Loading...
2009, 03-27 Permit: 09000760 Tear Off, Reroof • SPD / e ~ BUILDING DIVISION isofiley 11703 E. Sprague Avenue, Suite B-3 ��''JJ Spokane Valley,WA 99206 Site Information Project Information Site Address: 13310 E 10111 AVE Project Number: 09000760 Inv: 1 Issue Date: 03/27/2009 Permit Use: TEAR OFF RE-ROOF Parcel Number: 45224.1324 Subdivision: Applicant: JIMMY'S ROOFING Block: Lot: 2303 N CENTER Zoning: R-3 SF Res DistrictSPOKANE VALLEY WA 99212 Phone: (509)924-1989 Contact: JIMMY'S ROOFING Owner: MOREI IOUSE,SANDRA/ROBERT/ARLY 2303 N CENTER Address: 13310 E 10TH AVE SPOKANE VALLEY WA 99212 Phone: (509)924-1989 SPOKANE.WA 99216-0615 Setbacks-Front: Left: Right: Rear: Building Inspector: SOUTH Water Dist: VERA Group Name: Project Name: Permits Building Penni! Contractor: JIMMY'S ROOFING License#: JIMMYR'933LM TEAR OFF RE- R-3 VB 0 RESIDENTIAL.PERMIT FEE $I8I25 ROOF WSBCC SURCHARGE $4.50 Total Value: $10.000.00 Total Permit Fee $18575 FOR BUILDING INSPECTIONS CALL(509)688-0054. Payment Summary Total Fees AmountPaid AmountOwinv Tran Date Receipt d Payment Amt $185.75 $185.75 $0.00 03/27/2009 17702 $185.75 Processed By: DAVIS,JENNA PERMIT Printed By: PATRICIA PRINCE Page 1 of 1 NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum,the following inspections ARE REQUIRED by City Code: FOOTING-when farms and reinforcement are in place and prior to placement of concrete-all structures,including manufactured homes. NOTE:This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of properly lines.The responsibility to comply with applicable setback provisions lies solely with the permittee-neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owners/permittee's expense. FOUNDATION-when forms and reinforcement are in place and prior l0 placement of concrete. PLUMBING-after rough-in,before covering,and final. MECHANICAL-rough in of piping,before covering,metal chimneys before concealment,and final. FRAMING-atter all framing, bracing and blocking is in place, rough electrical,plumbing and mechanical systems are complete,and prior to concealing. FINAL-when complete and prior to occupancy and/or use.All permits require final inspection. NOTE: In addition to inspection of the structure,this inspection includes review of site improvements gypically depicted on the approved site plan)required by ordinance or as a condition of approval of this permit.Items such as the installation of fire hydrants.fire department access, on-site drainage('208'swales),road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES-Final inspection required when complete.stairs,handrails,skirting, etc.installed,and prior to occupancy: completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS-prior to cover. RIGHT-OF-WAY/APPROACH-prior to placement of concrete/asphalt or,if gravel approach,after completion. In addition to the above,any plumbing or mechanical systems or material which would be concealed by framing.drywall,concrete,etc.must be inspected prior to cover. Check with the Building department for"special inspections'in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building,plumbing(includes interior reversals for sewer)and Road cuts for utilities or driveways, City of Spokane Valley mechanical,City of Spokane Valley Building Division 688-0054 Public Works 688-0195 or State Dept of Transportation 324-6000 Penns and inspections for electrical w nng.Stale Depanmeni or LaOor Permits and inspections foe Sewer Connection.Spokane County !fiddles Denson And industries 324.2640 471-3601 Parents and inspections la on-she sepec systems.sposane Regional Foe spnnkeer and alarm systems and pnvale access road inspections.spoken Va'Ry Health Dislnci 324:560 Erre Oerarlmenl 692-4122 Stele law ROW 19 122 regmres that pnor to any evca✓eaon Ile'CALL BEFORE YOU DIG'center most be noblescan before you dig at least 2 wnrking days in advance.4568000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a)work is not started within 180 days of obtaining a permit,or b)work is abandoned for 180 days or more after beginning work,or c)after two years from the date of permit issuance,regardless of whether the work is finished. If a permit is expired for time,a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100%refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80%of a permit fee may be authorized when no work has been done under the permit issued.Refunds of not more than 80%of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner/Agent Date Staff Approval Date City of Spokane Valley Building Dept Receipt Receipt Number: 2E+04 Customer Number Projects Full Project Nbr Inv Nbr Fee Amt Inv Amt Owing PAID Pint 09000760 1 $185.75 $185.75 $185.75 $185.75 0 Total: $185.75 $185.75 $185.75 $185.75 Miscellaneous Items Total PAID: $185.75 Tender Type Check Acct Balance CC Nbr Exp Date TENDERED VISA xxxxxxxxxxxx9449 11/2010 185.75 Payer: Total TENDERED: 185.75 Over /(Short) $0.00 Change $0.00 Notes: Tran Date/Time: 03/27/2009 4:40:21 PM By: PLPRINCE Logan User: BldgCounler Station: CX_WI_g1I-DH3gJM114E Override By: Printed: 03/27/1009 4:40:13 PM Page I of I