faxe. .- t applications will only be acce 1. ',:myli nate i,:_nkcard) 0 Cash 0 Check 0 Master:- 1 I VISA ❑ Other Bankcard#: . Expires: VIN#: Authorized Signature: IJ`t REVISED 8/25/2005 Spokane 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall@spokaneval{ey.org Residential Plan Submittal Minimums Completed Building & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature, and date. I7/ Two sets of plans including Site Plan, elevations, floor plans, foundation plans With details, roof plan, framing plans & details. Show the height of any proposed buildings or accessory structures. N Floor plan for each floor: Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. e9' All braced wall panel types: show locations and details of installation, including engineered design. fes'" Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and in every room for sleeping. OA< Smoke detector locations 136 22"X 30" attic access location ,.. 18" X 24" crawl space access: One-hour separation detail: between house and garage FE Floor framing details: Joist type, size, spacing and installation details D7 Roof framing plan and details Furnace and hot water heater location. E]' All header locations: type, size, and connections Foundation plan 0 Insulation information Jun 25 08 10:48a Chuck Lindquist 509-328-1158 p.1 STEEL STRUCTURES AMERICA INC. Dapt.Time Date 1 -800-833-9997 Name l .,i2).4 Mailing Address/ ,5/,, �, _� ` Cit State T _Zip__ Job Address City # State 4/cf . Telephone Home Work Sidewall Gable County__________ e Building Size s2 x 4453 x / 0 10' 20' 30' 40' 50' 60' 70' 80' 90' i.- 10' �� he,'" /I . '1 e_pfe ., ..z90 -, (- 20' ____T,Ly____?, A_ e:/=.... %.. r 30' °/ JUN 2 5 2008 50' I 3 ' Arco ,i'' .acri,..,..T 60' 6.16" -i �2.A NING DEPT. APPROVED 70' 30' 3z' y• L . / /dA E: l ( L 2.'t)� i J' , Scale: 3/4 = 10' Customer Signature Sales Signature Job Name: _ Truss ID: TO9 _ Qty: 9 Drwg: BAG 1-LOC saner 012s R1e.D TC DIB DFL 2250F-1.9E Designed per ANSUTPI 1-2002 This design based an chord bracing applied m 1 0- 4- 9 375U 9.09' 3.73' BC 20 DFL 2400F-2-0E This design does not account for long term per the following schedule: tD 2 73. 7- a 3750 9.93. 3.73' WEB 2x4 DFL STUD Boos dependent leading(creep)_Bulldtng max o.c. from to 9RG 901trt9E sis-zs sham are beeed Gill? Lumber shear allowablesare perliDS. Designer must account far this. BC 120.00" 0.0-0 30.0.0 m on the cuss material at each bearing THIS DESIGN IS THE COMPOSITE RESULT OF Refer to Joint QC Detail Sheet for TC 24.00" 0-0-0 30.0-0 • En MULTIPLE LOAD CASES. iiaxlmum Rotational Tolerance used UPLIFT REACTION'S): Ce ponce axe. F0:0C.9.1Lorded for 10 PSF non-concurrent BCLL IACOBC truss pale values are based on Support CRC'Mind Hon-Wind m 1-2 -9224 0.37 0.27 0.44 Loaded for 200l non-concurrent moving testing and approval as required by 16C 1703 1 •800 lb m 2-3 -7092 0.09 0.50 0.59 BCLL and ANSUTPIand are reported in available 2 -BOO lb 3-4 -7097 0.09 0.50 0.39 ASCE7-05 SNOW LOAD DESIGN CRITERIA: documents as ER-1607 and ESR•t1 la. HORIZONTAL REACTION'S): 4-5 -0214 0.17 0.27 9.44 Pg=52 psi,Ce=1.0,I=1.0,Ct=1.10 This truss Is designed using the support I 2411h Designed fora post-frame hulleUng ASCE7-05 Wind Specification support 2 241 Ib n--' ne 703C1 act, arm car application. Bldg Endosed=Yes,importance Factor=0.B7 f9.) 6-7 7510 0.79 0.05 0.139 Truss Location=Nat End Zone CJ 7-3 5193 0.23 0.13 0.45 Hurrf®ne$Ocean Line=No,Exp Category=C --1 9-9 5193 0.2E 0.14 0.43 Bldg Length a 50.00 ft,Bldg Width a 30.00 ft 9-10 7570 0.79 9.05 0.84 Mean roof height=14.03ft,mph= 90 TN Low Hazard,Dead Load= 3.6 psi Jae rosea cat area ?Ossa cur Designed ss Main Wind Forma Resisting System 2-7 -1779 0.49 3-9 2050 0.59 -Love-rise and Component!and Cladding 1- 3-7 2050 0.49 4-9 -1779 0.49 Tributary Area=150snit (J1 MAXal DEFLECTION(span': w LP829 MEN B-9 (LIVE)LC i IV L=-0.42'D=-0.11"T=-0.54" NJ cn al =Joint Locations.= I 0-0.0 6 0.0-0 1--+ 2 9-1.14 7 10-5.4 t0 3 15-0-0 B 14-0.0 4 21-10-2 9 10-6-12 5 30-0.0 10 30-0-0 15-0-0 l 15-0-0 1 2 3 4 5 4.00 -4.00 I _ 15-9- RWSX8 1 ' Y/3X4 i de' 1 W3X4 5-7-14 5-7-14 1SH1P 3 W6X72 \V6X12 '244133...'"----7-",•j J�L_ m TO-7-14 For City Use Only CITY OP PLUS Project Number ;y x" Project Address pokane do.. a ° y 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. � Your application review TARGET DATE is t I ` OS The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07