Loading...
Boone E 10910 Classroom Addition & Office Remodel . • ~ ~ J • 1r ~ . ..~•r r~ . ' ' ~ , ~ . . ' i - • ` ' ~ 1 1 , , ► t ;r~ ~ ! ~ . j ~ . %1f j~.i~ ~ 1 r ♦ • ~s~ l - ' 77. - V . -a ' ~ ~ j.r11 1 , ft ~ L.~ ".0~~ ~ y~ ~ • + 1 ti, , ~ • , " - • M ~ 1~ % • ~-y•Ms -tl'.~r~ t, . j t~~, i ~ , . r i ~ 'r • ~ '~l 3~1{~ l:H;~ :r•: . a ' , a - • Ii ~ • ~ i ~ • - ; ~ y ~ 4~1 ~ / 1 ' , ' .~st ; ..J i ~ - ' ~ R t~',,;;~ . s ; ,,,,,v l~ ; _ - - ' " _ - - ~ "K y'''`"~ s " . ~ ~ a - ~ ~ • ~ ~ ' r ; . - , _ ~ ~ ' --'~r . I y~~ • , ;`~~~st . ' ~ ~ i~.~ G,._-~ _ ~ , ~ ~ ;~►~7 .D' ~ ~ • ~ r ~ }+,,~~~~i :-L~-T , N • - ` . 47 . : ~ CA • • ~ 10►i3~t• ~ ~ ~ , ~ Lt y• 0 ' i i • •i• • , jo ~ ~ ~ ft• ! ro~ ,,,~'~+J , ~ . .,~ti _ ' ~ G ` • ~ ' - • ~J ~y~~ ~1,~'~.~ f • ~ ~ e~ n" ~ o'~s + ~ • ~ ~ ~ ~ - ~ tri . ` ~ ' ` ►~'*j ~ : r. ~ rt~ . ► t' ~ ~►13. IS C~ 9 • ' • ~ i ` - . NTti~ • ~ ~ , f' ~ 'i; 1~- . ~ , . ~ ; , • • . . ~~r ` ~ , ~ ~ ~ • _ • s + , ~ ~ s ~ o ► G , ~ ~ • • ' 1~ • +1 11 ~ 1~' ~w' ' • ' ~ ~ , 3 -o~ • • . : ~ . ~,or,Y,b) G • .3 ~ . . . a . ~ . ~ • . FtP , ~ . wt A + 6 ~ st •;t:; . . ~ • . • ;i:; ' • 1 } f: • ~ . ~ . ~ . ~ S ~ . , • ~ ~ Spokane County r -DePartment of Building & Safety ~ JAMES L. MANSON, DIRECTOR TO : Ken Jeffrey, Building and Safety Bob McCann, Engineer's Office John Pederson, Planning Department Daryl Way, Health District FROM: Tom Davis, Code Compliance Coordinator Department of Building and Safety DATE: June 3, 1987 RE : June 1, 1987 Pre-Construction Conference Berean Bible Church - East 10910 Boone Avenue. Enclosed is your copy of the minutes to the referenced meeting. Should you have any questions or need additional information, please feel free to contact me. TLD:mas cc: Dan Whittaker, Groesbeck - Pasold Architects Jim Legat, Utilities Department Dennis Scott, Public Works Director NORTH 811 JEFFERSON ~ SPOKANE, WASHINGTON 9926000050 • TELEPHONE (509) 456-3675 ~ . ' MINU'I'E$ PRE-CONSTRUCTION CONFERENCE gERgAN BIBLE CHU'RCH - EAST 10910 BOONS AVENUB JtJNE 1, 1987 CALL TO ORDER: The meeting was called to order at agproximately 10:00 a.m. by Building and Safety's Code Compliance Coordinator Tom Davis, with the following in attendance. PERMIT REVIEW PARTICIPANTS: Tom Davis, Building and Safety Ken Jeffrey, Building and Safety Bob McCann, Engineers Off ice John Pederson, Planning Department Marla Stach, Building and Safety D3ry1 Way, Health District APPLICANT: Dan Whittaker, Groesbeck - Pasold Architects SCOPE/PROJECT DESCRIPTION: The applicant is proposing a 4,008 square foot addition to the existing chapel for the purpose of classrooms and office space. Part of the addition will be two stories. Classes will be conducted on Sunday mornings and are not intended for academic use. Currently the congregation consists of approximately 800 members. SUMMARY OF DEPARTNMUAL REQUIRF.MENTS: 1. Building and Safety (456-3675) ~ A. Discussion/Requirements 1. Buiiding and Saf^ t-v had comoleted the plan revievi for this project and comments were mailed to the applicant prior zio the meeting 2. Plan review for UBC Compliance was made on the basis that the classroom usage was for Sunday school and not for academic purposes. 3. The applicant submitted an addendum at the meetinq to Building and Safety addressing comments. . , i 4. A SEPA Checklist was completed previously for the church which identified that future additions were being planned. Therefore a checklist for this project is not required. B. Permit Release Requirements 1. Upon completion of the review of the addendum submitted, Building and Safety will be ready to sign off the permit 2. Verif ication of the location of f ire hydrants f rom Fire District No. 1 regarding fire f low is required. 2. Engineers Off ice (456-3600) A. Discussion/Requirements l. The Engineer's Off ice has signed off the permit. 3. Health District (456-6040) A. Discussion/Requirements 1. No academic classes are taking place at this time. Daryl Way gave the applicant a copy of the regulations for academic teaching facilities regarding sewage systems, should the church decide to do teaching of an academic nature at a future date. 2. The Health District's f iles contain on-site sewage permits for the original facility constructed in 1967 and several additional sewage permits were issued in 1969, 1972 and 1984 for expansion of the church complex. In 1972, a gymnasium and classrooms were constructed involving the relocation of the sewage system installed in 1969, however, the Health District has no record indicating the new location of the system. 