Loading...
2010, 11-16 Permit App: 10003780 Egress WindowsProject Number: 10003780 Inv: I Application Date: 11/16/2010 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Proiectlnformation:,x,�_.�,ku�,a�.. _ Permit Use: INSTALL 2 EGRESS WINDOWS Contact: TUNICK, GLENN & TRENEE Address: 13006 E 10111 AVE C - S - Z: SPOKANE, WA 99206 Setbacks: Front Left: Right: Rear: Phone: (509)927-7680 Group Name: Site Information: Project Name: _ _ _ Plat Key: 002962 Name: WOODWARD PARK ADD District: Sout Parcel Number: 45223.0502 Block: Lot: SiteAddress: 13006 E 10TH AVE Owner: Name: TUNICK, GLENN & TRENEE Location:: CSV Zoning: R-3 SF Res District Water District: 010 VERA Area: .00 Acres Width: 143 Nbrof Bldgs: 0 Nbrof Dwellings: 2 Review Information: Review Building Plan Review Address: 13006 E10TH AVE SPOKANE, WA 99206 Hold: ❑ Depth_ 155 Right Of Way (fir: 0 Released By: Originally Released: 11/15/1010 By: Imelbourn Permils: szxx:eausv +. ,sxs rrcarn mx±mxusm .. x_11 ss.am_a.smem:zxo.m+.r- ' ._'1—'--.zsm�xw•nrre -' Building Permit Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes So Ft Valuation Sa Ft Valuation 1&2 FAMILY R-3 VB PLAN 0 $600.00 0 $600.00 REVIEW Totals: 0 $600.00 0 $600.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $69.25 WSBCCSURCHARGE I SELECT $4.50 SF PLNS RV W a 7999 SO Fr I SELECT $27.70 Permit Total Fees: $101.45 Operator: jmm Printed By: JD Print Date: 11/16/2010 Project Number: 10003780 Inv: I Application Date: 11/16/2010 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Notes . ,...1'---"'—..-.'-- ,-.,,. _ .« I ----<— SITE ALSO INCLUDES EAST 13006 10TH AVENUE Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $101.45 $101.45 $27.70 $73.75 $101.45 $101.45 $27.70 $73.75 Disclaimer: Submittal of this application certifies the owner (or persons) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions or laws and/or regulations governing this type or work will be complied with. Subsequent issuance or a permit shall not be construed to be a permit for, or an approval of, any violation or any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 11/16/2010 Site Address: 13006 E 10TH AVE Parcel Number: 45223.0502 Zoning: R-3 Fire District., FD 01 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, \VA 99206 Phone: 509.688.0036 Water District: VERA Applicant: TUNICK, GLENN & TRENEE 13006 E 10TH AVE SPOKANE, WA 99206 (509)927-7680 e-mail: Contact: TUNICK. GLENN & TRENEE 13006 E 10TH AVE SPOKANE. WA 99206 (509)927-7680 e-mail: Contractor., OWNER ( ) - 0 Project INSTALL 2 EGRESS WINDOWS Description: Newpraj,, Previo rs-appmeedng El Plan re ... ene Transmittal Date: F 'day, NavembeN2, 2010 Project Number., 10003780 Owner: TUNICK. GLENN & TRENEE 13006 E 10TH AVE SPOKANE, WA 99206 e-mail: Occupant: e-mail: Arch / Engineer: e-mail: Please send all plan review and project comments via e-mail to the highlighted individuals. cm r &7'�O�V � 11703 E Spra; 11Alle Spokane V `�/7r,�, p�7 (5 00 •"�1 J r w W. okan1 Community Development �S Residential Constr ction Permit Application , rolaa SITE ADDRESS: ASSESSORS PARCEL NO: 'i T�LOEOa LEGAL DESCRIPTION: PERMIT NUMBER: PERMIT FEE: ❑ Accessory Bldg ❑ Deck Building Owner: Conn )� Contractor: r'4j, , TOTAL HABITABLE SPACE: Name: [i4ct� Name: Address: 13 oorp g lod+.. 4,.2 Address: City: Stater Zip: 6ivtb City: State: Zip: Phone: SOi -7t4 gys._3 Fax: Phone: Fax: Contractor Lic No: Exp Date: Contact Person City Business Lic. No: _ Name: Phone: oy -11y 94x3 Describe the scope of work in detail: Cost of Project: $ &00.cO 4 t,I— i -o 02 29r -ft W,yJowS cr c,Vc f d" Proposed Use: **************The followime MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: # OF TORIES: TOTAL HABITABLE SPACE: sof 34v4s x109 MAIN FLOOR TO SQ. 2 FLOOR SO. FTG: UNFIN BASEMENT SQ, FTG: IMPERVIOUS SURFACE FTG: ) 0 7 `) io) R - ... AREA: P tv I t - FINISHED BASEMENT GARAG. i SQ. FTG: DECKICOV. PATIO SQ. FTG: 30% SLOPES ON �� SQ. FTG: Io 5`- cC -3 If PROPERTY: fJ # OF BEDROOMS: CONST UCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? wea� lei r- Std The permitee verifies, acknowledges and agrees by their signature that t) If this permit is for construction of or on a dwelling, the dwelling istwill be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this trensadion. 