Boone E 10910 Classroom Addition & Office Remodel . • ~ ~ J • 1r ~ . ..~•r r~ . ' ' ~ , ~ . .
'
i - • ` ' ~ 1 1
, , ► t ;r~ ~ ! ~ .
j ~ . %1f j~.i~ ~ 1 r ♦
• ~s~ l - ' 77. - V . -a ' ~ ~ j.r11
1
, ft ~ L.~ ".0~~ ~ y~ ~ • + 1 ti, ,
~ • , " - • M
~ 1~ % • ~-y•Ms -tl'.~r~ t, . j
t~~, i ~ , . r i ~ 'r • ~ '~l 3~1{~ l:H;~ :r•:
. a ' , a - •
Ii ~
• ~ i ~ • - ; ~ y ~ 4~1
~ / 1 ' , ' .~st ; ..J i
~ - ' ~
R t~',,;;~ . s ; ,,,,,v l~ ; _ - - ' " _ - - ~ "K y'''`"~ s " .
~ ~ a - ~ ~ • ~ ~
' r ; . - , _ ~ ~ ' --'~r .
I y~~ • , ;`~~~st . ' ~ ~ i~.~ G,._-~
_ ~ , ~ ~ ;~►~7 .D' ~ ~ • ~
r ~ }+,,~~~~i :-L~-T
, N • - ` . 47 . : ~ CA
• • ~ 10►i3~t• ~ ~ ~ , ~ Lt y• 0 '
i i • •i• • , jo ~ ~ ~ ft• !
ro~ ,,,~'~+J , ~ . .,~ti _
' ~ G ` • ~ ' -
•
~J ~y~~ ~1,~'~.~ f
• ~ ~ e~ n" ~ o'~s + ~ • ~ ~ ~
~ - ~ tri
. ` ~ ' ` ►~'*j ~
:
r. ~ rt~ . ► t'
~ ~►13.
IS C~
9 • ' • ~
i ` -
.
NTti~
• ~ ~ , f' ~ 'i; 1~-
. ~ , .
~ ; , • • . . ~~r ` ~ , ~
~ ~ • _ • s + ,
~ ~ s ~ o ► G , ~ ~
• • ' 1~ • +1 11 ~ 1~'
~w' ' • ' ~
~ , 3 -o~ • • .
: ~ . ~,or,Y,b) G •
.3 ~ . . .
a .
~ . ~
• .
FtP , ~ .
wt A
+ 6
~
st
•;t:; .
. ~ • .
• ;i:; ' • 1 }
f: • ~ . ~ . ~ . ~
S ~
. , • ~
~ Spokane County
r
-DePartment of Building & Safety
~
JAMES L. MANSON, DIRECTOR
TO : Ken Jeffrey, Building and Safety
Bob McCann, Engineer's Office
John Pederson, Planning Department
Daryl Way, Health District
FROM: Tom Davis, Code Compliance Coordinator
Department of Building and Safety
DATE: June 3, 1987
RE : June 1, 1987 Pre-Construction Conference
Berean Bible Church - East 10910 Boone Avenue.
Enclosed is your copy of the minutes to the referenced meeting.
Should you have any questions or need additional information,
please feel free to contact me.
TLD:mas
cc: Dan Whittaker, Groesbeck - Pasold Architects
Jim Legat, Utilities Department
Dennis Scott, Public Works Director
NORTH 811 JEFFERSON ~ SPOKANE, WASHINGTON 9926000050 • TELEPHONE (509) 456-3675
~
.
' MINU'I'E$
PRE-CONSTRUCTION CONFERENCE
gERgAN BIBLE CHU'RCH - EAST 10910 BOONS AVENUB
JtJNE 1, 1987
CALL TO ORDER: The meeting was called to order at agproximately
10:00 a.m. by Building and Safety's Code Compliance Coordinator
Tom Davis, with the following in attendance.
PERMIT REVIEW PARTICIPANTS:
Tom Davis, Building and Safety
Ken Jeffrey, Building and Safety
Bob McCann, Engineers Off ice
John Pederson, Planning Department
Marla Stach, Building and Safety
D3ry1 Way, Health District
APPLICANT:
Dan Whittaker, Groesbeck - Pasold Architects
SCOPE/PROJECT DESCRIPTION:
The applicant is proposing a 4,008 square foot addition to the
existing chapel for the purpose of classrooms and office space.
Part of the addition will be two stories. Classes will be
conducted on Sunday mornings and are not intended for academic
use.
Currently the congregation consists of approximately 800 members.
SUMMARY OF DEPARTNMUAL REQUIRF.MENTS:
1. Building and Safety (456-3675)
~
A. Discussion/Requirements
1. Buiiding and Saf^ t-v had comoleted the plan revievi
for this project and comments were mailed to the
applicant prior zio the meeting
2. Plan review for UBC Compliance was made on the
basis that the classroom usage was for Sunday
school and not for academic purposes.
