2013, 11-14 Permit App: BLD-2013-2369 Storage Bldg Community Development Department (Staff Use Only)
Permit Center
11703 East Sprague Avenue,Suite B-3 PERMIT NUMBER:
SCITY iie Spokane Valley, WA 99206
G Tel: (509) 688-0036 PERMIT FEE:
J Fax: (509)688-0037
\-alkY permitcenter@saokanevalley.orq
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
El NEW CONSTRUCTION El ADDITION/REMODEL ,1EL ACCESSORY B ILD N
❑ DECK ❑ OTHER Project # •
�. � _ V - �.*
SITE ADDRESS: IS-706 E 10.1.. CEI . D
ASSESSORS PARCEL NO.: 4-15-2.1-13.005 LEGAL DESCRIPTI1N:
BUILDING OWNER NAME:
`^
NAME: KOYJ��( � 1 G-CLQ<1 CSV PERMIT CENTER
ADDRESS: [ `7 16` SUB j r R E U, J
CITY: kw-1E " A y STATE: VJhA'1 ZIP: "q1037---
1 i
PHONE: \\ FAX: CELL:
CONTACT NAME: l� /�
PHONE: 509 - Sr - )L s7 FAX: Sb_( - ��-qs1.�27 CELL:
CONTRACTOR NAME: ��- Coy1 4 C , (-}i )A 0c f cz a.n
MAILING ADDRESS: 2-5 l. �C�� �{ i\
CITY: Gtr 11 STATE: W ZIP: n&
PHONE: 50(4-9 22-Y-902.7 �!�/ /� (9
FAX: s-- 92. -1- 9m7 CELL: 5-09-9.5 - 0 37 C/
CONTRACTOR LICENSE No.:(CD! ) Q iJ 7//l// EXPIRES: (/2c.1 5 CITY BUSINESS LICENSE NO.: (0C2 6'32. i b
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak: Dimensions: No.of Stories:
Total Habitably
Z�x1-1CJ Space:
Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ Finished Basement SQ
FT: FT:
Garage SQ FT: Deck/Covered Patio SQ Impervious Surface 30%Slopes on
FT: _ Area: Property:
No.of Bedrooms: Construction Type:FcA Heat Source: ------- Sewer or Septic:
TOTAL COST OF PROJECT: $ Z I ,SSS Co
DISCLAIMER
The permitted verifies,acknowledges and agrees by their signature that: 1)if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws,codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Effective October 28, 2007 Page 1 of 2
P:\Community Development\02 Administration\03 Forms-Official Versions\Permit Center\Residential Construction Permit
App 10.28.07.doc
Project # _ ���� Residential Driveway
►�pO�e RECEIVED - PAVING WAIVER
J NUV 1 8 2013 Community Development— Planning Division
11703 E$pra ue AveSuitP 3 ♦ Spokane Valley WA 99206
S V PERMIT C Enc t:P0•5026 Et*
x: 509.688.0037 ptannine®spokanevatlev.or2
I
Spokane Valley Municipal Code( VMC) •edtlQn.:.7.9.40.020.B;`Ail esidentiaLtiriv4way and off-street parking areas shall be paved with
asphalt,Portland cement,gra , •• • • o therequivalent-hardsurfdce material". A paving waiver can only be granted if
the structure,ou are proposing is not going to require a driveway for daily use.
PART I — OWNER INFORMATION
OWNER NAME: R&\3 c* Vex5C>r't PARCEL#: 14,5 2i--) 3
ADDRESS: ' -7 0'"s
CITY: 0�1, A J \Ay STATE: ZIP: legPt g9 0 3 7
PHONE: FAX: CELL: 9 !,3.-`gD'` EMAIL:
P RT II —DETAILS OF PAVING WAIVER
1. Do you have an existing g=rage for parking daily use vehicles? g YES ❑ NO
2. Is the proposed detached structure used for storage only? YES ❑ NO
3. Do you plan on using the ietached structure to park vehicles? ®..YES ❑ NO If yes, then
what type of vehicles? "IL., • A
4. Do you plan to conduct a •usiness from proposed detached structure? ❑ YES .NO If so, what
is the nature of your busi ess?
PART III —AUTHORIZATION
I,(PRINT NAME) owner, hereby confirm that the information provided on this
form is true and correct. I ack owledge that any change in the foregoing conditions, could require
the City to impose paving re•uirements. I further agree to report any change in these conditions to
the Spokane Valley Community Development Department, Planning Division, within 30 days.
-7P4451-- ri iI-73
Owner Signature Date
PART IV— DECISION
STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT
DIRECTOR AND FIND THE REQ EST IS GRANTED AT �� I(, I "111I
SAID ADDRESS FOR PERMIT#: ' L , c - '5 't
O) LI ►� I SS (P- 11- 16 -(
Planning ivision Staff Sign- ure Date
Created 6/27/11 Page 1 of 1
1 1
A
Nock
15706 E
i_152ii 3 ..0 i05
1.n
Ivriq, OPPi°
—I
IM---L -----
\If •
..„.. , 1
6. 11
1 lb, i)
1 in V
I 0 1
CC-1
Z 4 1 7-i---1,--Jcs----9w
in uj L s-1-.1 itS A ome— 441 2.1..
'
.040 III It'
leI ; 19 ' cui)01)f)tro'
• , 1
I— CC
[
..j17
1-
!
-) 0 c c 1
J Lu !,c ') trill
cc
cn sra
no 1
c1:0 D I
cn
1 \-C1'
Target Date sheet
For City Use Only
SifOkane
Project Address
Valley® t
v 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037♦ permitcenter®spokanevalley.org
As part of our on-going commitmen to customer service during the review process of your project application,we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date,we will contact you with a revised target date.
1+ ( � I7,
Your application review TARGET DATE is •
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete,accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
D Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your
target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the i rocess is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent tec 'cal staff from completing the technical review once it is started. When this step is
complete,your application will be routed o the appropriate staff and remain in their review queue until it comes up for review.
3.Technical Compliance.Once an appli ation is administratively complete,it is routed to technical staff for compliance review.
Depending on the type of project, techni..1 staff may include multiple reviewers. You should be contacted by phone,fax, email,
or mail by your TARGET DATE once s- initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve th-ir section of the application and route it to the Permit Center.When all sections of the
application are received, a Permit Specia ist will process the application and contact the person specified on your application for
permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at
that time.
CD-003 V-7/06-21-11 Page 1 of 1