4) All wnshuction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. ) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, Codes or ordinan . 6) Plans or ditional information may be required to be submitted, and subsequently approved before this application can In p s;pd. SIGNATURE: /—,// " ,' DATE Method of Payment: ❑ Cash Check Bankcard #: Authorized Signature: aenaEn vurw ❑ Mastercard ❑ VISA Expires: VIN#: RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. D SITE PLAN D Window and door location and sizes D Property lines and dimensions ❑ Setbacks to property lines D Direction arrow pointing North and orientation to streets Cl Distance between buildings D Proposed/existing buildings (footprint and dimensions) D Right of way/easement location & sizes D Utilities, septic tank/drain field locations and distances ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): D Footing sizes and locations D Supporting wood cripple walls or beams D Perimeter concrete foundation wall sizes D Thickened concrete pads supporting D Crawlspace ventilation ❑ Floor Plan of each level (finished or unfinished) with dimensions beams or girder trusses ❑ Floor Joist direction, size and spacing D Window and door location and sizes D Header, beam or concrete lintel sizes D Window well locations if applicable D Brace wall panel locations D Room usage labels D Water heater and furnace locations ❑ Smoke detector locations D Exhaust fan locations D Attic and crawl space access locations D Deck or concrete patio sizes and locations D Fire Wall construction ❑ Roof Plan: D Engineered truss direction and spacing D Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof D Slope/ roofing material/ underlaymenU ice dam protection D Sheathing size and type Ceiling D Joist size and spacing Wall D Height) top plate/ stud size and spacing/ sole plate D Exterior sheathing size and type Floor D Joist size and spacing Foundation Wall D Concrete or Masonry unit width ❑ Earth to wood separation distance Footing D Size Radon D Passive system with Emil vapor barrier Miscellaneous Construction Details ❑ Deck: D Floor plan/ side view/ dimensions ❑ Floor Joist/ decking direction, size and spacing D Ridge, eave and valley lines D Beam and girder size and location D Truss or rafter size, spacing & connection ❑ Attic insulation/ air space baffle/ ventilation D Size of ceiling gypsum wall board D Siding/ exterior house wrap/ anchor bolts D Insulation, vapor barrier, gypsum wall board ❑ Sheathing or concrete floor size/ insulation D Footing bottom to finished ground level depth ❑ Horizontal & vertical reinforcement if any D Reinforcement if any D Active system with 6 mil vapor barrier D Footings/ post/ and beam size and locations 11 Stairway tread rise & run and nosing ❑ Handrail / Guard height & spacing For City UseOn'y5 %YiU PLUS Project Number /0 � Project Address 137&OLa t /(X 11703 E Sprague Ave Suite B-3 1 Spokane Valley WA 99206 509.688.00361 Fax: 509.688.0037 4 permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Proieet Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed one individual with the expertisefor dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target dale. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specjfted on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE—APPLICANT PINK—BUILDING FILE ` REV W07