3. The applicant submitted an addendum at the meetinq
to Building and Safety addressing comments.
. , i
4. A SEPA Checklist was completed previously for the
church which identified that future additions were
being planned. Therefore a checklist for this
project is not required.
B. Permit Release Requirements
1. Upon completion of the review of the addendum
submitted, Building and Safety will be ready to
sign off the permit
2. Verif ication of the location of f ire hydrants f rom
Fire District No. 1 regarding fire f low is
required.
2. Engineers Off ice (456-3600)
A. Discussion/Requirements
l. The Engineer's Off ice has signed off the permit.
3. Health District (456-6040)
A. Discussion/Requirements
1. No academic classes are taking place at this time.
Daryl Way gave the applicant a copy of the
regulations for academic teaching facilities regarding sewage systems, should the church decide
to do teaching of an academic nature at a future
date.
2. The Health District's f iles contain on-site sewage
permits for the original facility constructed in
1967 and several additional sewage permits were
issued in 1969, 1972 and 1984 for expansion of the
church complex. In 1972, a gymnasium and
classrooms were constructed involving the
relocation of the sewage system installed in 1969,
however, the Health District has no record
indicating the new location of the system.
3. The Health District will need to make a
determination based on occupant load on whether
the capacity of the present system is sufficient
to accommodate the proposed addition.
B. Permit Release Requirements
1. An "as built" on-site utility 'plan for the
property is to be provided to the Health District
in oru~r to clarify the locatior:s of the current
sewage systems.
1 , ' •
~ • .
2. The occupant load is required to be submitted.
Depending on the occupant load versus the capacity ~
of the existing sewage systems, expansion of the
system may be required.
4. Planning Department (456-2205)
A. Discussion/Requirements
1. This property is zoned agricultural, 65 percent
of the lot is to be open space in this type of
zone.
2. A determination on the number of parking spaces
required needs to be made based on the number of
seats in the assembly room (1 stall for every 5
seats), as well as number of classrooms and
teaching stations.
B. Permit Release Requirements
l. A lot line adjustment is required in order to ~
bring the two parcels into one parcel.
2. Illustrate the required parking stalls as
determined by Planning on the site plan. (A copy
of the site plan submitted for the building permit
for the church in 1984 was given to Planning to
assist in determining parking requirements).
3. The number of classrooms/teaching stations needs
to
be provided.
4. Identify set backs on the site plan.
~
5. Utilities (4~0-3604)
r.. = iscuss
Jt11it1CS 1:e
any comments submitted.
REQUIRED ACTIONS: County_
l. Tom Davis to review Building and Safety files for drainage
requirements identif ied on permit 84A-1732 for the church.
ADJO : There being no further business, Tom Davis thanked
the applicant and the departments for their participation and
r,r-7~.~ hi. shou',.- be arE' 3P~.
~
_ . - _ . - ' . . . . . . . f_' - . . . .
~
l
. - • ~
The meeting was adjourned at approximately 10:35 a.m.
Copies of Minutes to: All participants
File - Berean Bible Church
East 10910 Boone Avenue
~
. Spokane County
Department of Buildin & Safet
~ ~ Y
~ . JAMES L. MANSON, DIRECTOR
June 12, 1987
Berean Bible Church
East 10910 Boone Avenue
Spokane, Washington 99206
RE: Building Permit 84A-1732 - Church
Gentlemen:
In the process of reviewing your building permit application for
an addition to the existing chapel, we find that our records do
not indicate that a final certif icate of occupancy was issued for
the church. However, a temporary certificate of occupancy was
issued on November 260 1984 for a period of six months only.
According to the conditions placed on your building permit for
the church (permit number 84A-1732), the required parking areas
were designed and shown on the site development plan to include
stormwater drainage swales.
From an on-site review, the parking area located off of Desmet
was installed in a different manner than what was submitted on
the original site plan. Also, the drainaqe swales have not been
completed.
In order to clarify this matter, a revised drainaqe plan showing
the redesiqned and constructed facilities, along with the
drainage calculations, will need to be submitted to the County
Engineer's Office for review and approval. Your contact person
in the Engineer's Office is Gary Nelson (456-3600).
The intent of this letter is to advise you of the situation in
order that a final certificate of occupancy may be issued for the
church. In no way will this matter affect nor cause any delay in
the issuance of your permit for the addition currently beinq
processed.
~ J
NORTH 811 JEFFERSON • SPOKANE, WASHINGTON 9926000050 ~ TELEPHONE (509) 456-3675
{ . .
/00" ~
$er'eaII $lbl.e C1'1L1rCh
JuY1e 12, 1987
Page 2 of 2
~
Your attent'ion in this matter will be appreciated. If we can be
of any assistance to you, please f~el free to contact me at
456-3575.
sincerely yotxrs,
DEPARTMEN"I' OF BUILDING AND SAFETY
''hoY'#1a5 L. Dav1S
Code Compliance Coardinator
TLD:pjk