Loading...
2010, 09-10 Permit App: 10002761 Canopy , Project Number: 10002761 Inv: 1 Application Date: 9/10/2010 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: _.. Permit Use: FRONT PORCH CANOPY Contact: WOLF,DAVID Address: 14911 E 11TH AVE C-S-Z: SPOKANE VALLEY,WA 99037 Setbacks:Front Left: Right: Rear: Phone: (509)483-5249 Group Name: Site Information: Project Name: Plat Key: CONV Name: CONVERTED CNTY DATA District: East Parcel Number: 45234.5102 Block: Lot: SiteAddress: 14911 E 11TH AVE Owner:Name: WOLF,DAVID Address: 14911 E 11TH AVE Location::CSV SPOKANE VALLEY,WA 99037 Zoning: R-3 SF Res District Water District: 010 VERA Hold: ❑ Area: .00 Acres Width: 80 Depth: 125 Right Of Way(ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 10 Review Information: ,,,w � Review Building Plan Review Released By: Originally Released: 9/7/2010 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 9/10/2010 By: lbarlow Permits: •..m Operator: jmm Printed By: JD Print Date: 9/10/2010 , Project Number: 10002761 Inv: 1 Application Date: 9/10/2010 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes Si Ft Valuation Sq Ft Valuation COV DECK R-3 VB PLAN 0 $2,000.00 0 $2,000.00 REVIEW FEE Totals: 0 $2,000.00 0 $2,000.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $69.25 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $27.70 Permit Total Fees: $101.45 Notes: .y _ r_ Issued home occupation exemption,Brandon Wolf,Rustic Construction,office work,bookkeeping Payment Summary• :, Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $101.45 $101.45 $27.70 $73.75 $101.45 $101.45 $27.70 $73.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 9/10/2010 f G1171011131L,C11LG1 of -,, 11703 E Sprague Ave, Suite R-3 PERMIT NUMBER: Spcnokane Spokane Valley,WA 99206 . PERMIT FEE: Valley. (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org Community Development Residential Construction New Construction Accessory Bldg \ICPermit Application - Addition/Remodel Deck -.-= Other: port k C,#1.0 SITE ADDRESS: /VW/ . -- //f�. ASSESSORS PARCEL NO: LEGAL DESCRIPTION: S/!O (S /d % dam c Building Owner: Contractor: �/ Name: �A-t/l b Wotc- Name: Address` y t E -L Address: City: seaI ~ c State:("044 Zip: 0037 City: State: Zip: Phone: 5O - 9 (-- (�9�y$ Fax: Phone: Fax: Contractor Lic No: Exp Date: Contact Person City Business Lic.No: Name: IQ^,,uSCS COO(- Phone: q 1t(- 85'1E3 Describe the scope of work in detail: Cost of Project: $ sfi„ fid Eger- PO r ck mho 10(91 Proposed Use: P«L Cuy.o r **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS:, #OF STORIES: x/G�1- TOTAL HAABLE SPACE: r ' 47,.. MAIN FLOORTOSQ. 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: /7f& 4771- - AREA: FINISHED BASEMENT GARAGE SQ. FTG: DE( K/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: )1./;,' ,tY,4- Z )® PROPERTY: Ai� #OF BEDROOMS: CONSTRUCTIQN TYPE: HEAT Se•- - :— --' SEWER OR SEPTIC? The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws,codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before this application can be processed. SIGNATURE (i -- DATE: 9 3-70 Method of Payment: ❑ Cash heck 0 Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/15/07 r1t PLANNING DEPT. A ' • • : , E$______ ___ BY: — Lis), 1 1 DATE: '-c_.\ �c�,20v 0. t___ i , ? i /y9// // 1 E7A-<J -/09r /cl c� _.- — 30' I I a -- — i 16' 1 i , ...,c ,?opo<, „-- , i 1 /,,2 i VSft.,,u✓u 1 3111,130S S 311411 a31OAa3H OOZ 66E et 3HVnOSS ill FIM 03 I 7133 Mt Z6E-Zt i HVnos s,,JSV3-3A3 S130-IS E'az BBCet, 3HVnpurag,,,,Ieuoi OS S,m3„V3-3A3 S133HS IDOL CBE I 3H1/11OS S„3SV3-3A3 S1334 IS OS tOti-ZC 3HVnOSS H31']I3'S133HS OOS ZBL-El 13-782 500 SHEETS.FILLER 5 SQUARE 42-381 50 SHEETS EYE-EASEp'5 SQUARE NINIENationarBrand AM A2 389 200 SHEETS EYE EASE 5 SQUARE 42-392 100 RECYCLED WHITE 5 SQUARE 42-399 200 RECYCLED WHITE 5 SQUARE 44444 m u s n. aie,Z - -. + '..c---P ____, X/91,0 y»� 1..,'S d-.-�J 9/,$--,5 .-j 1 J7 ;,f/ //G✓-/7/ _))o/v\ Gin/Q !t- ! l rt 4 1 )_I 3r - / / [ I3-752 E00 I ICFTS Eli I,0 •SO,,A11' 4E1,31 50 Srirri-:;ST FAO'55 I, _4:....„ 4E-392 100 SF1EF FS EfF-PASI 11,5Yal,E111. .-744-- ilabonai58raou, ,*i'l ?CO SHEETS EYE EAS'Is E SOLJA1;E ii:2?)'" 7/Y69 4,,'nln I!,C'Pi-CY,,.7)Vd1,15) 'SO,O E • ---z I r 0'A,II ft E:OE., r --4 --;-) ,) .,,,) -?•f•{4:jv I - -----1 -- -- _ ,• ._ --1- 1 - _, ---_____"„ -• 1 , I . ,---. - P , . J I „N --.:.•.2,:,)J. `,....---,..r),(::).....D .. I ,. ,44 , _ r-- ,i, .-- 1 . , .- - _- __-- i _ 1 1 ____ 1 -,. 7i-,-.2 4 __. , -, S ->' :'' ...,r - [50 go 9 14 / 1 I...L.,,9 ,. - ... ------, . , , 0 271 I 1 /1-70/.,2,?42,../52.._ 1, ' ---11T----- ------- •-7-0 i• / -- -- S4 ___- -,1 , N.1 - if d --cid Al : ._-- ___ . IIC 5; (-)La79;- )'ic)) i I -;-- - evir.......-.10 9essi ..- T . • ...-- _ ---- _-- ra ' , '_---- \ - -- -----c7 _ ------___, •.;.,, s, li,rs"-----.„,:---- .,-, ..,„..- „.----- ---":1 „.-------- i ' ...- ___ _„4.--.----7------- ___ __--- 1 : __---- .. • k., / 2,.„275--- ,...--------... „.. _-- __ ___.__ _ , For City Use Only PLUS Project Number /0 r(.4 CITY40000 SpOkane alley 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 50 9.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete,it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE—APPLICANT PINK—BUILDING FILE REV 9/07