3. The Health District will need to make a determination based on occupant load on whether the capacity of the present system is sufficient to accommodate the proposed addition. B. Permit Release Requirements 1. An "as built" on-site utility 'plan for the property is to be provided to the Health District in oru~r to clarify the locatior:s of the current sewage systems. 1 , ' • ~ • . 2. The occupant load is required to be submitted. Depending on the occupant load versus the capacity ~ of the existing sewage systems, expansion of the system may be required. 4. Planning Department (456-2205) A. Discussion/Requirements 1. This property is zoned agricultural, 65 percent of the lot is to be open space in this type of zone. 2. A determination on the number of parking spaces required needs to be made based on the number of seats in the assembly room (1 stall for every 5 seats), as well as number of classrooms and teaching stations. B. Permit Release Requirements l. A lot line adjustment is required in order to ~ bring the two parcels into one parcel. 2. Illustrate the required parking stalls as determined by Planning on the site plan. (A copy of the site plan submitted for the building permit for the church in 1984 was given to Planning to assist in determining parking requirements). 3. The number of classrooms/teaching stations needs to be provided. 4. Identify set backs on the site plan. ~ 5. Utilities (4~0-3604) r.. = iscuss Jt11it1CS 1:e any comments submitted. REQUIRED ACTIONS: County_ l. Tom Davis to review Building and Safety files for drainage requirements identif ied on permit 84A-1732 for the church. ADJO : There being no further business, Tom Davis thanked the applicant and the departments for their participation and r,r-7~.~ hi. shou',.- be arE' 3P~. ~ _ . - _ . - ' . . . . . . . f_' - . . . . ~ l . - • ~ The meeting was adjourned at approximately 10:35 a.m. Copies of Minutes to: All participants File - Berean Bible Church East 10910 Boone Avenue ~ . Spokane County Department of Buildin & Safet ~ ~ Y ~ . JAMES L. MANSON, DIRECTOR June 12, 1987 Berean Bible Church East 10910 Boone Avenue Spokane, Washington 99206 RE: Building Permit 84A-1732 - Church Gentlemen: In the process of reviewing your building permit application for an addition to the existing chapel, we find that our records do not indicate that a final certif icate of occupancy was issued for the church. However, a temporary certificate of occupancy was issued on November 260 1984 for a period of six months only. According to the conditions placed on your building permit for the church (permit number 84A-1732), the required parking areas were designed and shown on the site development plan to include stormwater drainage swales. From an on-site review, the parking area located off of Desmet was installed in a different manner than what was submitted on the original site plan. Also, the drainaqe swales have not been completed. In order to clarify this matter, a revised drainaqe plan showing the redesiqned and constructed facilities, along with the drainage calculations, will need to be submitted to the County Engineer's Office for review and approval. Your contact person in the Engineer's Office is Gary Nelson (456-3600). The intent of this letter is to advise you of the situation in order that a final certificate of occupancy may be issued for the church. In no way will this matter affect nor cause any delay in the issuance of your permit for the addition currently beinq processed. ~ J NORTH 811 JEFFERSON • SPOKANE, WASHINGTON 9926000050 ~ TELEPHONE (509) 456-3675 { . . /00" ~ $er'eaII $lbl.e C1'1L1rCh JuY1e 12, 1987 Page 2 of 2 ~ Your attent'ion in this matter will be appreciated. If we can be of any assistance to you, please f~el free to contact me at 456-3575. sincerely yotxrs, DEPARTMEN"I' OF BUILDING AND SAFETY ''hoY'#1a5 L. Dav1S Code Compliance Coardinator TLD:pjk cc f Gary Nelson, Engineer ' s Of f ice ~ .