2006, 11-17 Permit: 06004575 Mechanical Fixtures,;oo-wVll�alley
BUILDING DIVISION
11707 E. Sprague Avenue, Suite 106
Spokane Valley, WA 99206
Site Information Project Information
Site Address: 13111 E 10 PH AVE Project Number: 06004575 Inv: I Issue Date: 11/172006
Permit Use: I FUEL BURNING APPLIANCE
Parcel Number:
45224.0937
Subdivision:
Block:
Lot:
Zoning:
UR -3 Urban Residential 3.5
Owner:
BLACK, HEAD PER M
Address:
13111 E 10TH AVE
SPOKANE VALLEY. WA 99216
Building Inspector: BOB RESCUE
Water Dist:
VERA
Applicant: CDA SHEET METAL & HTG INC
W. 4918 INDUSTRIAL WAY
COEUR D'ALENE, ID 83815 Phone: (208) 6644114
Contact: CDA SPITE 1METAL & HTG INC
W. 4918 INDUSTRIAL WAY
COEUR D'ALENE, ID 83815 Phone: (208) 664-4114
Setbacks - Front: Left: Right: Rear:
Group Name:
Project Name:
Permits
Mechanical Permit Contractor: CDA CUSTOM SELL I METAL& HTG Licensee; COEURDS972BL
GAS APPLIANCE1100,000BTU 1 $1500 PROCESSINGFEE $3500
Total Permit Fee: $50.00
FOR MECHANICAL INSPECTIONS CALL. (509) 688-0054.
Payment Summary
Total Fees AmmmtPaid AmountOwine Tran Date Recly Payment Amt
$50.00 $50.00 $0.00 11/17/2006 7733 $50.00
Processed By: Main, Jodi L PERMIT
Printed By: Maln.Jodi L Page I or I
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING -when forms and reinforcement are in place and prior to placement of concrete -all structures, Including manufactured homes.
NOTE: This inspection Includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance, Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions Iles solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property Innes. Please verify their location prior to locating your structure. Failure to
properly locale the structure may require its relocation at the owner s/pemlittee s expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - atter rough in, before covering, and final.
MECHANICAL- rough in of piping, before covering, metal chimneys before concealment, and final.
FRAMING - after all framing, braong and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL- when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this Inspection inclutles review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this peml Items such as the Installation of fire hydrants. fire department access.
on-site drainage ('208swales), road improvements, parking and landscaping are common requirements of a permo sits plan which most be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - Final Inspection required when complete, stairs, handrails, skirting, etcinstalled, and prior to occupancy:
completed Inspection record Card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-OF-WAV/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after Completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to Cover. Check with the Building department for "special inspections' in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and Road curb for utilities or driveways, City of Spokane Valley
mechanical, City of Spokane Valley Building Division 688-0054 Public Works 688-0195 or State Dept of Transportation
324-6000
If—" al mspeclions for eleuncer mnng Stale Depaomenl of Labor Germis aadmA,V,.nA or Sesser Cannabis'. SOokan¢ poorly VWilies b -do
And lnOmines 31.2.. 477zi
Penins and nspeclions 11 omzne zeal, zdrerrs, Spokane Regional Fire spnnkler and aaY, zyslen¢and pnvale access moo inspeclmnS slykane Valley
roam pond 314 is. Fire Depanmenl 892-4122
sane law RC W 19.122 rebates Incl pnor to any wriCanon the 'CALL BEFORE YOU DIG' center moal be nor.4M. Call before yon dig at leas, 3 wdM1ms nays in aovance, 15fiEo00.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared Void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after Me years from the date of permit issuance, regardless of whether the walk is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made In writing by the original per uctse to the Building Oficial no later than 1Be days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit Issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application Is withdrawn or Cancelled prior to the plan review being completed.
Owner / Agent Date
Staff Approval Date
City of Spokane Valley
Building Dept
Receipt
Receipt Number:
7733
Customer Number
Projects
Full
Project Nbr Inv Nbr
FeeAmt
InvAml
Owing
PAID
Pont
06004575 1
$50.00
$50.00
$50.00
$50.00
Total:
$50.00
$50.00
$50.00
$50.00
Miscellaneous Items
Total PAID:
$50.00
Tender
Tyne
Check Acct Balance CCNbr
Exp On
TENDERED
VISA
xxxxxxxxxxxx7320
03/2007
50.00
Payer:
Total TENDERED:
50.00
Over I(Short)
$0.00
Change
$0.00
Notes:
Tran Date/ Time:
11/17/2006 3:06:09 PM
By:
J_main
Logan User:
bldgdesk
Station:
CX_SV00015
Override By:
Printed: 1111712006 3:0&11 PM Page I of I