Loading...
2010, 11-19 Permit: 1003780 Egress WindowsProcessed By: Mai, Jodi L PERMIT Printed Bv: MORRIS, HEATHER Page I of 1 PERMIT CENTER ari� SpOk 11703 Sprague Avenue. Suite B3 �Vg11ey su Spokane Valley. WA 99206 Site Information Project Information Site Address: 13006 E I OTH AVE Project Number: 10003780 Inv: 1 Issue Dale: 11/19/2010 Permit Use: INSTALL 2 EGRESS WINDOWS Parcel Number: 45223.0502 Subdivision: Applicant: TUNICK, GLENN &TRENEE Block: Lot: 13006 E 10TH AVE SPOKANE, WA 99206 Phone: (509) 927-7680 Zoning: R-3 SF Res Distnel Contact: TUNICK, GLENN & TRENEE Owner: TUNICK, GLENN & TRENEE 13006 E 10TH AVE Address: 13006 E IOTH AVE SPOKANE, WA 99206 Phone: (509)927-7680 SPOKANE, WA 99206 Setbacks - H'ront: Led: Right Rear: Building Inspector. SOUTH Water Dist: VERA Group Name: Project Name: Permits Building Perm ir Contractor: OWNER Lkmw#: OWNER PLAN REVIEW R3 VB 0 RESIDENTIAL PERMIT FEE $69.25 WSBCCSURCHARGE $4.50 Total Valuc: $600.00 SF PINS RVW< 7999 SQ FT $27.70 Total Permit Fee: $10145 FOR BUILDING INSPECTIONS CALL (509) 688-0054. Payment Summary Total Fees AmounlPaid AmountOwine 'Tran Date RecRim Payment Amt $101.45 $101,45 $0.00 11/12/2010 25066 $27.70 11/192010 25140 $73.75 Processed By: Mai, Jodi L PERMIT Printed Bv: MORRIS, HEATHER Page I of 1 NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING -when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection Includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of properly lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner s/pemlittee'a expense. FOUNDATION -when forms and reinforcement are in place and prior to placement of Concrete. PLUMBING - after rough -in, before covering, and final. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING -after all framing, bracing and blocking is In place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL -when complete and prior to occupancy and/or use. All permits require final Inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site Plan) required by ordinance or as a Condition of approval of this permit, Items such as the installation of fire hydrants, fire department access, on-site drainage ('208'swales), road improvements, parking and landscaping are Common requirements of a pembate plan which must be Completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails. Binding, etc, installed, and prior to occupancy, Completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover. RIGHT-OF-WAYIAPPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be Concealed by framing, drywall, concrete, etcmust be inspected prior to Cover. Check with the Building department for 'special inspections' in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different pads of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and Road cuN for utilities or driveways, City of Spokane Valley mechanical, City of Spokane Valley Building Division 688-0054 Public Works 688-0195 or State Dept of Transportation 324-6000 Peanas and lope tions tot And lndustnes 314-2bap of Ladw Perram and 477.Wi Spokane County Utilities seslm Perm6 and mspamons for a, an, septa syslerrs, Spokane Regional Fee sprinkler and alar who—and Vneale access da!mSpbions, sackane Valley Health Dtlnd 324-1 ask FR eeWrtmenl 99$.4102 Stale law ROw 19.122 redwres that one, to any eaara0on the 'CALL BEFORE YOU DIG center crust be noted Call delve yoo dip at least 2 rgM1mg days in advance,<.Udkd0 PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work Is finished, If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the pudding Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no workhas been d e under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is A, thtlraw r ca Cotied prior to the plan review being Completed. Owner/ Agent Date �� /All 40 Staff Approval Date