2010, 03-29 Permit: 10000831 Mechanical FixturesSpokane
jVa11eys
PERMIT CENTER
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Site Information Project Information
Site Address: 13311 E WITH AVE
Parcel Number:
45224.1051
Subdivision:
Block:
Lot:
Zoning:
R-3 SP Be, Disaict
Owner:
STEWART, DONALD L & JUDITH M
Address:
13311 E IOTH AVE
S37 00
SPOKANE VALLEY, WA 99216-0615
Building Inspector:
SOUTH
Water Dist
VERA
Project Number: 10000831 Inv: I Issue Date: 0329/2010
Permit Use: 1 FUEL BURNING APPLIANCE, 1 GAS PIPING
Applicant ANDERSON'S HEATING & PLUMBING
E 13903 TRENT
SPOKANE VALLEY WA 99216 Phone: (509) 928-0960
Contact: ANDERSON'S HEATING & PLUMBING
E 13903 TRENT
SPOKANE VALLEY WA 99216 Phone: (509)928-0960
Setbacks - Front: Left: Right: Rear:
Croup Name:
Project Name:
Processed By: Main, Jodi L PERMIT
Printed By: MORRIS. HEATHER Page I of 1
Permits
Mechanical Permit
Contractor: ANDERSON$ SHEET METAL HTG&AC License N: ANDERSM94797
GAS APPLIANCE,100,OWBT I
SON)
GASPIPING 1 5100
PROCESSING FEE
S37 00
Total Permit Fee: $51.00
FOR MECHANICAL INSPECTIONS CALL (509) 688-0054.
Payment Summary
Total Fees AmounlPaid
AmountOwine Tran Date
Recce
Pavment Amt
$51,00 $51,00
$0.00 03/292010
22185
$51.00
Processed By: Main, Jodi L PERMIT
Printed By: MORRIS. HEATHER Page I of 1
NOTICE
The ownership of a Spokane Valley Development Penn it will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicarrUpermittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain pads of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING -when forms and reinforcement are in place and prior to placement of concrete -all structures. Including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verity their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner'slpermittee's expense.
FOUNDATION - when forms and reinforcement are In place and prior to placement of concrete.
PLUMBING -after rough -in, before covering, and final.
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING - after all framing, brazing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL- when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by Ordinance or as a condition of approval of this permit Items such as the Installation of fire hydrants, fire department access,
on-site drainage ('208'swales), road improvements, parking and landscaping are Common requirements of a permitlate plan which must be
completed prior to final approval of a building or Issuance of a Certificate of Occupancy.
MANUFACTURED HOMES- Final Inspection required when Complete, stairs, hantlrails, skirting, etc. installed, and prior to occupancy:
completed Inspection record rartl must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to Cover.
RIGHT-OP-WAYIAP PROACH- prior to placement of coneretelasphalt or, If gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to Cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working col hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and Road cuts for utilities or driveways, City of Spokane Valley
mechanical, City of Spokane Valley Building Division 688-0054 Public Works 688-0195 or State Dept of Transportation
324-6000
Pemll: and mapecoonafor declined wnng, able Depanm<nmr labor Pennee and laddecn:rus<wer cannel sooble- Counry denhaa PNvm
And mbusnes 324-2G0 477.]6na
Pnmb and ind,nans ry on.<n<s<aids noterrs, spaxane a<plore Flrt ronnw<, and all iHIlnm and pdvab access mad nzpeNons. spoonevalbv
Neale aamtl sza.IsfA Fire Depanmem aeb4122
sbl<law RCw a 122,ee res 1.1 prior to any e.ravanon 11A 'CALL w1cals voo ulG denier noel be modemcall detore you dig at eaar 2 woM1Ng date in advanee, 4daLa0 o.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 18D days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after Me years from the date of permit issuance, regardless of whether the work is
finished If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original perm iliac to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously da to or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being Completed.
Owner/Agent Date
Staff Approval Date
City of Spokane Valley
Building Dept
Receipt
Receipt Number:
22185
Customer Number
Projects
Full
ProjectNb Inv Nbr
FeeAmt Inv Amt
Owing
PAID Pmt
10000831 1
$51.00 $51.00
$51.00
$51.00 Ld
Total:
$51.00 $51.00
$51.00
$51.00
Miscellaneous Items
Total PAID:
$51.00
Tender
Type
Check Acct Balance CC Nbr
Exp Date
TENDERF,D
VISA
xxxxxxxxxxxx1602
08/2011
51.00
Payer:
Total TENDERED:
51.00
Over
I (Short)
$0.00
Change
$0.00
Notes:
Tran Date /Time:
03/29/2010 12:47:04 PM
By:
HMORRIS
Logon User:
BldgCounter
Station:
CX_SV00014A
Override By:
Printed: 0312 912 010 12:47:04 PM